National Academies Press: OpenBook

Smoothness Specifications for Pavements: Final Report (1997)

Chapter: Chapter 2. Agency Survey Results

« Previous: Chapter 1. Introduction
Page 7
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 7
Page 8
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 8
Page 9
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 9
Page 10
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 10
Page 11
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 11
Page 12
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 12
Page 13
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 13
Page 14
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 14
Page 15
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 15
Page 16
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 16
Page 17
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 17
Page 18
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 18
Page 19
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 19
Page 20
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 20
Page 21
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 21
Page 22
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 22
Page 23
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 23
Page 24
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 24
Page 25
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 25
Page 26
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 26
Page 27
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 27
Page 28
Suggested Citation:"Chapter 2. Agency Survey Results." Transportation Research Board. 1997. Smoothness Specifications for Pavements: Final Report. Washington, DC: The National Academies Press. doi: 10.17226/6337.
×
Page 28

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

CHAPTER 2. AGENCY SURVEY RESULTS Introduction To document the current State specifications and procedures for measuring initial pavement smoothness, and to record both States' and paving contractors' opinions concerning crucial smoothness specifications and smoothness measuring equipment, two separate questionnaires on these subjects were developed and targeted for the following organizations: . 50 SHAs. 3 Federal Thanks agencies IS asphalt paving contractors. iS concrete paving contractors. The first questionnaire, developed specifically for the SHAs, was sent to all 50 States and the three Federal Lands agencies In March, 1994. This survey included several of the topics contained In the 1987 AASHTO and 1992 NCHRP 20-7 (Scofield 1992) State surveys, such as bump and ride quality specifications used, smoothness measuring equipment and procedures used, and specification and equipment assessments. Additional questions were Included that pertain to each agency's past and planned future changes in specifications, equipment, and procedures, as well as each agency's ability to provide roughness data for the NCHRP I-31 project. Research team members preceded questionnaire distribution win a telephone call so Cat He appropriate individuals within each agency could be identified. Responses to the State survey were typically returned within 2 to 3 weeks. Complete survey responses were receiver] from 45 States and all 3 Federal Lands agencies. For the paving contractor survey, approved contact lists of both asphalt and concrete paving contractors were generated via discussions with the National Asphalt Pavement Association (NAPA) and the American Concrete Paving Association (ACPA), respectively. From these lists, IS asphalt paving contractors and 18 concrete paving contractors located throughout the country were identified for participation in the June, 1994 survey. As with the State survey, research team members preceded the contractor questionnaire with a telephone call so Cat the appropriate individuals within each company couict be identified. Because of the busy construction season, not all of He 36 contractors could be contacted. As a result, only 33 questionnaires were sent out. A total of 16 contractors furnished responses to He questionnaires; 6 asphalt paving contractors, 9 concrete paving contractors, and 1 contractor involved with both asphalt and concrete paving. 7

Summary of State Survey Responses The following sections present the results of State's responses to selected questions contained In the survey. Each section pertains to the subject areas covered sequentially in the questionnaire. Detailed responses for most of the questions not discussed in this chapter are provided in tabular form in appendix A. Pavement Smoothness Specifications Currendy, most every SHA uses some form of an initial smoothness specification. Depending largely on the pavement type, some agencies employ a bump, or surface tolerance, specification only, whereas several more use a ride qualibr specification supplemented by a bump specification. . . ~ , 1, A summary of the use of smoothness specifications for new construction and AC overlay projects is illustrated in figure T. As seen in this figure, 28 of the 50 responding agencies indicated using a ride . .. . 0 , 1 0 0 0 speclucatlon (tested using a profiling device) on newly constructed AC pavements. Nineteen additional agencies indicated using straightedges or stringlines to ensure adherence to bump specifications on new AC pavements. For AC overlays, the number of agencies using a ride quality specification dropped slightly to 19 for AC overlays on PCC, and to 26 for AC overlays on AC. An additional 20 agencies indicated using straightedges or str~nglines as part of a bump specification for both pavement types. 50 40 cn ._ ~ 30 ~4 ¢ o ~ 20 z 10 O 40 Ride specification (with or without bump specification) Bump specification only _._._._ 28._._ - - ~ - - ~ - - ~. - ~ - .~. - ~ - ~ - ~ - ~ - 19 ...... .. . . . ............ . . . New AC ~_ ~_ _ _ _ , _ , _ r l New PCC l .............. . . . ............ . . . . ............ . . . ............... . . . ....... ... . . . . ............ . . . ............... . . . ..... 26 20 19 20 AC/AC AC/PCC Figure 1. Sununary of use of smoothness specifications for various pavement types. 8

