Skip to main content

Currently Skimming:

5 Mission and Strategic Planning
Pages 59-62

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 59...
... A broad range of participants (a planning team) is needed for a successful strategic planning process.
From page 60...
... requires a strategic plan for zoos. Specific elements of the strategic planning process for a zoo should include (adapted from Pensacola Junior College, 2004)
From page 61...
... Staff from all levels within the zoo is represented during the planning process, along with various internal stakeholder groups (e.g., NZP Advisory Board, CRC Foundation, Science Advisory Group, FONZ Board.) (NZP, Draft NZP Strategic Planning Roles, January 9, 2004)
From page 62...
... An integrated plan for the entire institution incorporating the 10-year facility revitalization and animal collections plans has not been developed. Immediate Needs: The National Zoo should develop a comprehensive strategic plan and provide integrated goals for all aspects of the institution, with operational goals and performance measures, as soon as possible.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.