National Academies Press: OpenBook

Design Practices for Rock Slopes and Rockfall Management (2022)

Chapter: Appendix D - Department of Transportation Provided Documentation

« Previous: Appendix C - Individual Survey Responses
Page 147
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 147
Page 148
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 148
Page 149
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 149
Page 150
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 150
Page 151
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 151
Page 152
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 152
Page 153
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 153
Page 154
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 154
Page 155
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 155
Page 156
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 156
Page 157
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 157
Page 158
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 158
Page 159
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 159
Page 160
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 160
Page 161
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 161
Page 162
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 162
Page 163
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 163
Page 164
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 164
Page 165
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 165
Page 166
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 166
Page 167
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 167
Page 168
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 168
Page 169
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 169
Page 170
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 170
Page 171
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 171
Page 172
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 172
Page 173
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 173
Page 174
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 174
Page 175
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 175
Page 176
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 176
Page 177
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 177
Page 178
Suggested Citation:"Appendix D - Department of Transportation Provided Documentation." National Academies of Sciences, Engineering, and Medicine. 2022. Design Practices for Rock Slopes and Rockfall Management. Washington, DC: The National Academies Press. doi: 10.17226/26636.
×
Page 178

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

147   Department of Transportation— Provided Documentation A P P E N D I X D This appendix contains documents provided by state DOTs to represent their policy documentation relevant to rock slopes and rockfall. These documents are current at the time of submission by the DOT (January and February 2021); however, the reader is advised to contact the DOTs for the most current version. A summary of state and documentation type is provided in the following table. DOT Documentation Type Iowa Design Manual Section 200F-8 Rock Cut Slopes Kentucky Policy Documents GT-608-6, Slope Design Without Intermediate Benches & With Catchment Areas, and GT-608-5, Roadside Ditch Bench North Carolina Rock Slope Design Guidelines Ohio Geotechnical Bulletin GB3, Rock Cut Slope & Catchment Design, 1/15/2016 Washington Design Manual M 22-01 Roadway Sections in Rock Cuts, Design A Utah Geotechnical Manual of Instruction, Cut Slopes Tennessee Standard Drawing for Rock Cut Slope and Catchment Details

148 Design Practices for Rock Slopes and Rockfall Management Page 1 of 2 This section addresses the typical rock slope configurations routinely used by the Iowa DOT during the planning of roadway projects. Rock mass improvement techniques such as bolting, dowelling, shotcreting, etc., to produce a stable slope are not covered herein. The Soils Design Section is generally responsible for determining precisely where rock excavation is necessary and where rock backslopes will be used, but coordination with the Design Section is necessary. Rock excavation procedures are outlined in Section 5B-1. The guidelines for rock cut slopes contained herein are similar to soil cut slopes configurations outlined in Section 200F-11. Rock Mass Information Rock slope design relies heavily upon the quality of the rock, which is determined by surface mapping and rock coring to assess discontinuities (fracture/joint) patterns and conditions. Discontinuities strongly control rock mass quality and slope stability. If surface mapping is not feasible due to the presence of overburden soil, or for other reasons, rock coring should be performed to obtain the required rock mass quality data. In addition, the groundwater conditions, and particularly water seepage present in rock discontinuities, should be evaluated as part of the subsurface exploration. The rock quality data will be summarized in the S3 and/or S4 event submittals. Rock Slope Configurations Design Details 4110 or 4111 should be used to begin design of rock backslope sections for rock cuts greater than 5 feet. Finalization of rock backslope design should be done jointly between the applicable Design Section and the Soils Design Section to insure the optimum section and to define the rock excavation requirements for the project. Steepened backslopes should be avoided in areas of shale, weathered or broken and weathered limestone, or similar inferior rock unless specifically reviewed and analyzed by the Soils Design Section and the Design Section. Where the depth of rock excavation in any given area is 5 feet or less, design practice is to provide a normal ditch section; however, this is typically reviewed on a case-by-case basis. A flat bottom ditch with a minimum width of 10 feet is generally required for all rock cut slopes as shown in Design Detail 4101. Limestone, Dolomites, Cemented Sandstones, and other Hard Rocks Rock slopes in good-quality limestones, dolomites, and cemented sandstones may be cut nearly vertical or with a slight inclination. An inclination of 0.5H:1V is used for normal rock excavation, and an inclination of 0.25V:1H is used when pre-splitting is performed for rock excavation. Benches should be provided at a vertical spacing not to exceed 35 feet for cut slopes greater than 35 feet high. Benches should generally be a minimum of 10 feet wide. Benches may be provided at the contacts Rock Cut Slopes 200F-8 Design Manual Chapter 200 Geotechnical Design Originally Issued: 01-15-14 Revised: 08-17-16 Quick Tips: • The Soils Design Section is generally responsible for identifying precisely where rock excavation is necessary and where rock backslopes will be used, but coordination with the Design Section is necessary. • Finalization of the required rock slope typical section should be done jointly between the Design Section and the Soils Design Section. • Steepened backslopes should be avoided in areas of shale, weathered, or broken and weathered limestone, and similar inferior rock unless specifically reviewed and analyzed by the Soils Design Section and the Design Section. Office of Design

Department of Transportation—Provided Documentation 149   Chapter 200—Geotechnical Design Section 200F-8—Rock Cut Slopes Page 2 of 2 of different formations (not necessarily at 35 feet) and may vary in width. The typical rock slope configurations for excavation of rock with and without presplitting are shown in Design Details 4110 and 4111. The Soils Design Section determines when pre-splitting of the rock is needed and appropriate based on rock quality, rock hardness, etc., and prepares a pre-splitting tab, Tab 107-25. Shales, Siltstone, and other Soft Rocks Cut slopes in shale, siltstone, and other soft rocks should be inclined at no steeper than 2H:1V. Detailed Rock Slope Design If the project requires a detailed rock cut design or stabilization techniques, FHWA HI-99-007 Rock Slopes Reference Manual, (Munfakh, et al., 1998) should be used in the design. In addition, if development of blasting plans for rock cut excavation is required, FHWA-HI-92-001 Rock Blasting and Overbreak Control, (Konya and Walter, 1991) should be used. References 1. Konya, C. J., and Walter, E. J., 1991, Rock Blasting and Overbreak Control, Federal Highway Administration, FHWA-HI-92-001. 2. Munfakh, G., Wyllie, D., and Mah, C. W., 1998, Rock Slopes Reference Manual, Federal Highway Administration, FHWA HI-99-007.