Most highway agencies have a smoothness specification for new PCC and for PCC overlay pavements. Forty of the 50 respondents indicated using profiling devices to ensure PCC ride quality requirements. Five other respondents indicated using straightedges or stringlines as part of a bump specification. The remaining 5 agencies did not indicate the use of PCC smoothness specifications largely, it is believed, because they do not construct PCC pavements. In conjunction with the smoothness specifications, many highway agencies use incentive/disincentive payment schedules. Of the 50 responding agencies, 21 and 29 indicated the use of incentive and/or disincentive pay factors on new AC and new PCC construction, respectively. The vast majority of the incentive/disincentive pay schedules were noted as being step-function pay schedules, with a certain percentage paid for a specified range of smoothness. Figures 2 Trough 4 provide a general indication of the initial smoothness standards set by the States and Federal Lands agencies. In these figures, histograms of the critical limits for corrective action (e.g., grinding, overlay, remove/replace), Incentive payments, and disincentive payments, respectively, are illustrated for both new AC and new PCC pavements. The limits are expressed in terms of profile index 11 10 9 8 ~n ~7 ¢ 6 a E 4 it, := ~NewAC · New PCC - Notes KS (30 in/ml on~AC and~PCC)~uses~ ........... . . . . . .~e.x ~bl~ing L.an. ~. . . . . . . . . . 1 O 1 3 s 7 9 ... ~... 1 1 1 ~ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ~.................. ~..... .. 1 1 1 1 1 1 1 13 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 13 15 17 19 21 23 2s 27 29 31 33 Profilograph Corrective-Action Critical Limits, in/ml 35 37 Figure 2. Maximum roughness levels prior to requiring corrective action. 9

8 ~ ~NewAC - 1 co ! .O 1 u 0£ ¢ o ~ 3 z 4 O 4 5 6 7 8 Notes IL (0.5 in/ml over entire project) counted . ............. . . Y - . . _ . . . . . . . . . . . as 1 1n/m1tor A _. IL (4.25 in/ml over entire project) counted . as ~.~Imi fQr P~C.~ KS (10 in/ml on AC and 15 in/ml on PCC) uses zero blanking band. . , ~,.,, , ,,,.,,.,, ,,.,.,., ,., ,, .,, ,.,,.,,.,, ,,.,,.! i, 9 10 11 12 13 14 15 16 Critical Limit for Profilograph-Based Incentives, in/ml Figure 3. Minimum roughness levels prior to incurring incentive payments 10 9 8 7 ~ CO ._ ~ 6 q) so o z 4 1 o _ ~NewAC · New PCC Notes KS ~40j~mi on AC and 50 in/ml ~ P~C~Q uses zero blanking band. ~. . 1 7 9 1 1 13 15 37 39 41 43 45 47 49 51 Critical Limit for Profilograph-Based Disincentives, in/ml Figure 4. Maximum roughness levels prior to incurring disincentive payments. 10 -

