... 4 A 1996 survey by the Nuclear Regulatory Commission (USNRC, 1996) found that the majority of commercial power reactors routinely offload their entire core to the spent fuel pool during refueling outages.
From page 41...
... The superstructures and pools were not, however, specifically designed to resist terrorist attacks. The typical spent fuel pool is about 40 feet (12 meters)
From page 42...
... Nuclear Regulatory Commission staff is conducting a survey of the plants to obtain a better understanding of the variations in design of spent fuel pools across the nation. The following information was provided to the committee from that survey: 7 The higher elevation accommodates control mechanisms that sit under the reactor, and the extra height accommodates steam separation and drying equipment at the top of the vessel.
From page 43...
... SOURCE: American Nuclear Society (1988) , • PWR spent fuel pools: Spent fuel pools are located in buildings adjoining the reactor containment buildings at PWR plants (see FIGURE 3.2)