Cast-in-Place Concrete Connections for Precast Deck Systems (2011) / Chapter Skim
Currently Skimming:


Pages 452-455

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 452...
... 453 Chapter 14 Full-Depth Deck Panel and Decked Bulb-T: Summary 14.1. Summary Speed of construction, particularly for bridge replacement and repair projects, has become a critical issue to minimize disruption of traffic and commerce.
From page 453...
... 454 Table 14.1.1: Proposed performance criteria of CP materials Performance Characteristic Test Method Performance Criteria Compressive Strength (CS) , ksi ASTM C39 modified 6.0≤CS @ 8 hours (overnight cure)
From page 454...
... 455 studies and was deemed to be a viable connection system to provide continuity in jointed deck systems over piers. Figure 14.1.1: Dimension of Slab Specimen 5)
From page 455...
... 456 may be required to develop the reinforcement across the joint. An alternative is to use stainless steel reinforcement which performed well in the initial study, but was an expensive alternative.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.