(Pl) values (as measured by a profilograph, since this was the most common device), and they denote the m~nimurn (incentive) or maximum (corrective action and disincentives roughness levels prior to incurring the specified consequence. As seen in figure 2, most of the corrective action requirements fall between 7 and 15 in/ml (0.~1 and 0.24 m/km). Moreover, the limits for new AC pavements appear to be slightly lower, or more restrictive. Critical incentive Innits for bow new AC and PCC pavements generally range between 3 and 7 ~n/mi (0.05 and 0.~1 m/km), as shown in figure 3. Again, however, the critical limits are slightly more restrictive for AC pavements than for PCC pavements. For disincentive criteria, [units of 7 and 10 ~n/mi (0.11 and 0.16 m/km) are common, with slightly more leniency given to new PCC pavements (figure 41. Nearly all profilograph-based bump specifications are based on a 25-ft (7.5-m) base length. Of the 39 agencies that indicated the use of a bump specification, 36 use a 25-ft (7.5-m) base length. Nearly two-thirds of the 36 agencies require Mat bumps greater Man 0.3 in (7.6 mm) be ground (see figure 5), while another 31 percent specify grinding of bumps greater than 0.4 in (10.2 mm). Various pieces of equipment are used to enforce Me existing highway agency smoothness specifications. The pie charts in figures 6 and 7 illustrate the breakdowns in equipment type used for measuring initial smoothness of asphalt surfaced pavements and concrete pavements, respectively. It should be noted that these distributions include all of the types of equipment specified by each agency, be they two or more profiling devices or a profiling device supplemented by a straightedge 0.5= 6% 0.4 31% Note: Corresponding to 25-ft Base 0.3 in 63% Figure 5. Breakdown of bump size criteria for 25-ft (7.5-m) profilograph base lengths. 11

R It Stringline Equipment Legend KJ Law 690 DNC - Noncontact Inertial Profilometer LISA - Lightweight Noncontact Inertial Profilometer California - Califorrua Profilograph Ames - Ames Profilograph Rainhart- Rainhart Profilograph Mays (vehicle) - Mays Meter installed in vehicle Mays (trailer) - Mays Meter mounted on trailer Law 690 DNC 3% LISA 1% Mays (vehicle) (trailer) 3% 7% California sO/^ ''Ames ' 12% Figure 6. Breakdown of roughness measuring equipment used on new AC and AC overlay pavements. KJ Law 690 DNC Rolling 3% LISA Straightedge 1% . a, Equipment Legend KJ Law 690 DNC - Noncontact Inertial Profilometer LISA - Lightweight Noncontact Inertial Profilometer California - California Profilograph Ames - Ames Profilograph Rainhart- Rainhart Profilograph Mays (vehicle) - Mays Meter installed in vehicle Straightedge Mays (vehicle) \ 1% \, Rainhart 10% Ames 10% Figure 7. Breakdown of roughness measuring equipment used on new PCC and PCC overlay pavements. 12 California 44%

(e.g., Iowa specifications allow the California and Ames profilographs for testing profile, and a straightedge for testing surface tolerances In excluded areas). Hence, for each pavement type, the total number of measuring devices far exceeded 50, reaching to between 70 and 75. As seen In figure 6, the devices of choice for new AC and AC overlays are the straightedge and the California profilograph. Approximately 30 agencies use a straightedge and approximately 20 agencies use a California profilograph in their evaluation of initial smoothness. Moreover, 9 and 7 agencies were noted as using the Ames profiIograph and the Mays Meter, respectively, on asphalt surfaced pavements. A considerable difference In the equipment breakdown occurs when the subject pavement type is new PCC (figure 71. Here, the preferred device is the California profilograph, which is used by 33 of the 50 respondents. The straightedge is next commonly used (23 agencies), followed by the Ames and Rainhart profilographs (7 agencies each). Unlike on AC pavements, the Mays Meter is rarely used on PCC. As seen In table I, SHAs base the selection of smoothness specifications and ~ncentive/disincentive payment schedules on various items. For each of Tree main pavement types, at least one-third of the agencies Indicated basing their specifications and payment schedules on methocis other than research, engineering judgment, and AASHTO or other specifications. Moreover, SHAs are more likely to base their specifications and payment schedules on their own knowledge or study findings rather than external sources. Another basis for ~ncentive/disincentive payments for overlays (although not shown In table 1) is the percent unprovement made to smoothness. Table 1 also shows that the majority of SHAs base ~ncentive/dis~ncentive payments on a portion of the unit bid, rawer than a fixed amount or other methods. About one-half of the responding agencies base such payments for new AC on a portion of He unit bid. This percentage is considerably higher (69 percent) for new · · ~ ~. ~ 1 ~ PCC or PCC overlays, primarily because I've pavements more commonly nave an incentive clause. Finally, the need for separate smoothness specifications for specific pavement types was generally disavowed by SHAs (figure 8~. At least 50 percent of the respondents did not feel the need for separate specifications for 9 of the 10 pavement types listed. The exception to this finding was surface-ground PCC, which was evenly split between the Tree possible responses. Among those pavement types for which the majority of agencies indicated no need for a separate specification, the highest percentages occurred with new AC pavements and raew PCC pavements. 13

