Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
12 Data Analysis The investigation team studied the electrical fires listed in the bus and rail databases created for the work described in Chapter 2. The primary cause for most of these incidents was classified by the transit agencies supplying the information as either âmaintenance issuesâ or maintenance related. This implies that a maintenance process was either missed or completed in a way that contributed to the origin or spreading of the fire. The team noted that most of the incidents occurred many years after the vehicles were manufactured, which is an indication that the orig inal vehicle designs were not significant causes of or contributors to the fires. Many transit survey recipients that responded to the teamâs questionnaire concerning fires on vehicles indicated that training and maintenance were the primary areas where they needed assistance. As a result, the research team investigated the types of training and maintenance guidelines that would help prevent future fire occurrences. The team focused on preventive maintenance processes and training programs for maintenance personnel assigned to PMIs. Some of the transit systems responding to the teamâs questionnaire indicated that their approach to preventing electrical fires included the development of PMI programs that emphasized fire prevention. The team approached these properties for additional information that could be used to develop best practices and recommended guidelines for bus and rail PMIs. One such best practice was the creation of a training program that teaches technicians how to identify and reduce electrical fire risk factors. To reduce the hazards of electrical fires on transit vehicles, the investigation team is proposing that transit systems review their current PMI programs and ensure that they are designed to identify potential thermal events before they occur and make the proper repairs. A robust PMI program is the foundation for a successful fleet maintenance operation. Three key aspects of an effective PMI program are the design of the inspection process, the staffing of the program, and the inclusion of predictive maintenance elements in the program. Design of the Inspection Process All bus and rail car manufacturersâ maintenance manuals contain recommendations for items that need to be checked during inspections. The research team is suggesting that transit mainte nance departments review the electrical sections of the manuals for their entire fleet to ensure all procedures for the clamping and securement of power cables, cable routing, and inspection of insulation condition are included in their PMI procedures and inspection checklists. Inspections should include the testing of connections for proper securement. All bolted cable connections need to be periodically retorqued to the manufacturerâs recommendations. C H A P T E R 3 Guidance on Reducing the Incidence of Electrical Fires
Guidance on Reducing the Incidence of Electrical Fires 13  There are no known detailed American standards for the inspection of electrical cabling on buses and rail cars. The Australian government publishes a standard for fire protection of mobile equipment: Standard AS 5062. Section 3.3.1.4 of the Australian Standard provides guidelines for inspection of vehicles to reduce the potential for fire risk. These guidelines include checks for: ⢠Clamps not being tightened; ⢠Missing cable clamps; ⢠Incomplete maintenance activities that may have created additional fire risks; and ⢠Damage or deterioration of cables and mechanical components. The research team is proposing that these Australian inspection guidelines be incorporated into all transit system PMI procedures. When the engineers for vehicle manufacturers design buses and rail cars, they route and secure cables and electrical wiring to minimize the risk of shorting. When maintenance crews change out components, they may not replace clamping devices properly or route cables the way the manufacturer designed. This results in an increased chance of electrical fires. The research team is proposing that transit systems photograph the engine compartments and power cable routing of all new buses and rail cars. This will create a graphic record of the original cable routing, which will serve as a valuable tool for crews inspecting and making repairs to the vehicles. Cable routing diagrams should be included in repair manuals or repair instructions when appropriate. Inspection Staff Just as important as the inspection process is the need to have qualified, experienced mechanics performing the PMIs and making the proper repairs. It is critical that the mechanics doing the PMIs be able to identify the potential electrical fire hazards and make the necessary repairs to prevent fires from occurring. The investigation team found that the qualifications of the PM inspectors at different transit systems varied significantly. Some properties scheduled their inspections for the night shift, which resulted in mechanics with little experience per forming inspections. Other locations used their more experienced mechanics to do trouble shooting, leaving the PMIs to the less experienced members of the staff. The project team is proposing that transit systems assign experienced mechanics to perform PMIs and repairs. If it is not possible to assign experienced mechanics to perform the PMIs, it is suggested that systems implement a program where an experienced mechanic and/or firstÂline maintenance supervisor makes spot checks of the work performed on PMIs. Proposals for the Training of PM Inspectors The research team suggests that all transit systems examine the training provided to the mechanics who perform PMIs to make sure it is adequate for identifying fire risks. Several of the survey recipients interviewed advised the research team that they feel it takes 5 to 6 months to train an experienced mechanic to become a âQualified PM Inspector.â As a minimum, a good training program for mechanics assigned to do PMIs should include several days of class room training coupled with many hours of handsÂon training. The classroom portion should emphasize the vehicle manufacturerâs PMI guidelines. It should also include thorough physical reviews of each type of vehicle in the systemâs fleet, emphasizing proper hose and cable routings for each one. Photographs of improper routing, chaffing conditions, and improper clamping should be presented to the students. This will help the student understand why PMIs are such a critical part of the vehicle maintenance program. Each student should be given an instruc tion manual describing how to complete each item on the inspection checklist for each type of
14 Assessing and Mitigating Electrical Fires on Transit Vehicles vehicle in the fleet. The manual should contain all important vehicle specifications and a series of illustrations showing the original routing of all hoses and cables. At the end of the class each student should be required to pass a test identifying actual defects planted on a vehicle by the training staff. After completing the classroom portion of the training, it is a proposed best practice to assign each student to an experienced PM inspector for several months of mentoring. Once the training inspector and the shift supervisor feel the student is capable of performing inspections inde pendently, the student could begin to perform scheduled PMIs on a solo basis. The supervisor needs to monitor the studentâs performance. It will be up to the supervisor to determine when the student becomes a âQualified PM Inspector.â Predictive Maintenance Functions A number of the survey recipients that responded to the teamâs questionnaire advised that they did not have many issues with electrical fires on their vehicles because they had incorpo rated predictive maintenance work into their PMI programs. The theory behind effective pre dictive maintenance is to replace critical components as they approach the end of their useful life and before they fail in service. Bus maintenance staffs reported that they change starters, alternators, and fan motors on a mileage basis. Rail staffs talked about changing traction motors, current collection equipment, and main power cables with support brackets on a time and/or mileage basis. Sometimes these component changes are included in their planned midÂlife or quarterÂlife overhaul programs. These types of programs are eligible for Federal Transit Admin istration (FTA) funding which minimizes the effect on the propertyâs operating budget. The research data indicates that adding predictive maintenance to the PMIs is a good way to reduce the risk of electrical fires on buses and rail cars. The investigation team is proposing that all systems add predictive maintenance to their PMI programs.