150 Design Practices for Rock Slopes and Rockfall Management Chronology of Changes to Design Manual Section: 200F-008 Rock Cut Slopes 8/17/2016 Revised Replaced link to 5A-1 with link to 5B-1. 1/15/2014 NEW New

Department of Transportation—Provided Documentation 151   GT-608-6 06/05 Page 1 of 1 Section CUT SLOPES IN ROCKEOTECHNICAL Subject Slope Design without Intermediate Benches & with Catchment Areas POLICY: Design of a rock cut slope without intermediate benches should be used with a roadside ditch catchment area. The continuous cut slope design should be considered under the following circumstances: Rock is homogenous. Rock consists of limestones of low KY RQD numbers that are interbedded with shale of low SDI numbers. Intermediate benches will accumulate debris rapidly, making them ineffective. Joints are discontinuous, and massive failures are unlikely. The roadside ditch catchment area (Exhibit 21) is to be designed using the guidelines outlined in the “Rockfall Catchment Area Design Guide” Final Report, which was published by the Oregon Department of Transportation Research Group and FHWA (November 2001) [SPR-3- 032 (Report # FHWA-OR-RD-02-04)]. The “Rockfall Catchment Area Design Guide” is a current state-of-the- practice reference for sizing rockfall catchment areas for 40- to 80-foot (12- to 24-meter) high cut slopes. A copy of the guidelines is available upon request from the Kentucky Department of Highways, Division of Materials, Geotechnical Branch.

152 Design Practices for Rock Slopes and Rockfall Management GT-608-5 06/05 Page 1 of 1 Section CUT SLOPES IN ROCKEOTECHNICAL Subject Roadside Ditch Bench USE OF ROADSIDE DITCH BENCH: When cut slopes are steeper than 3H:2V and the 30-foot (9-meter) safety clear zone from edge of pavement to the cut slope is not required, a roadside ditch bench is recommended. Typically the width of the roadside ditch bench from outside edge of shoulder to the cut slope will be 12 feet (3.5 meters) for cuts less than 30 feet (9 meters) in height, and 14 feet (4.3 meters) for cuts over 30 feet (9 meters) in height.

Department of Transportation—Provided Documentation 153   SECTION 4 Page 29 quantities listed are in addition to previous quantities or in place of previous quantities on all but the first version of the chart. Be sure to coordinate with the GeoPavement Section to determine if some quantities have already been turned in with their pavement design report. 4.4.4 Geotechnical Summary of Quantities The Geotechnical Summary of Quantities is provided to the Roadway Design Unit as a reference for certain Geotechnical Recommendations that must be included in the contract. The Roadway Design Unit copies the tables from the Geotechnical Summary Quantities for these items. The Geotechnical Summary of Quantities is not part of the Roadway Recommendations report but must be included in the “NONCADD” digital folder transmitted to “ProjectStore” upon completion of the Geotechnical reports. 4.4.5 Special Provisions Special Provision recommended in the report should be listed at the end of the report and when needed should be attached after the Geotechnical Summary of Quantities chart. Project special provisions should include all necessary instructions for the contractor. Instructions to the contractor should not be included in the text of the recommendation report since the recommendations report is not provided to the contractor. 4.5 Design Considerations The project design engineer shall be responsible for determining (but not limited to) the following items in connection with the geotechnical design of the roadway project. Provide construction detail sketches with special provisions along with the soil profile or cross section sheets as needed. 4.5.1 Soil Cut Design Determine the stability of cut sections. Utilize recognized geotechnical engineering designs and construction methods to insure cut slope stability. The field investigation should provide adequate mapping, data and testing to prove stable soil slopes through soil classification, groundwater characteristics, actual or assumed cohesive and/or friction values, unit weights and other input necessary for proper modelling. 4.5.2 Rock Cut Design Exposed outcrop should be shown on plans and cross sections and incorporated with drilling information to accurately depict rock elevations and quantities. Rock slope designs should be proven with data derived from outcrop line mapping and drilling that include but are not limited to: Rock type, mineralization and related hardness and durability; orientations of geologic discontinuities such as bedding, foliation, joints, faults and fractures; block size; groundwater characteristics; roughness and friction values for discontinuities; degree of weathering; recovery and RQD from drilled cores, etc., depending on the requirements of the analysis. Weathered rock stability is a special case in which sampling and determination of strength parameters is often difficult. Consideration must be made for parent rock type, mineralization (including presence of Magnesium oxide, MnO, on discontinuity weathering planes), bulk strength characteristics (typically derived from SPT’s) and direct shear strength testing (when feasible to obtain). NCDOT Rock Slope Design Guidelines

