Appendix A: Executive Summary and Table of Contents from ASR Regional Study Draft Project Management Plan
Pages 47-56

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 47...
... As noted above, the CROGEE ASR subcommittee previously reviewed the draft PMPs for the Lake Okeechobee and HilIsboro ASR Pilot Projects. Their report, dated February 2001, provided a technical critique of the ASR Pilot Project studies and strongly concurred with the Corps and SFWMD plan for a 47
From page 48...
... Address outstanding issues of a regional nature that cannot be adequately addressed by the authorized ASR Pilot Projects Reduce uncertainties related to full-scale CERP ASR implementation by conducting scientific studies based on existing and newly acquired data and evaluate potential effects on water levels and water quality within the aquifer systems, and on existing users, surface-water bodies, and the flora and fauna that inhabit them.
From page 49...
... The ASR Regional Study described in this PMP will take roughly 9 years to complete and has a budgeted cost including contingency funds of approximately $45,000,000. This study will conduct critical ASR related studies and develop scientific data required to help determine the engineering feasibility of large-scale ASR implementation as proposed in the CERP.
From page 50...
... Aquifer Storage and Recovery Potential Effects on Mercury Bioaccumulation for South Flonda Ecosystem Restoration Projects 7. Relationship between ASR Storage Properties, Recovery Rates and Recharge Volume Regional Study Pilot Projects Regional Study Pilot Projects Regional Study Pilot Projects Pilot Projects Regional Study Pilot Projects Regional Study Pilot Projects Regional Study - Regional Hydrogeologic Evaluation - Test/Monitor Well Drilling & Tests - Seismic Reflection Survey - Geochemistry Studies ASR/Monitor Well Dnlling, Background Water Quality - Rock Fracturing Desk Top Analysis - Regional Groundwater Modeling - Laboratory Analysis of Cores - Regional Potentiometnc Head (I,iterature Review)
From page 51...
... Appendi~c A 51 ~ _ : ~: :: _ J ~ ~ ~:` .
From page 52...
... 6.0 Field Data Collection. Scope includes development of a data collection plan based data gaps identified in Task 3.0, drilling and testing of new wells, seismic reflection surveys, groundwater monitoring, tracer tests, testing of existing wells, and post cycle test logging and insitu dissolution experiments at 2 pilot project wells.
From page 53...
... Scope includes screening ioassays, extended bioassay testing, biological monitoring of localized impacts at ASR Pilot Projects) , mercury methylation testing, fish/clam mesocosm studies, pidemiological study of fish consumption, and water treatment residuals management assessment.
From page 54...
... Regional Issues in Aquifer Storage and Recovery for Everglades Restoration ASR Regional Study Draft Project Management Plan Table of Contents List of Figures 1 List of Acronyms 2 List of Project Management Plan Preparers 5 PROJECT INFORMATION 6 54 1.1 1.2 1.3 2.0 2.1 2.2 Authority/Author~zation 2.2.1 Federal Authority 10 2.2.2 State Authority 10 2.3 Related Projects 11 2.3.1 CERP Lake Okeechobee ASR Pilot Project 11 2.3.2 CERP HilIsboro ASR Pilot Project 12 2.3.3 2.3.4 Project Background 6 10 CERP Caloosahatchee River ASR Pilot Project Southwest Florida Feasibility Study 12 3.0 PROJECT SCOPE 14 12 3.1 Project Goals and Objectives 15 3.2 Description of CERP Components 15 3.3 Project Constraints and Assumptions 16 3.4 Technical Tasks Descriptions 16 3.4.1 TASK 1 - Build Inventory of Existing Data and Information 17 3.4.2 TASK 2 - Evaluation of Drilling and Geophysical Methods 18 3.4.3 TASK 3 - Define PreliminarY HYdro~eolo~ic Framework 19 3.4.4 v v ~ ~ TASK 4 - Geochemistry 20 3.4.5 TASK 5 - Pressure Induced Changes 31 3.4.6 TASK 6 - Hydrogeologic Field Data Collection 32 3.4.7 TASK 7 - Laboratory Analyses 43 3.4.8 TASK 8 - Finalize Conceptual Hydrogeologic Framework 49 3.4.9 TASK 9 - Regional Groundwater Modeling 50 3.4.10 TASK 10 - Surface Water Quality Data Analysis 54 3.4.11 TASK 11 - Water Quality Monitoring of Source and Receiving Waters 57 3.4.12 TASK 12 - Surface Water Quality Modeling 59 3.4.13 TASK 13 - Ecotoxicological and Ecological Field Studies 62 3.4.14 TASK 14 - Project Summary Reporting 66 4.0 4.1 5.0 SUMMARY OF AGENCY RESPONSIBILITIES 67 Responsibility Identification 67 PROJECT CHANGES 68 List of PMP Updates and Revisions 68 Changes in Project Schedule and Cost68 Changes in Project Schedule 68 Changes in Project Cost Estimates 69
From page 55...
... Integration 93 71 l~`re~rh to ~inoritv and Socially and Economically Disadvantaged Communities 80 81 81 8.0 8.1 8.2 55 88 UNIQUE FEATURES 98 Regulatory Guidance on Tracer Tests for CERP Pilot Project Wells 98 Project Issues Related to the unprecedented Large Scale ASR 99
From page 56...
... TAB C - Cost Listing by Agency/Organizational Unit TAB D - Projected Annual Budget TAB E - Project Cash Flow Curve TAB F- Contingency Summary and Status APPENDIX F - FUNCTIONAL AREA PLANS TAB A- Activities by Agency, Organizational Unit, and Resource TAB B - Cost Allocation by Fiscal Year TAB C - Geochem - Water Quality Sampling TAB D - Geochem - Rock Chemistry APPENDIX G- CONTRACTING ACQUISITION PLAN APPENDIX H- QUALITY CONTROL PLAN TAB A - Independent Technical Review Plan TAB B - Statement of Technical and Legal Review APPENDIX I - PUBLIC INVOLVEMENT APPENDIX J- LIST OF REFERENCE DOCUMENTS APPENDIX K- LIST OF PMP UPDATES AND REVISIONS APPENDIX L - ECOLOGICAL AND WATER QUALITY STUDIES