Skip to main content

VIEW LARGER COVER

TRB’s Airport Cooperative Research Program (ACRP) Report 82: Preparing Peak Period and Operational Profiles—Guidebook describes a process and includes software for converting annual airport activity forecasts into forecasts of daily or hourly peak period activity. The two Excel-based software modules are designed to help estimate current and future design day aircraft and passenger operation levels based on user-defined design day parameters.

The two modules are included with the print version of the guidebook in CD-ROM format. The CD-ROM is also available for download as an ISO image. Links to the ISO image and instructions for burning a CD-ROM from an ISO image are provided below.

A final report documenting the entire research effort that produced ACRP Report 82 was published under a separate cover as ACRP Web-Only Document 14.

Help on Burning an .ISO CD-ROM Image

Download the .ISO CD-ROM Image

(Warning: This is a large file and may take some time to download using a high-speed connection.)

CD-ROM Disclaimer - This software is offered as is, without warranty or promise of support of any kind either expressed or implied. Under no circumstance will the National Academy of Sciences or the Transportation Research Board (collectively "TRB") be liable for any loss or damage caused by the installation or operation of this product. TRB makes no representation or warranty of any kind, expressed or implied, in fact or in law, including without limitation, the warranty of merchantability or the warranty of fitness for a particular purpose, and shall not in any case be liable for any consequential or special damages.

Suggested Citation

National Academies of Sciences, Engineering, and Medicine. 2013. Preparing Peak Period and Operational Profiles—Guidebook. Washington, DC: The National Academies Press. https://doi.org/10.17226/22646.

Import this citation to:

Publication Info

130 pages |  8.5 x 11 |  DOI: https://doi.org/10.17226/22646
loading iconLoading stats for Preparing Peak Period and Operational Profiles—Guidebook...