Table 1. Distribution of SHA responses to various smoothness specification questions. | | New PCC or | Response I New AC I PCC Overlay I . Basis for selection of specified smoothness limits Research and analysis l 10 1 . Engineering judgment 9 Other agency specifications 4 4 AASHTO guide specification 3 5 Other 18 20 Total number of agencies responding 43 Basis on which incentive/disincentive payment amounts are determined Fixed amount, $/yd2 1 7 | 7 Portion of the unit bid | 14 | 24 Other _ l 5 | 4 Total number of agencies responding 26 35 Basis for selection of relationship between incentive/disincentive payment and smoothness Engineering judgment 4 AASHTO guide specification 1 3 Other agency specifications 3 4 ~ Research and analysis 6 3 . Other 10 15 Total number of agencies responding l 24 ~32 AC Overlay 9 10 3 2 18 42 6 13 6 25 5 lo 1 2 5 10 22 1 yd2 = 0.84 m2 14

100°/o 80% u, u' o u, c, ~40O/O CJ 60% 20% 0% _ . <, ~ ~ ~ ¢ , ~ 3 ¢ u ~ 2 v, ~ O Unknown ·No 111 Yes Figure 8. Breakdown of responses concerning the need for separate specifications. Specified Field Procedures For each of the three main pavement types, smoothness progress testing is largely performed by the paving contractor. As seen in table 2, roughly two-thirds of the responding agencies indicated that this responsibility falls upon the contractor for each pavement type. SHAs perform about 20 to 25 percent of this work, with the remainder involving joint State/contractor testing. In contrast less than 20 percent of the responding agencies indicated allowing contractors alone to perform smoothness acceptance testing. is performed by the highway agency, regardless of pavement type. The bulk of this testing The vast majority of SHAs test the entire length of paving for roughness, rather than evaluate random samples. As evident in table 2, 76 and 86 percent of the agencies test the entire length of AC and PCC constn~ction sections, respectively. Similar percentages reflect the number of States that evaluate initial roughness along O.~-mi (0.16-km) Intervals. Most others evaluate along 1-ml (~.61-m) intervals for AC pavements and various specified lengths below 0.25 mi (0.40 km) for PCC pavements. 15

Table 2. Distribution of SHA responses to various roughness measuring procedures questions. ~ New PCC or j l Response | New AC | PCC Overlay I AC Overlay I Party responsible for smoothness progress testing | Contractor | 28 | 32 l State 12 10 Over l Totalnumber of agencies responding 1 43 1 46 l Party responsible for smoothness acceptance testing Contractor | 5 | 9 l State 28 Other 7 Total number of agencies responding 1 44 | 44 l Extent of smoothness measurement sampling Entire paving leng*l 29 38 Random samples Total number of agencies responding | 38 | 44 l Unit length of paving section individually evaluated for smoothness 528 it (0.1 mi) ~23 1 36 ,056 it (0~2 mi) ~1 1 O _ _ _ Other 8 Total number of agencies responding 31 44 Time after construction in which acceptance testing is performed _ -- . . Within 24 has 1 11 1 8 _ _ _ ~1 Within 48 hours 1 0 1 6 Within 72 hours | 4 | 3 _ , , No time requirement/test as soon as possible. 1 10 l Other | 9 | 11 ~ -- - I 1 Total number of agencies responding | 34 1 42 1 ~ 29 0 4 43 6 30 6 42 29 9 38 2 1 9 31 11 1 4 9 9 ~4 16

