Management of the military facilities procurement program. Final report (1971) / Chapter Skim
Currently Skimming:


Pages 77-78

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 77...
... I INTRODUCTION At the request o f the Assistant f o r Construction Operations, Office of the Assistant Secretary o f Defense ( I n s t a l l a t i o n s and Lo g i s t i c s ) , the Building Research Advisory Board o f the National Research Council, National Academy o f Sciences, has undertaken a study of m i l i t a r y construction management Need f o r the study results from both the current urgency f o r reducing defense costs and the goals o f the m i l i t a r y construction program OBJECTIVES OF THE STUDY Objectives of the stuc^ are 1 t o analyze the ex i s t i n g system(s)
From page 78...
... Desirable Engineering-Air Force) , design, construction, stpervision, and inspection procedures, systems, and organizational structure enployed 2 Related a c t i v i t i e s supporting m i l i t a r y construction programs such as personnel administration, legal counsel, and f i s c a l mana^ment Spe c i f i c a l l y , the above includes, but i s not l i m i t e d t o (1)

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.