154 Design Practices for Rock Slopes and Rockfall Management SECTION 4 Page 30 When designing rock slopes it is necessary to consider and include references to blasting. These may be done through the “Rock Blasting” Provision that may include pre-split blasting as a Geotechnical Special Provision or fall under the guidelines of Section 220 “Blasting” in the 2012 Standard Specifications. On slopes 1:1 or steeper where rock reaches 50% RQD, NCDOT expects pre-split blasting to be considered and a project Special Provision concerning this shall be included in the Recommendations. Slopes steeper than 1:1 should not be considered without pre-split or controlled blasting techniques. When designing rock slopes with catchment areas or attenuation devices, NCDOT expects a 90% rockfall retention rate at the paved shoulder edge, once all considerations for a clean, scaled and stable cut have been achieved. 4.5.3 Degradable Rock Considerations Degradable rocks include typically sedimentary and weak metamorphic rocks that occur in the mountains and Triassic basins of the Piedmont. Once exposed in cuts or used as excavated material in other construction activities they degrade or slake. Cut slope design should reflect differential weathering and long-term slope stability. Consider catchment area and how slope failure could affect properties above cuts. Degradable material used as fill should consider the properties once they have weathered. Slake tests may be desirable. 4.5.4 “Hot” Soil and Rock (Acid-Producing Materials) These rocks produce acidic runoff when their sulfide minerals are exposed to air and water. This comes from freshly exposed rock faces and blasted and excavated rock and material from the rock units. There is particular concern in the Mountain region in Clay, Cherokee, Graham, Swain, Macon, Jackson and Haywood counties. Acidic units in the Coastal plain are Cretaceous in age and generally belong to the unoxidized portions of the Peedee, Black Creek, Middendorf and Cape Fear Formations. These typically need to be noted and accounted for at the Project Development stage. It may be necessary to have fresh hand or drilled samples tested early in Project Development or subsurface investigation stages to answer concerns from project permitting (tested for Net Neutralization Potential). Dealing with this issue is highly specialized and customized to individual projects. Consultants should utilize known experienced professionals in the topic or consult with the Western or Eastern Region Manager of the GEU if a proposed project is located in the listed locations. Testing and mapping are ongoing so up-to- date searches on the topic should occur in the pre-Field Investigation phase. 4.5.5 Embankment Slope Stability and Reinforced Slopes 1. Determine the stability of embankments and utilize recognized geotechnical engineering design and construction procedures to insure embankment stability. a. The feasibility of using geo-textiles to achieve stability, reduce excavation of soft soils, and reduce the effect of settlement on the roadway. b. The feasibility of using sand drains or wick drains to increase the rate of consolidation of compressible soils beneath embankments. NCDOT Rock Slope Design Guidelines

Department of Transportation—Provided Documentation 155   Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 3 ROCK CUT SLOPE & CATCHMENT DESIGN January 15, 2016 Geotechnical Bulletin GB3 was developed by the Office of Geotechnical Engineering. The first edition of GB3 was dated January 13, 2006. This edition supersedes all previous editions. This Geotechnical Bulletin is intended to provide guidance on the design of rock cut slopes, rockfall catchment, and rockfall controls. Recommendations presented in this manual are based on research presented in Shakoor and Admassu (2010) entitled “Rock Slope Design Criteria” (State Job Number 134325), previous FHWA co- sponsored research, and the experience of the Office of Geotechnical Engineering (OGE). These guidelines should be viewed as the presentation of the philosophy of the OGE regarding rock cut slope and catchment design. It is not possible to provide design guidance for all potential scenarios. If a scenario is encountered that falls outside those described in this Bulletin, the design is recommended to be done in consultation with the OGE or District Geotechnical Engineer (DGE). The Designer is responsible for preparing a design that is based on a site-specific geotechnical exploration and achieves the optimal balance of safety, construction costs, and future maintenance costs. The use of “template” designs shall be avoided. Instead, the designer shall use appropriate information regarding the site geology, slope of the natural hillside, and the condition of cut slopes in similar geology within proximity to the project to determine the appropriate slope configuration. The designed configuration will be influenced by lithology, rock properties, and bedrock structure. Research and experience has shown that a consistent design methodology can be formulated by using properties such as intact rock strength, rock durability, fracture frequency, regional joint characteristics, and other common rock properties. The design approach first satisfies the overall global stability of the rock cut. It is recognized that in nearly all cases typical geologic and geometric conditions exist throughout Ohio, namely nearly horizontally bedded sedimentary rock strata with a range of lithologies that include limestone, dolomite, sandstone, siltstone, shale, claystone and coal. In this Bulletin, those strata defined as shale in the ODOT Construction and Material Specifications (C&MS) Item 203.02.P are considered a rock type and are included in this manual. Based on practice, OGE experience, and results of research (Woodard, 2004; Shakoor and Admassu, 2010), it is recognized that the primary cause of degradation and failure of rock cuts in Ohio are the differences in

156 Design Practices for Rock Slopes and Rockfall Management GB3: Rock Slope Design January 15, 2016 Page 2 of 18 durability of rock units and intersecting discontinuities found throughout Ohio. The design approach presented in this manual accounts for these differences in durability of geologic units as well as anticipated geologic structure encountered in most rock cuts in Ohio. The typical geologic structure present in Ohio makes the necessity for rigorous rock mechanics structural analysis (kinematic analysis) rare for cut slope designs in Ohio. If the designer believes a detailed kinematic analysis is necessary, contact the DGE or OGE, as the design may be beyond the bounds of these guidelines. The Designer should note that the guidelines presented in this document may result in a designed slope with varying slope angles and benches where the excavation quantities and/or costs are similar to simply creating a continuous 1.5H: 1V cut slope, for example. The use of a continuous slope through varied geologic formations, while possibly simplifying construction, may not effectively address long-term conditions with respect to weathering. Therefore, replacing the designed rock slope with a constant slope is generally not recommended. OGE recognizes that rockfall poses a serious geologic hazard and the selection of appropriate slope configurations, as well as rockfall catchment controls, will minimize this hazard. This manual presents guidelines to be used as a basis to provide adequate rockfall catchment and controls based on OGE experience and FHWA co-sponsored research. Expanded discussion of the items in this document can be found in the ODOT Rock Slope Design Guide, which along with this Bulletin and other information may be obtained from the Office of Geotechnical Engineering’s web site (http://www.dot.state.oh.us/Divisions/Engineering/Geotechnical/Pages/default.aspx). This web site contains other ODOT geotechnical documents and bulletins, including an online copy of the Geotechnical Engineering Design Checklists and Specifications for Geotechnical Explorations (SGE), which are referenced in this document.