Between 40 and 47 percent of the responding States Indicated that initial roughness testing is done within 72 hours of new construction (table 2~. Moreover, between 26 and 33 percent of the respondents indicated having no specific time requirement, or that testing is performed as soon as possible. With regard to the use of computerized profiling devices, SHAs are laraeiv split Data Reduction Procedures ~ , ~ between using Butterworth (third-order) and Cox (first-order) filters and settings (figure 9~. Almost two-thirds of the responding agencies use one of these filtering methods, with the remaining methods consisting of Chebyshev (third-order), moving average, recursive (second-order), and combined Cox and moving average filters. . . ~ Overwhelmingly, States using a profiIograph in their roughness testing place a 0.2-in (5.~-mrn) blanking band for evaluation of profiIograph traces. Table 3 shows that, for each of the three main pavement types, approximately 86 percent of the respondents indicate use of this blanking band limit. Table 3 also shows that a variety of methods are used to position the blanking band for profile trace evaluation. Visual judgment is the most common method, followed by the computer-selected, best-fit procedure and aligrunent with previous section. A few agencies combine visual judgment and computerized best-fit. Cox, 1st Order 32% Chebyshev, 3rd Moving Average Order 5°/O Other a/ 29% 5,0 Butterworth, 3rd Order 29% Figure 9. Breakdown of filter and setting types used with computerized profiling devices. 17

Table 3. Distribution of SHA responses to various data-reduction procedures questions. New PCC or l Response | New AC | PCC Overlay | Blanking band ~ 0.1~n -3 0.2 In 19 32 Other 1 2 1 2 Total number of agencies responding ~A) ~37 Method used for positioning the blanking band Aligr~nent with previous section ~5 Visual judgment ~16 : Computer-selected best-fit ~9 Over ~ : Total number of agencies responding ~3 8 : Accuracy to which scaZIops on profiZograph traces are rounded 0.01 in ~3 : ~0.05 in ~29 : _ _ _ Over 1 3 ~ _ _ Total number of agencies responding 1 35 all 1 In = 25.4 Am 1 8 2 2 Finally, the accuracy to which scallops on profilograph traces are rounded by States is most often 0.05 In (~.3 mm). Approximately 82 percent of responding States noted using this accuracy level, followed by 9 percent using 0.01 in (0.25 mm). In addition, one State indicated using bow 0.05 in and 0.01 in (~.3 and 0.25 mm) levels, whereas another uses 0.03 In (0.76 mm) exclusively. Satisfaction With Current Specifications When questioned about the adequacy of their current smoothness specifications, most States felt Weir specifications were either adequate or in need of slight unprovement. Of 45 responding agencies, 24 indicated Weir current specifications were adequate, 16 indicated slight improvements should be made, and 5 indicated their specifications should be replaced. 18

Regarding the adequacy of their initial roughness measuring equipment, most States are moderately satisfied to moderately dissatisfied. Figures 10 through 14 illustrate the basic statistical results of States' ratings of five equipment types. For each type, I) different properties were rated on a scale of one (completely satisfactory) to five (completely unsatisfactory). Since the equipment was subjectively evaluated and since highway agencies predominantly use the California profilograph, a comparison of property ratings between pieces of equipment is believed to be inappropriate. More appropriate, however, is the following discussion on the perceived merits and drawbacks of each equipment type. As seen in figure 10, the most apparent drawback of the California profilograph is its ability to be correlated with other devices. There also appears to be problems In correlating the Rainhart profilograph with other devices. In fact, not only is the Rainhart profilograph perceived to be unsatisfactory at correlating with other devices, but its data collection rate and data reduction effort are largely judged unsatisfactory, much like the Ames profilograph. 4 2 1 ~ Avg l _ ............ ~Avg+StdDev ..-..~.. U ~, ~ ~ c U ~ ~o ~ Figure 10. Statistical results of California profilograph ratings (1 = satisfactory, 5 = unsatisfactory). 19

5 l 3.5 ~ · Avg - Std Dev 4.5 , - ~ Avg . ~ 4 ~ - ~ Avg + Std Dev ~| 3 ~4 ~ 2.5 Do; 2 1.5 1 0.5 5 4.5 4 3.5 3 ~o 2.5 2 1.5 1 0.5 L . ~. ... ,.............................................. .. .............................. ............. .......... .. ............... .............................. l . . . ............ . . . ............... . . . ............ . . . . ............ . . . ............... . . . ............ . . . . ............ . . _ f _ _ ~ f A .......... _._._4 i . ._ `, ~ ~ 0 5 ~ ' - ~e D E _ a i' u ~ ~ J 2 ~v Figure 11. Statistical results of Rainhart profilograph ratings (! = satisfactory, 5 = unsatisfactory). . · Avg - Std Dev . _ ~_.~ a Avg ... . _ _ .... Q Avg + Std Dev _ ................................ .............. _ ` L . _ _ ~ .~ . _ _ .. ............................... ~ I _ ; ' ; j jj . ................... ................. . . . . .] ................. ............... [ ~ ............... O ~1 1 1 1 1 1 1 1 1 1 =^ ~-3 ~-~ ~ED ~U EN x Figure 12. Statistical results of Ames profilograph ratings (] = satisfactory, 5 = unsatisfactory). 20

