Skip to main content

Currently Skimming:


Pages 18-18

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 18...
... assurance t h a t the e l e c t r i c a l performance of the ABM power system would meet the G u i d e l i n e s , T h i s procedure, together with manuf a c t u r e r t e s t i n g of two or three u n i t s i n p a r a l l e l operation, was considered adequate to assure s a t i s f a c t o r y p l a n t performance. GENERATION AND DISTRIBUTION OF PRECISE POWER Each of the two radar k l y s t r o n tubes i s s u b j e c t to crowbarring and must have each tube c i r c u i t protected from the e l e c t r i c a l disturbance produced by the adjacent tube to obtain the d e s i r e d q u a l i t y of s i g n a l .

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.