Department of Transportation—Provided Documentation 157   GB3: Rock Slope Design January 15, 2016 Page 3 of 18 A. Definitions Lithologic Unit: A body of rock comprised of a similar mineral composition, grain size, and engineering characteristics. Competent Unit: A lithologic unit described as a limestone, sandstone, or siltstone and based on the following guidelines: • Any limestone or sandstone visually described as moderately strong or stronger based on SGE 605.5 • Any limestone or sandstone visually described as very weak, weak, or slightly strong based on SGE 605.5; have a unit weight of 140 pcf or greater; or a unit weight less than 140 pcf with a second cycle (Id2) SDI value of 85 percent or greater as based on ASTM D 4644 • Any siltstone with a second cycle (Id2) SDI greater than 85 percent as based on ASTM D 4644. Incompetent Unit: A lithologic unit described as shale or claystone, or a competent lithologic unit described as slightly strong, weak, or very weak based on SGE 605.5, with a unit weight less than 140 pcf and an Id2 value less than 85 percent. Design Unit: A portion of a slope, or the entire slope, that can be cut at a consistent angle. A design unit may be comprised of single or multiple lithologic unit(s). A design unit can be selected on the basis of characteristic lithology and the anticipated slope failure(s). The thickness of a design unit can range from a relatively short thickness (minimum 10 feet) to the height of the entire cut slope. Three (3) design units are considered in this Bulletin, defined as follows: 1. Competent Design Unit: Consists of greater than 90 percent competent units. The failures anticipated to occur in this design unit are those controlled by unfavorable orientation of discontinuities (plane, wedge, or toppling failures). 2. Incompetent Design Unit: Consists of greater than 90 percent incompetent units. The failures anticipated in this design unit include raveling, mudflows and rotational slides. 3. Interlayered Design Unit: Consists of interlayered competent and incompetent units, each ranging in proportion from more than 10 percent to 90 percent. Undercutting-induced failures (rockfalls) and mudflows are the anticipated primary failures in this design unit. However, raveling and rotational slides are possible.

158 Design Practices for Rock Slopes and Rockfall Management GB3: Rock Slope Design January 15, 2016 Page 4 of 18 B. Subsurface Exploration Exploration for a rock cut slope, which includes geologic explorations, data collection, and presentation of information, are vital to the design and construction of rock cut slopes. Each specific project involves unique situations and the explorations should be planned accordingly. When designing the rock cut slope configuration, evaluations of the current conditions of existing cuts or nearby exposures of the same material should be performed, if available, and used to confirm the appropriateness of a design slope angle. For example, if a slope appears to be stable at a 1:1, then a new slope cut at 1:1 should also be anticipated to be stable. Additionally, the County Manager, or an individual knowledgeable with the cut, should be contacted to determine the past maintenance and performance of an existing cut slope, or nearby cut slopes. Periodic maintenance can mask the true performance of a slope. New rock cuts excavated in areas where there typically are limited (if any) rock exposures, will require a detailed subsurface exploration. Existing rock cuts that are located near a new cut area and are located within a similar geology are helpful in assessing the performance of particular rock units. Planning of the subsurface exploration should follow the guidelines presented in the SGE Section 303. The subsurface exploration program (e.g. borings) should be tailored to the site specific conditions determined after the site reconnaissance has been performed. It should be noted that variations can occur even in similar geology, both vertically and horizontally. Occasionally these variations may occur rapidly over just a few feet. Existing rock cut slopes that are to be rehabilitated afford rock exposure that can be studied as part of the exploration efforts. Therefore, depending on the amount of information available and the scope of the remediation, subsurface explorations (e.g. borings) may be limited, or may not be required. The need for subsurface explorations should be assessed after a site reconnaissance is performed and should be tailored on a project specific basis. As an example, a rehabilitation project that is being completed as part of widening of an existing cut that is performing well may not have the need for a detailed exploration. Evaluation of archival subsurface data, as well as geotechnical and geological characterization of the existing cut may be sufficient.

Department of Transportation—Provided Documentation 159   GB3: Rock Slope Design January 15, 2016 Page 5 of 18 Information regarding sampling and testing, including bedrock description and unconfined compression strength testing, is located in Sections 400 and 600 of the ODOT SGE. In addition to the aforementioned specifications, the following requirements should be followed: 1. Perform a representative number of Unconfined Compression Strength Tests (ASTM D 7012) to define conditions for the following lithologic units. If a limestone or sandstone is described using field parameters as slightly strong, weak, or very weak (less than 3,600 psi for unconfined compressive strength) based on SGE 605.5, Unconfined Compression Strength testing is required. The program should include at least one test for each unit listed above. The presentation of the test results should also include the unit weight of the design unit. 2. If there are insufficient sized samples for Unconfined Compression Strength Tests, the Point Load Test should be used. ODOT research (Shakoor and Admassu, 2010) has found that a correlation factor of 24 for competent units or a factor of 12 for incompetent units can be used to correlate Point Load Test Results to Unconfined Compressive Strength Test Results. 3. Perform at least one Slake Durability Test (ASTM D4644) per lithologic unit for the following units: • Competent Design Units: If a limestone or sandstone is described as slightly strong, weak, or very weak (less than 3,600 psi for unconfined compressive strength) based on SGE 605.5 and a unit weight less than 140 pcf then SDI testing is required. For a siltstone, SDI testing is required. • Incompetent Design Units: SDI testing is required. • Interlayered Design Units: SDI testing is required (incompetent lithology only). If the Designer believes additional test procedures are warranted for a specific project, the DGE or OGE should be contacted. Possible tests include, but not limited to, those to determine shear strength, Young’s Modulus, Poisson’s ratio, tensile strength, hydraulic conductivity (falling/constant head or in-situ packer). Additional discussion of explorations can be found in Section 200 of the ODOT Rock Slope Design Manual.

