1

Introduction

This report is the product of a congressional request1 to the National Academies of Sciences, Engineering, and Medicine for an evaluation of the general viability of the U.S. Department of Energy’s National Nuclear Security Administration’s (DOE-NNSA’s2) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP) (DOS 2010). Congress asked the National Academies to evaluate two issues:

  • DOE-NNSA’s plans to ship, receive, and emplace surplus plutonium in WIPP; and
  • DOE-NNSA’s understanding of the impacts of these plans on WIPP and WIPP-bound waste streams.

See Box 1-1 for the full statement of task.

___________________

1 The mandate appears in House Report 114-532, Energy and Water Development Appropriations Bill of Fiscal Year 2017(U.S. Congress 2016).

2 Throughout this report, the committee refers to DOE’s National Nuclear Security Administration as “DOE-NNSA,” the DOE’s Office of Environmental Management as “DOE-EM,” and to the broader Department of Energy as “DOE.”

Suggested Citation:"1 Introduction." National Academies of Sciences, Engineering, and Medicine. 2018. Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report. Washington, DC: The National Academies Press. doi: 10.17226/25272.
×

The National Academies appointed a committee of 13 technical experts to carry out this evaluation; their biographies are provided in Appendix A. The committee held eight meetings to gather information for this evaluation and prepare this Interim Report; agendas for the committee’s information-gathering meetings are provided in Appendix B.

This report, the first of two to be issued during this study, was developed to provide initial input to Congress and advice to DOE-NNSA within the originally estimated timeline of the study. It provides an interim evaluation of the general viability and issues surrounding the DOE-NNSA’s conceptual plans as assessed by the information provided to date. The committee’s assessment for this Interim Report is a high-level review of the proposed diluted and dispose process, current WIPP capacity, and requirements of the PMDA. The second report, to be issued at the conclusion of the study, will address the entire statement of task (Box 1-1). Key documents and information such as National Environmental Policy Act (NEPA) strategies and decisions, criticality and performance assessments, plans for international monitoring and verification, and programmatic information contained within DOE’s life-cycle cost estimate are not publicly available for the committee’s review. Therefore, the viability of DOE-NNSA’s conceptual plans on transportation safety, security, and regulatory compliance (Task 2.a), and pre- and post-closure safety and performance of WIPP (Task 2.d) are not addressed.

This report is organized into three chapters:

  • Chapter 1 (this chapter) provides information about the tasking for this study.
  • Chapter 2 describes the proposed disposition of surplus plutonium by the United States, including DOE-NNSA’s conceptual plans for disposing of 34 MT of surplus plutonium in WIPP.3
  • Chapter 3 provides committee interim findings, conclusions, and recommendations as well as questions on DOE-NNSA’s conceptual plans.

The committee distinguishes between findings, conclusions and recommendations using the following criteria:

  • Findings: summary statements about the evidence with which no reasonable person could argue without rejecting the evidence—no judgment is involved,
  • Conclusions: judgments based on one or more findings or analysis of the evidence—never contain the word “should,”
  • Recommendations: proposed actions based on one or more conclusions—usually contain the word “should” and indicates an actor and an action.

___________________

3 Dispositioning, disposal and storage are used throughout this report with the following definitions (as defined by the International Atomic Energy Agency (IAEA 2016): Dispositioning: Consigning of, or arrangements for the consigning of, radioactive waste for some specified (interim or final) destination, for example for the purpose of processing, disposal or storage. Disposal: Emplacement of waste in an appropriate facility without the intention of retrieval. Storage: The holding of radioactive sources, radioactive material, spent fuel or radioactive waste in a facility that provides for their/its containment, with the intention of retrieval.

Suggested Citation:"1 Introduction." National Academies of Sciences, Engineering, and Medicine. 2018. Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report. Washington, DC: The National Academies Press. doi: 10.17226/25272.
×
Page 6
Suggested Citation:"1 Introduction." National Academies of Sciences, Engineering, and Medicine. 2018. Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report. Washington, DC: The National Academies Press. doi: 10.17226/25272.
×
Page 7
Next: 2 Disposition of Surplus Plutonium by the United States »
Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report Get This Book
×
Buy Paperback | $40.00 Buy Ebook | $32.99
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report evaluates the general viability of the U.S. Department of Energy's National Nuclear Security Administration's (DOE-NNSA's) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. This report evaluates DOE-NNSA's plans to ship, receive, and emplace surplus plutonium in WIPP and its understanding of the impacts of these plans on WIPP and WIPP-bound waste streams. This report, the first of two to be issued during this study, provides a preliminary assessment of the general viability of DOE-NNSA's conceptual plans, focusing on some of the barriers to their implementation.

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    Switch between the Original Pages, where you can read the report as it appeared in print, and Text Pages for the web version, where you can highlight and search the text.

    « Back Next »
  6. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  7. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  8. ×

    View our suggested citation for this chapter.

    « Back Next »
  9. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!