From page 58... ...
This survey includes questions related to drainage design, pavement structure consideration, construction, maintenance, preservation, and rehabilitation activities. Your thoughtful and complete responses are very important, as they will lead to improved guidance on mitigating moisture-related pavement damage, which in turn will improve pavement performance and reduce pavement life-cycle costs.
|
From page 59... ...
system or to respond to specific conditions and events that restore the highway system to an adequate level of service." Source: AASHTO Highway Subcommittee on Maintenance. • Separator layer includes granular base materials or an appropriate geosynthetic placed to prevent mitigation of fine material from the subgrade into the pavement structure and deflect infiltrated water into a drainage system.
|
From page 60... ...
(effective) Aggregate permeable base Asphalt permeable base Cement permeable base Curb and gutter Daylighted base Ditches Edge drains Fin drains Geosynthetic separator layer Open-graded friction course Permeable friction course Retrofit edge drains Underdrain Other (please specify)
|
From page 61... ...
? High or perched water tables are typically not a concern Install culverts Install edge drains Increase depth of ditch Other (please specify)
|
From page 62... ...
Number of passes (please specify criteria: __________) Aggregate gradation Binder content (please specify criteria: __________)
|
From page 63... ...
? Alligator cracking Bleeding Heaving Increased roughness Longitudinal cracking Patching Potholes Pumping Raveling Transverse cracking Rutting Segregation Stripping Other (please specify)
|
From page 64... ...
Inspect outlet pipes and pipe systems (please specify frequency: __________) Flush edge drains (please specify frequency: __________)
|
From page 65... ...
? Asphalt overlay Unbonded concrete overlay Asphalt overlay and saw and seal Mill and asphalt overlay Mill, asphalt overlay, and saw and seal Cold in-place recycling Hot in-place recycling Reconstruction Retrofit edge drains Other (please specify)
|
From page 66... ...
. Other (please specify)
|