160 Design Practices for Rock Slopes and Rockfall Management GB3: Rock Slope Design January 15, 2016 Page 6 of 18 C. Rock Cut Slope Configuration (Determination of Slope Angle) The design of rock cut slopes is a staged process, with the number of steps dependent on the size of the project. A major project will likely have a preliminary stage consisting of a limited drilling and testing program resulting in preliminary design(s) leading to the final program consisting of the same components on a larger scale. The remainder of the testing program is then conducted on the final boring program, influenced by the preliminary design, to refine the final design. For a small project, the preliminary stage will be very limited, or not performed at all. Only final borings and the final design are completed. The rock cut slope configuration is influenced by a number of factors (lithology, strength, weathering resistance, bedding characteristics, joint inclination, and discontinuities). Three design units (competent, incompetent, and interlayered) have been identified as representing the conditions typically encountered in Ohio. The following sections outline the guidelines for each of the Design Units. 1. Competent Design Units Once it is established that the rock slope will be comprised of competent design units, the cut slope inclination may be determined based on Rock Quality Designation (RQD) as follows in GB3 Table 1: GB3 Table 1 - Cut Slope Angle: Competent Design Units RQD (%) Recommendations 0-50 Cut slope to 1H:1V or consult with the DGE 51-75 Review global stability and design based on engineering judgment or consult with the DGE 76-100 Slope grade of 0.5H:1V, or 0.25:1V for thickly bedded units 2. Incompetent Design Units The design of the slope angle for incompetent design units is based on the average second-cycle SDI (Id2). The following design guidelines (GB 3 Table 2) should be used:

Department of Transportation—Provided Documentation 161   GB3: Rock Slope Design January 15, 2016 Page 7 of 18 GB 3 Table 2 - Cut Slope Angle: Incompetent Design Units SDI (Id2) (%) Recommendations < 20 2H: 1V or flatter -Special design; contact the DGE 20-60 2H: 1V 60-85 1.5H: 1V 85-95 1H: 1V 95-100 1H: 1V or steeper – contact the DGE For incompetent design units that have SDI less than 20 percent, the design should be based on engineering judgment and consultation with the DGE. For slopes steeper than 1H:1V, use engineering judgment and consult with the DGE. 3. Interlayered Design Units Interlayered units exhibit significant stratigraphic variations. Cut slope design recommendations for these units need to take into account these variations. Four stratigraphic configurations, designated as Type A through Type D, are recognized and defined in GB3 Table 3 below: GB 3 Table 3- Definitions of Interlayered design unit types Type Description Type A Very thick (>3 ft) competent units underlain by incompetent units Type B Medium to thick bedded (10 inches to 3 ft) sandstone and siltstone units interbedded or interlayered with incompetent units in variable proportions Type C Medium to thick bedded (10 inches to 3 ft) limestone units interbedded or interlayered with incompetent units in variable proportions Type D Thin bedded (2 to 10 inches) limestone units interbedded with incompetent units in variable proportions

162 Design Practices for Rock Slopes and Rockfall Management GB3: Rock Slope Design January 15, 2016 Page 8 of 18 a. Recommended Cut Slope Design for Type A Stratigraphy Type A stratigraphy, consisting of competent units underlain by incompetent units. Slope instability typically results in topples of flat or cubical rockfalls due to undercutting. Type A stratigraphy may also be interpreted as an incompetent design unit overlain by a competent design unit. For either scenario, design should focus on reducing toppling failures within the competent unit and minimizing excessive weathering of the incompetent unit which causes undercutting of the overlying unit. The cut slope should follow the contour of the contact. Provide adequate catchment area (Section E) and drainage. The following slope design options are recommended for Type A stratigraphy: • Cut the competent rock at 0.5H:1V to avoid toppling failures. If the incompetent unit is of significant thickness (10 feet thick or greater), cut the incompetent unit at an angle as specified in GB3 Table 2. • If the incompetent unit is 3 feet to 10 feet thick, cut at 1H:1V. If the incompetent unit is less than 3 feet thick, cut at the same angle as the competent rock. • If the incompetent unit is 3 feet or greater, provide a geotechnical bench following guidelines in Section D at the contact between units. • When the competent unit consists only of very thickly to massive bedded sandstone, slopes may be cut at 0.25H:1V. Use of this steeper cut slope angle may result in the need for localized or patterned stabilization using rock bolts. The decision to use the steeper cut angle should be based on engineering judgment in consultation with the DGE. b. Recommended Slope Design for Type B Stratigraphy Type B stratigraphy consists of medium to thickly bedded sandstone and siltstone units interbedded or interlayered with incompetent units, which typically results in flat or cubical rockfall debris. The design approach for this type of stratigraphy should be to either cut the slope at a uniform gentle angle to reduce undercutting or cut at a steep slope (0.25H:1V) angle and provide an effective catchment ditch. Due to the thickness of the sandstone units, treating each sandstone unit as a separate design unit and using multiple benches will be impractical in this situation. Two cases are considered.

Department of Transportation—Provided Documentation 163   GB3: Rock Slope Design January 15, 2016 Page 9 of 18 Case 1: Competent lithology comprises 50 percent or greater of unit • Cut the slope at a uniform angle of 1.5H:1V. Provide adequate catchment area (Section E) and drainage. • Cut the slope at 0.25H:1V and evaluate if stabilization of the sandstone/siltstone units in the cut slope is needed. A higher frequency of maintenance should be anticipated. Case 2: Incompetent lithology comprises greater than 50 percent of unit • Cut the slope at 1.5H:1V. Provide adequate catchment area (Section E) and drainage. c. Recommended Slope Design for Type C Stratigraphy Type C stratigraphy, consisting of medium to thick bedded limestone units interbedded or interlayered with incompetent units. These slopes typically produce cubical rockfall debris. Two cases are considered below. Case 1: Competent lithology comprises 50 percent or greater of unit • Cut the design unit at 0.25H:1V for heights of design units not exceeding 25 ft. For design units in excess of 25 feet in height cut at 0.5H:1V. In this case, the incompetent units are too thin to be independently designed. The appropriate design approach should be cutting slopes at steep angles and providing adequate catchment areas. Stabilizing limestone units in the upper portions of the slope, which have a greater potential to release rockfalls, may be justified using engineering judgment with consultation of the DGE. Coal seams are common within this stratigraphy and should be protected from weathering. Placing benches on top of coal seams might not necessarily prevent undercutting.