5 i r · Avg - Std Dev 4.5--- ~ Avg ...................................................... 4 F - ~ Avg + S td Dev L. _._ ........... _._._._ ... _.___._._ _._._._ _._._._ ._. _ . - - - - -- - - - t -- - - - -i - -- - -. - . - . ~- . - . - . - - . - . - . ~- . - . - . - . - ~. - . - O. 1 O ........... ..... 4 F . . ... ] ........... _._._._ __._._._ _._._._ _._._._. 1 1 1 1 1 1 1 1 1 ~ ~ =5 ~ ~S - - ~E ~u 0 ~n O ~U Q ._ u, s x Figure 13. Statistical results of Mays Meter ratings (1 = satisfactory, 5 = unsatisfactory). 4.5~- 4 3.5 3 ~o ·fi 2.5 2 1.5 1 0.5 O o ._ ~ 0 . .. · Avg - Std Dev .~. JAvg ................................................ 1 - . _ ~; o s tJ ._ a' ._ 1 1-- - --.-.- -. .............. ............... ' ............... ~, ~ T ~ , I .......... . . . . .......... . . . . ..~ .................................... .. ............ . . . . . . ................................ . ................................ , . .~.......... .- _ E y U, u -_ E ~-D j C C _ E - ' . ~v u ~3 ~ a ' Figure 14. Statistical results of inertial profiler ratings (1 = satisfactory, 5 = unsatisfactory). 21

The Mays Meter is generally perceived to be unsatisfactory at correlating with both different devices and similar models (e.g., trailer-mounted versus vehicle- mounted). In addition, there is a fair level of dissatisfaction with respect to repeatability and its ability to identify "must grind" locations. Finally, as seen In figure 14, the major perceived drawback of the inertial profiler is overall cost (initial and maintenances. In general, the initial cost of this type of equipment is between 10 and 15 times the initial cost of profilographs. Other areas of dissatisfaction largely noted by the SHAs include durability, set-up effort, and the level of expertise required. Effects of Specifications Many responses were provided to various questions regarding the effects of smoothness specifications and ~ncentive/disincentive payments. As seen in table 4, roughly half of the responding States have either records that show or simply believe that increased smoothness results from their smoothness specifications. Furthermore, although the proof is generally not available, nearly half of the SHAs indicated that their initial smoothness specification positively impacts material/construction quality. Interestingly, the majority of highway agencies having incentives/disincentives for smoothness indicated they have records that show significantly smoother pavements as a result of specifying incentive/dis~ncentive provisions. The net cost to the States making such payments is generally not clear at this time; however, a number of agencies did indicate increased payments associated with PCC construction. Pavement Roughness Data As a means of sensing the availability of both initial and extended pavement roughness data, a series of questions were included In the survey regarding States retention of, and ability to provide, these types of data. As seen In table 5, a fair number of States indicated possessing iriitial and/or extended roughness records. Most of these States also expressed their ability to provide these records, as illustrated in figure 15. Summary of Contractor Survey Responses As discussed previously, a total of 16 contractors, representing all of the regions In the continental United States, furnished responses to He contractor survey. One of the contractors completed 2 survey forms so as to Individually reflect both their asphalt and concrete paving experiences. The following sections provide a general overview of the results of contractor's responses to selected questions. 22

