Operation of Light Rail Transit through Ungated Crossings at Speeds over 35 MPH (2012) / Chapter Skim
Currently Skimming:


Pages 5-6

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 5...
... TCRP Web-Only Document 53 1 CHAPTER 1: INTRODUCTION TCRP Web-Only Document 53 presents the findings and results of the investigation conducted in support of TCRP Project A-32, "Operation of Light Rail Transit through Ungated Crossings at Speeds over 35 MPH." In addition, this report presents the findings of the micro-simulation modeling conducted as an alternative to an evaluation of the impacts of higher LRV speeds on selected locations in San Jose. The project panel agreed that the modeling was a feasible and valid alternative to a field test, necessitated by the City of San Jose's decision to not participate in a field test.
From page 6...
... TCRP Web-Only Document 53 2 Chapter 5 presents the risk analysis conducted for the TCRP A-32 project. The risk analysis considers the probability that a crash (or crashes)

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.