164 Design Practices for Rock Slopes and Rockfall Management GB3: Rock Slope Design January 15, 2016 Page 10 of 18 Case 2: Incompetent lithology comprises greater than 50 percent of unit In this case, the incompetent units are usually in red bed claystone units. The design approach should focus on reducing the degradation of the thick incompetent units and retaining the weathered material on the slope face by constructing a serrated slope (a series of small, 3-4’ wide benches), especially in zones containing limestone units. The design should be based on the incompetent rock unit and follow procedures in GB3 Table 2. If the slope contains significant thicknesses of red beds, refer to the Special Care Formations sub-section. Provide adequate catchment area (Section E) and drainage. d. Recommended Slope Design for Type D Stratigraphy Type D stratigraphy consists of thinly bedded limestone units inter-layered with incompetent units in variable proportions. This type of stratigraphy is especially prone to releasing flat-shaped rockfalls that can have long trajectories in the presence of steep slopes. Thinly bedded limestone units are most commonly associated with marine limestones that can be identified as fossiliferous (typically found in Southwestern Ohio). Field observations show that where limestone proportion is high (competent/incompetent ratio greater than 0.5) toppling and other types of undercutting-induced failures can occur. Cut slope at 1H:1V or flatter based on engineering judgment. Provide adequate catchment (Section E) and drainage. Special Care Formations These geologic formations identified below are potentially prone to: 1. Rapid weathering because of low durability 2. Gradual change in shear strength caused by weathering 3. Landsliding where over-steepened Special care should be taken when these units are encountered. Design for these units should be based on engineering judgment and consultation with the DGE.

Department of Transportation—Provided Documentation 165   GB3: Rock Slope Design January 15, 2016 Page 11 of 18 The Special Care Formations identified in Ohio include: • Conemaugh formation: red beds–Round Knob Shale (below the Ames Limestone), Clarksburg Red Shale (below the Connellville Sandstone) • Monongahela formation: few red beds–Upper Uniontown Shale, Tyler Shale • Washington formation: red beds–Creston Red Shales • • • Fairview/Kope formation: highly weatherable shale in Cincinnati Area Miamitown formation: weatherable shale in Cincinnati Area Friable Sandstones: e.g. Sharon and Blackhand formations D. Rock Cut Slope Benches The purposes of a bench include: • Providing erosion provisions of a less durable rock underlying a more durable rock where weathering may result in undercutting • Allowing for overall steeper angles of a slope where weaker lithologies are present • Providing stages of construction • Providing transition areas Even though rock slope benches provide some degree of protection against rockfall, this is considered a secondary attribute of benches. Benches should be located to account for construction access and global or localized slope failures and not as a means of rockfall protection. Benches constructed with the specific intent of catchment should be avoided. FHWA discourages mid-slope benches because they are rarely cleaned and could become launching features for rocks (FHWA, 1998). In general, mid-slope benches are not effective for rockfall control unless they are directly beneath a near vertical slope (0.25:1 or steeper). Design of slopes that include a maintained bench will require the inclusion of access points to all maintained benches as well as a sufficient width (accounting for weathering) for equipment access. Types of benches include overburden benches, geotechnical (lithologic) benches, and construction benches. 1. Overburden Benches The purpose of the soil overburden bench is to create an area where adjustments can be made during construction (due to unexpected variations in the soil-rock interface elevation) without requiring a change to cut slope design angles and limits.

166 Design Practices for Rock Slopes and Rockfall Management GB3: Rock Slope Design January 15, 2016 Page 12 of 18 At the interface between soil overburden and bedrock, a minimum 10-foot wide bench should be provided. Slopes in the soil overburden zone (where the soil is over 10 feet thick) should typically have a slope of 2H:1V. Stability analysis for an overburden zone thicker than 10 feet may be necessary in certain situations to confirm the appropriateness of a 2H:1V slope. If a 2H:1V slope does not daylight over a reasonable distance, steeper slopes may be required to minimize right-of-way and excavation. On occasion, the overburden zone may include or be comprised entirely of severely weathered rock. For the use of overburden zone slopes steeper than 2H:1V, contact the DGE. If the overburden zone is less than 10 feet thick or the natural slope is 1H:1V or steeper, rounding of the top of the cut to blend into the natural slope is permissible. Design of these benches should include an evaluation of drainage, especially in the vicinity of large recharge areas. 2. Geotechnical (Lithologic) Benches A geotechnical (lithologic) bench is a bench placed at the top of a less durable design unit (e.g. shale or claystone) that underlies a more durable design unit (e.g. sandstone or limestone). The purpose of a geotechnical bench is to provide protection against undercutting of the more durable design unit as the less durable design unit weathers and erodes. Benches should be placed at locations where warranted. Guidance on design of geotechnical benches is provided below. a. For incompetent design units 10 feet thick or less, the benches should be 10 feet wide. b. For incompetent design units thicker than 10 feet, the benches should be made wider as necessary based on specific conditions. The designer should use engineering judgment to determine the site-specific minimum thickness of a weatherable bed that will require benching. Conditions to consider are the rate of weathering and the ultimate angle of repose of the weathered incompetent material. For instance, if a material weathers back to 2H: 1V, this should be considered in design to prevent undercutting. c. For interlayered design units, provide a minimum 10-foot bench at the contact between different design units. The designer should use engineering judgment to determine the site-specific bench size required.

