Skip to main content

Currently Skimming:

Facilities and Personnel
Pages 5-6

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 5...
... The expansion will add a new cold source, guide, and guide hall and will also allow optimization of the existing instruments across the aggregate flight paths. This optimization includes separation of high magnetic field instruments to minimize cross talk with magnetically sensitive instruments and experiments.
From page 6...
... Planning for coolant systems modifications and rerouting necessitated by the expansion of the guide hall/experimental area is well in hand. It is based on allowing as much time as possible for making final decisions on the specifications of the new instruments to be located there.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.