Skip to main content

Search results for "cure time"

Viewing 21 - 40 of 252 results by relevance

Optimization of Tack Coat for HMA Placement  (2012)

Guidelines for the Preservation of High-Traffic-Volume Roadways  (2011)

Material Properties of Cold In-Place Recycled and Full-Depth Reclamation Asphalt Concrete  (2017)

Construction Guidelines for Cold Central Plant Recycling and Cold In-Place Recycling  (2023)

Spot Painting to Extend Highway Bridge Coating Life: Volume 1: Guidance  (2018)

Portland Cement Concrete Pavement Joint Sealant Practices and Performance  (2021)

Developing a Systematic Approach for Determining Construction Contract Time  (2022)

Spot Painting to Extend Highway Bridge Coating Life: Volume 2: Research Overview  (2018)

Pavement Patching Practices  (2014)

Evaluation of Ultra-High Performance Concrete Connections  (2022)

Common Airport Pavement Maintenance Practices  (2011)

Recycled Materials and Byproducts in Highway Applications—Slag Byproducts, Volume 5  (2013)

Prefabricated Bridge Elements and Systems to Limit Traffic Disruption During Construction  (2003)

Innovative Bridge Designs for Rapid Renewal  (2014)

Preservation Approaches for High-Traffic-Volume Roadways  (2011)

Validation of the Louisiana Interlayer Shear Strength Test for Tack Coat  (2018)

Guide to Using Existing Pavement in Place and Achieving Long Life  (2014)

Maintenance and Surface Preparation Activities Prior to Pavement Preservation Treatments  (2021)

Characterization of Cementitiously Stabilized Layers for Use in Pavement Design and Analysis  (2014)

Guidelines for Concrete Mixtures Containing Supplementary Cementitious Materials to Enhance Durability of Bridge Decks  (2007)