Department of Transportation—Provided Documentation 167   GB3: Rock Slope Design January 15, 2016 Page 13 of 18 d. Where permeable formations overlie impermeable ones (including areas of fractured flow), which may indicate potential aquifer zones, the configuration of benches must consider drainage issues. e. For coal, clay, or mineral seams of mineable thickness, or in the case of known or suspected underground mines that will be located within the cut slopes, a 20- foot wide bench should be inserted. Bench locations should be below suspected mine voids and above un-mined seams. f. The slope of benches longitudinally should follow the base of the competent rock with the outslope having positive drainage typically at a grade of 10%, with a minimum grade of 3%. Special consideration should be given to drainage in vicinity of coal seams. Bench grades are extremely hard to control when rock is blasted. g. Where there are competent/incompetent unit interfaces near the termination of the slope at the catchment ditch, a 10-foot wide bench should be inserted below road grade to prevent undercutting of the cut slope during maintenance procedures. h. Where the above guidelines would result in different types of benches in the vicinity of each other (e.g. a construction bench and a geotechnical bench within a few feet vertically), the designer must use engineering judgment to produce a practical design, and combine benches. i. Access roads to benches will most likely require additional right of way. Sufficient width for equipment access on maintained benches will also be necessary. j. Bench widths may need to be modified in order to maintain a temporary working bench during construction. These geometric benches should accommodate relief in the existing slope face. The cut line needs to consider all relief as well as the burden thickness. k. Geotechnical benching must be field adjusted during construction to follow any changes in the bedding surface. l. Install a bench drain along the contact between competent-incompetent rock units where groundwater is encountered or anticipated to collect seeping water, and a backslope drain behind the slope crest to reduce runoff on slope face.

168 Design Practices for Rock Slopes and Rockfall Management GB3: Rock Slope Design January 15, 2016 Page 14 of 18 3. Construction Benches A construction bench is a five (5)-foot bench that is used to accommodate construction practices. For design purposes, where design unit thicknesses or sections of slope designs are greater than 30 feet, blasting must proceed in stages. These benches are provided to account for the required 2-foot offset between lifts during pre-splitting due to constructability issues as well as for the tool variances that occur in drilling (such as tool wander). Without accounting for necessary construction offsets with construction benches, the as-built cut line will either be moved back at the top, impacting project right-of-way, or be made steeper, to maintain the plan offset at the toe of cut. For slopes steeper than 1:1, or where pre-splitting is specified for a 1:1 slope, 5-foot wide horizontal construction benches should be placed at a maximum of 30-foot vertical intervals of a rock cut slope where no geotechnical benches are required. Variations of plan and actual construction bench width are expected and in fact these benches may, and should if possible, be eliminated during construction. E. Rockfall Catchment Design Adequate rockfall catchment must be included in the design of rock cut slopes. The Office of Geotechnical Engineering views catchment ditches as the primary rockfall control method along new slopes. Barriers and other similar controls are viewed as being solutions to rockfall problems on existing slopes. These items should be used in combination or independently only in special circumstances as part of a new slope design (for example to satisfy roadside grading criteria as discussed in the ODOT Location and Design Manual, Vol. 1, Section 307.2.1, to address right-of-way concerns, to address changing slope condition of bedrock quality, or where the cut is very high). OGE has established a rockfall catchment design criteria of 95% rockfall catchment at the edge of pavement or shoulder (where shoulder exists). An effective method of minimizing the hazard of rockfalls is to control the distance and direction in which they travel. The recommended and most frequently used method to control rockfall in Ohio is the appropriate sizing of a catchment area. Other rockfall control and protection methods beyond catchment ditches include barriers, wire mesh fences, and mesh slope drapes (Refer to ODOT Rock Slope Design Guide Section 504 for further information). A common feature of all these protection methods is their energy-absorbing characteristics in which the rockfall is either stopped over some distance, or is deflected away from the roadway. The use of design charts and rockfall computer simulation programs are necessary to select and design effective protection measures against rockfall. If design charts are used as the basis for design of catchment areas, representative critical sections along the rock cut slope should also be analyzed using a rockfall simulation program (Colorado Rockfall Simulation Program [CRSP] or equivalent software) to confirm the

Department of Transportation—Provided Documentation 169   GB3: Rock Slope Design January 15, 2016 Page 15 of 18 catchment ditch configuration is acceptable. The catchment area design should be the larger of the two designs; one based on GB 3 Table 4 and the other being the computer simulation models. GB3 Figures 1 and 2 should be referenced for rock slope terminology. It should be noted that the mid-slope geotechnical (lithologic) bench is not to be designed as a rockfall mitigation measure. However, its ability to attenuate rockfall hazards should not be ignored. The effectiveness or contribution of benches at limiting rockfall hazards should be evaluated using rockfall simulation computer programs. This is accomplished by evaluating both end-of-construction as well as long term conditions. Utilizing a combination of sources, including other state DOT standards, FHWA cosponsored research, and ODOT research, GB3 Table 4 has been formulated for the various recommended cut slope angles (1.5H:1V or steeper). GB3 Table 4 is based on the OGE established 95% rockfall containment within the catchment area. In this table there are two general ditch configuration options presented, and these configurations are shown in GB3 Figures 1 and 2. In the case of rock cut slopes with multiple slope angles (e.g. presence of benches), the governing cut slope angle that will be used to determine adequate catchment should be the angle of the portion of slope that intersects the ditch. Catchment width for an individual rock cut slope section should not vary in width throughout the section and should be based on the critical section of the slope design. The critical section is typically the maximum rock cut slope height. However, instances where larger block sizes are anticipated for section of shorter heights may be the critical section. The height of cut slope (H) should be defined as the vertical distance from overburden bench (or lowest 2H:1V or flatter slope of more than 10 feet in height) to the base of the slope. Modifications to the examples in GB3 Figures 1 and 2 may be made for site- specific hydraulic concerns. The catchment ditch width (W) may include the 10-foot wide maintenance bench discussed in Section D Item 2g, provided it is below the edge of pavement or shoulder (where shoulder exists) elevation.