Table 4. Distribution of SHA responses to various questions on the impact of smoothness specifications. New PCC or Response ~New AC | PCC Overlay I AC Overlay : result of current smoothness specification on initial pavement smoothness Records show noticeable smoothness increase 8 17 7 || 'erceived smoothnessincrease 1 13 | 13 | 133 l I Joincreased smoothness 1 8 1 7 T 7g l I Jot sure,too early to tell 1 6 1 3 T 5g l I Jo specification now 1 6 1 1 T 8g l I rotalnumberof agencies responding 1 41 1 41 T 40j || result of current smoothness specification on material/construction quality control j1 l | records show better quality | 2 | 4 T 11 Perceived quality increase | 16 | 20 | 15 11 l Jo increased quality ~8 1 6 T 7 11 l Cot sure; too early to tell 1 6 1 7 T 5 ill l Jo specification currently | 7 | 2 | 9 g l Cotalnumber of agencies responding | 39 | 39 | 38 al I | (esuIt of incentives/disincentives on initial pavement smoothness 21 l records show significantly smoother | 12 | 19 | 11 1 pavements _ _ do difference in pavement smoothness T 2 1 2 1 0 All i | dot sure; too early to tell | 9 | 11 | 8 : Jo incentives/disincentives in specification ~9 ~5 ~12 . ~ 'otal number of agencies responding ~32 ~37 ~31 i | (esuit of incentives/disincentives on overall cost to S tale j1 ;igruficantly higher overall payments T 2 ~6 ~2 || I iignificantlyloweroverallpayments T 2 1 1 ~1 11 I dot sure;too early to tell T 17 ~23 ~16 11 . I doincentives/disincentivesin specification T 8 1 4 T 12 11 | 'otal number of agencies responding T 29 | 34 T 31 11 23

Table 5. Distribution of SHA responses to various questions on availability of roughness data. | Response | New AC | New PCC/PCC Overlay | AC Overlay || Retention of initial pavement roughness data Pavements 1 to 3 years old 1 13 1 10 l Pavements 4 to 9 years old 8 14 Pavements more Man 9 years old | 6 | 9 l _ Total number of agencies responding 27 33 Retention of extended pavement roughness data Pavements 1 to 3 years old 4 2 Pavements 4 to 9 years old 9 9 . Pavements more Wan 9 years old 9 Total number of agencies responding 21 20 0 7 l 7 24 3 0 8 2 30, cn ~ 25 20 ._ 1 o co ~ 10 o 0 5 Ad o @' Initial Roughness Extended Roughness 14 8 25 20 1 to 3 years old 4 to 9 years old >= 9 years old All ages Pavement Age Category Figure 15. Ability of SHA's to provide roughness data for evaluation. 24

Equipment A majority of the contractors ~nclicated using the California profilograph In their paving work, occasionally in conjunction with other devices. Of the 7 asphalt paving respondents, 6 noted using the California profiIograph and 2 noted using the Ames profilograph. Of the 10 concrete paving respondents, ~ noted using the California profilograph, 3 noted using the Mays Meter, and 2 noted using the Ames profilograph. Straightedges were quite common among both types of paving contractors. Although most contractors Indicated using only ~ device (often because of State requirements), 4 contractors who noted the use of multiple devices had the following preferences and corresponding reasons: . · California profilograph over the Ames profilograph case of data reduction. Rainhart profilograph over the Mays Meter-repeatability and more realistic profile. · Ames profilograph over the California profilograph mobility and ease of operation. · California profilograph over the Mays Meter repeatability and quick, hard- copy answers. Equipment property ratings were very similar to those provided by the States. For all of the devices (California profilograph, Ames profilograph, Rainhart profilograph, and Mays Meter) rated by the contractors, each had mean property ratings equal to or slightly below the mean State ratings shown in figures 10 through 13. The main drawbacks of these devices as revealed by Me contractors ratings are as follows: · California profilograph - correlation with different devices. · Ames profilograph - data reduction effort. identifying must-gr~nd locations. · Rainhart profilograph data collection rate. data reduction effort. · Mays Meter equipment repeatability. correlation with same models. identifying must-grind locations. Roughness Measuring Procedures According to the contractors' responses, the contractor is generally responsible for providing both Me progress and acceptance testing equipment on paving projects. 25