170 Design Practices for Rock Slopes and Rockfall Management GB3: Rock Slope Design January 15, 2016 Page 16 of 18 GB3 Figure 1. Typical ditch configuration for a catchment area with a single angle foreslope. (Updated 1/16) GB3 Figure 2. Typical ditch configuration for a catchment area with flat catchment area and angled foreslope. (Updated 1/16)

Department of Transportation—Provided Documentation 171   GB3: Rock Slope Design January 15, 2016 Page 17 of 18 GB3 Table 4 - Recommended catchment widths for varying slope and catchment foreslope angles.* Cut Slope Height, H (ft) 0-40 50 60 70 80 >90*** Cut Slope Angle Catchment Ditch Width, W (ft) 3H:1V Catchment Foreslope Angle* 0.25:1 10 15 15 15 20 25 min. 0.5:1 10 15 20 20 20 25 min. 1.0:1 15 20 20 20/25** 25 30 min. 1.5:1 15 20 20 20/25** 25 30 max. 4H:1V Catchment Foreslope Angle* 0.25:1 10/15** 15 20 20 25 30 min. 0.5:1 15 15 20 20 25 30 min. 1.0:1 15/20** 20 20/25** 25/30** 30 35 min. 1.5:1 15/20** 20 20/25** 25/30** 30 35 max. 6H:1V Catchment Foreslope Angle* 0.25:1 15 20 25 30 35 40 min. 0.5:1 20 20 25 30 35 40 min. 1.0:1 25/30** 25/30** 30 35 40 40 min. 1.5:1 25/30** 25/30** 30 35 40 40 max. * For new slopes only, consult ODOT Location and Design Manual, Volume 1, Section 307.2.1 for guidance on catchment foreslope angles. **Option 1 Catchment Ditch Width / Option 2 Catchment Ditch Width *** Slopes with a height (H) greater than 90 feet and at an angle of 1H:1V or steeper should be designed with GB3 Table 4 width as minimum and adjusted according to specific site conditions The designer should use engineering judgment and CRSP or equivalent software analysis to determine the appropriate catchment ditch width for a rock cut slope where the portion of the slope intersecting the ditch is flatter than 1.5H:1V. Further guidance on CRSP can be found in Section 503.1 of the ODOT Rock Slope Design Guide.

172 Design Practices for Rock Slopes and Rockfall Management GB3: Rock Slope Design January 15, 2016 Page 18 of 18 F. Other Geotechnical Considerations Refer to Section 600 of the ODOT Rock Slope Design Guide for the following topics: • Mines and Mine Seals • Groundwater • Surface Water • Transitions • Karst Refer to Section 700 of the ODOT Rock Slope Design Guide for discussion on construction considerations. G. Plan Requirements and Deliverables 1. Overburden, geotechnical (stratigraphic), and construction benches must be shown on the cross-sections. The intent of a particular bench should be denoted on the cross-sections. A plan note or typical section is not acceptable except to further define the various benches. 2. Rockfall catchment software analysis output as well as input parameters should be presented as part of the geotechnical report. 3. Cost analysis comparing potential catchment configuration must be presented with catchment recommendations in the geotechnical report. 4. Present any testing results for bedrock samples as per the ODOT SGE Section 700. H. References Refer to Section 800 of the ODOT Rock Slope Design Guide.

Department of Transportation—Provided Documentation 173   Design Manual M 22-01 Geometric Cross Section November 2006 Page 640-17 Rock Slope H (ft) W (ft) Near Vertical 20-30 12 30 – 60 15 > 60 20 0.25H:1V through 0.50H:1V 20-30 12 30-60 15 60-100 20 >100 25 Notes: Cut heights less than 20 feet shall be treated as a normal roadway, unless otherwise determined by the region’s Materials Engineer. Stage 2 and 3 Alternates may be used when site conditions dictate. Fence may be used in conjunction with the Stage 3 Alternate. (See Chapter 700 for clear zone requirements.) (1) For required widening for guardrail and concrete barrier, see Chapter 710. Roadway Sections in Rock Cuts, Design A Figure 640-7a Washington DOT

174 Design Practices for Rock Slopes and Rockfall Management Utah DOT

Abbreviations and acronyms used without de nitions in TRB publications: A4A Airlines for America AAAE American Association of Airport Executives AASHO American Association of State Highway Officials AASHTO American Association of State Highway and Transportation Officials ACI–NA Airports Council International–North America ACRP Airport Cooperative Research Program ADA Americans with Disabilities Act APTA American Public Transportation Association ASCE American Society of Civil Engineers ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials ATA American Trucking Associations CTAA Community Transportation Association of America CTBSSP Commercial Truck and Bus Safety Synthesis Program DHS Department of Homeland Security DOE Department of Energy EPA Environmental Protection Agency FAA Federal Aviation Administration FAST Fixing America’s Surface Transportation Act (2015) FHWA Federal Highway Administration FMCSA Federal Motor Carrier Safety Administration FRA Federal Railroad Administration FTA Federal Transit Administration GHSA Governors Highway Safety Association HMCRP Hazardous Materials Cooperative Research Program IEEE Institute of Electrical and Electronics Engineers ISTEA Intermodal Surface Transportation Efficiency Act of 1991 ITE Institute of Transportation Engineers MAP-21 Moving Ahead for Progress in the 21st Century Act (2012) NASA National Aeronautics and Space Administration NASAO National Association of State Aviation Officials NCFRP National Cooperative Freight Research Program NCHRP National Cooperative Highway Research Program NHTSA National Highway Traffic Safety Administration NTSB National Transportation Safety Board PHMSA Pipeline and Hazardous Materials Safety Administration RITA Research and Innovative Technology Administration SAE Society of Automotive Engineers SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (2005) TCRP Transit Cooperative Research Program TDC Transit Development Corporation TEA-21 Transportation Equity Act for the 21st Century (1998) TRB Transportation Research Board TSA Transportation Security Administration U.S. DOT United States Department of Transportation

Transportation Research Board 500 Fifth Street, NW Washington, DC 20001 ADDRESS SERVICE REQUESTED ISBN 978-0-309-68707-2 9 7 8 0 3 0 9 6 8 7 0 7 2 9 0 0 0 0

Design Practices for Rock Slopes and Rockfall Management Get This Book
×
 Design Practices for Rock Slopes and Rockfall Management
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

While there are no national standards for rock slope design and rockfall management, many state departments of transportation (DOTs) have developed their own design goals and objectives.

The TRB National Cooperative Highway Research Program's NCHRP Synthesis 588: Design Practices for Rock Slopes and Rockfall Management documents DOT practices for the design of rock slopes and rockfall mitigation systems.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!