Moreover, as shown In table 6, contractors are also largely Involved In the actual roughness measuring and analyses. All 16 contractors (including the asphalt/concrete contractor) preferred handling the pavement roughness testing and analysis. ~ ~ ~ =-~ - O , the two foremost reasons were the contractor's ability to get immediate results and correct the pavement as necessary and the ability to control the operation, thereby aiding the scheduling process. Current Smoothness Specifications On the question of whether smoothness specifications are uniformly applied by State highway and other agencies, contractors were largely split. Four contractors responded "yes," 4 responded "no," and 8 responded "reasonably so." In addition, when asked whether serious attempts should be made to standardize specifications equipment, and procedures, 14 of the 16 contractors indicated "yes." The primary ~ ~ - , ~ - - - , reason given was that standardized specifications and equipment will assist contractors In obtaining consistent results. The 2 contractors opposed to standardization believed it would either be a waste of time and money or that specifications must be free to change with changing expectations and equipment capabilities. Although most contractors (15 out of 161 did not believe the emphasis on smoothness is costly, contractors were evenly split on whether current specifications and test procedures are adequately clear and concise (9 agreed, 7 disagreed). Moreover, each of the 16 responding contractors agreed that obtaining smoother pavements requires attention to other aspects of production, hereby improving the overall quality of the highway. Table 6. Distribution of contractor responses to various roughness measuring procedures questions. | Number of Responses (out of 17 total) | Question | Progress Testing I _ I Party responsible for operating the smoothness testing equipment Contractor 17 State Agency Bo~ Party responsible for doing the necessary analysis and calculations of test results Contractor ~ 1 State Agency ~ 30~ ~ 2 . . ~ Acceptance Testing 7 6 2 26

With respect to ~ncentive/dis~ncentive clauses, most contractors (14 out of 16) favored these over a fixed-bid system. The main advantages and disadvantages given by the contractors Included the following: Advantages · Competitive advantage for higher quality contractors. · Promotes quality workmanship. An incentive to try new technologies and to upgrade QC programs. Levels the playing field those contractors that care about quality can potentially regain their extra costs. The highway agency and, hence the taxpayer, benefit from cheaper bid prices because good contractors will take advantage in the bidding process and submit a cheaper price. . Disadvantages · Disincentives are not properly balanced win incentives or with the decrease In pavement performance. · Specification is worthless on projects designed with characteristics restricting the ability of the contractor to achieve the specified smoothness. · Unbalanced bids. · Highway agency must include Me incentive in the estimated cost of the project. This can cause problems when funds are Ignited. When asked if anticipated incentive/disincentive payments influence project bid prices, Il of the 16 responding contractors indicated they do. The general response of these contractors was Mat Hey either reduce He bid by the amount of incentive expected or increase He bid by the amount of disincentive expected. In either case, the contractor must assess the characteristics of each project and have a good understanding of his capability for achieving specified levels of smoothness. Among some of the general improvements suggested by contractors in the area of specifications, equipment, and testing were the following: Standardization in specifications and test procedures. Better communication and harmony between the highway agency and the contractor. Clarification regarding when incentive/disincentive adjustments apply. Universal acceptance of computer reduction of profiIograph traces, thereby eluninating the judgment of Individuals. Additional training of individuals performing the roughness tests and analyses. To improve pavement smoothness, the responding contractors noted making several operational changes In the last 5 years. Most of these changes were made In the areas of paving equipment and procedures, subgrade quality control, paving mixture quality control, and roughness measuring procedures. Specific changes included buying new pavers or paver attaclunents (e.g. longer skis, material transfer devices), maintairung more continuous paving operations, promoting better subgrade 27

designs and/or preparations, and performing more intensive smoothness progress measuring. Suggested future changes to improve initial smoothness included new paving equipment, training, and the use of material transfer devices. Summary This chapter has presented a brief discussion of the results from a questionnaire survey on current roughness-measur~ng practices. Surveys were conducted of both SHAs and major highway paving contractors in March and June, 1994, respectively. These questionnaire results are a valuable indication of the current practices In pavement roughness measurement and interpretation. The complete responses are sumrnarwed In appendix A. 28

Next: Chapter 3. Data Base Development »
Smoothness Specifications for Pavements: Final Report Get This Book
×
 Smoothness Specifications for Pavements: Final Report
MyNAP members save 10% online.
Login or Register to save!

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!