From page 53...
... Long-term strategy for ensuring climate records and broader climate services vision⎯overlap, calibration, redundant measurements/validation, data processing/reprocessing, algorithm development/evolution, archiving, science teams, grants/funding programs to support science teams Breakout Session 1⎯Consideration of NPOESS and GOES-R Priority Measurements for EVCs/Climate Data Records Related to Observations of the Atmosphere Tom Vonder Haar, Col. State and John Bates NCDC Rapporteur: Mark Schoeberl, GSFC Breakout Session 2⎯Consideration of NPOESS and GOES-R Priority Measurements for ECVs/Climate Data Records Related to Observations of the Oceans Bob Weller, invited and Jeff Privette NCDC Rapporteur: Ralph Milliff, NWRA Breakout Session 3⎯Consideration of NPOESS and GOES-R Priority Measurements for ECVs/Climate Data Records Related to Observations of the Land Berrien Moore, UNH and Marc Imhoff, GSFC Rapporteur: Compton Tucker, CCSP 4:30 Workshop adjourns for the day JUNE 20, 2007 8:30 a.m.
From page 54...
... of Wisc.; David Crain, ITT Critique of the NOAA Analysis of Alternatives Document⎯ Bob Atlas, NOAA GIFTS and its potential role in a mitigation strategy⎯ Bob Atlas, NOAA Science Validation using Observation System Simulated Experiment⎯Bob Atlas, NOAA Discussion 4:30 Workshop Adjourns for the day JUNE 21, 2007 Plenary 8:00 Report out of Day 2 Panels PREPUBLICATION COPY -- SUBJECT TO FURTHER EDITORIAL CORRECTION 54
From page 55...
... Introduction of the Panel⎯ Jim Purdom Context of the NRC Panel on Options⎯ Antonio Busalacchi GOES-R hyperspectral measurements for climate⎯ Paul Menzel/Jim Purdom CEOS strategy on climate observations from space⎯ Barbara Ryan WMO workshop on optimization⎯ Don Hinsman GMES and climate modeling⎯ Tony Hollingsworth Closing remarks⎯ Jim Purdom Panel questions and discussion Closing remarks⎯ Jim Purdom and Antonio Busalacchi 12:15 Working Lunch 1:30 Breakouts Panel to Explore Particular Mitigation Options In Need of Further Analysis Panel on Issues Related to CDR Generation Review requirements for CDRs (contrast with data retrievals for weather) and assess adequacy of current, post Nunn-McCurdy plans, for: Pre-launch instrument characterization and on-orbit cal/val Overlap and replenishment requirements Data Storage, Archive, Distribution and Reprocessing Panel-of-Panels Synthesis (what's been lost; what can be recovered; and, per NASA request, interplay with decadal survey recommendations)
From page 57...
... Executive Summary • OSTP requested NOAA and NASA to provide: – An analysis of possible mitigation options of the climate impacts of the NPOESS Nunn-McCurdy Certification through 2026 – An assessment of the potential costs of these options • Primary goal: Ensure continuity of long-term climate records • NOAA and NASA analyzed the following options: – Remanifesting the climate sensors on NPOESS spacecraft – Placing sensors on currently planned non-NPOESS spacecraft – Developing new gap-filling climate satellite missions – Partnering opportunities • Key results: – Work in progress: still assessing options – Multiple options exist to mitigate the loss of sensors from NPOESS – Options consistent with Decadal Survey recommendations – Partnering for altimetry could provide significant cost savings June 19, 2007 2 Pre-Decisional Document: Assessment involves preliminary ROM cost estimates only PREPUBLICATION COPY -- SUBJECT TO FURTHER EDITORIAL CORRECTION 57
From page 58...
... – Measures the global distribution of aerosols and their impact on the Earth's energy balance, clouds, and precipitation June 19, 2007 3 Pre-Decisional Document: Assessment involves preliminary ROM cost estimates only PREPUBLICATION COPY -- SUBJECT TO FURTHER EDITORIAL CORRECTION 58
From page 59...
... – Reduced Capability – Provides sea surface temperatures, sea ice and snow cover extents, soil moisture, ocean surface wind speed, water vapor, and precipitation rates even in the presence of heavy cloud cover – Continuous records date back to 1987 • Visible Infrared Imaging Radiometer Suite (VIIRS) – Reduced Coverage (Absent from 0930 Orbit)
From page 60...
... Development of Mitigation Options • Multiple options exist to mitigate the loss of sensors from NPOESS • Developed options using following criteria: – Minimize risk to measurement continuity • First priority for existing climate data records – Minimize risk to existing programs – Cost effectiveness • Economies of scale • Leverage planned missions and sensors including partnerships with other space agencies June 19, 2007 5 Pre-Decisional Document: Assessment involves preliminary ROM cost estimates only PREPUBLICATION COPY -- SUBJECT TO FURTHER EDITORIAL CORRECTION 60
From page 61...
... Potential Mitigation Options • Option 1: NPOESS + Gap Filler Climate Satellite • Option 2: Sequential Climate Satellites • Option 3: Sequential Climate Satellites w/ TSIS Redundancy • Option 4: Sequential Climate Satellites w/ TSIS Redundancy & Operational Risk Reduction • These options also include free-flyer altimetry missions and climate data record science support June 19, 2007 6 Pre-Decisional Document: Assessment involves preliminary ROM cost estimates only PREPUBLICATION COPY -- SUBJECT TO FURTHER EDITORIAL CORRECTION 61
From page 62...
... Aura NPP Climate Sat 1 Climate Sat 2 NPOESS C3 APS Glory Climate Sat 2 Current and Planned Missions NASA-NOAA Mitigation Flight NPOESS Mitigation Flight June 19, 2007 7 Pre-Decisional Document: Assessment involves preliminary ROM cost estimates only PREPUBLICATION COPY -- SUBJECT TO FURTHER EDITORIAL CORRECTION 62
From page 63...
... •AVHRR flies on METOP mid-morning orbit •CMIS to be replaced by MIS starting with C2 June 19, 2007 8 Pre-Decisional Document: Assessment involves preliminary ROM cost estimates only PREPUBLICATION COPY -- SUBJECT TO FURTHER EDITORIAL CORRECTION 63
From page 64...
... Altimeter #2 Specified lifetime Extended operations Potential data gap 007 Pre-Decisional Document: Assessment involves preliminary ROM cost estimates only PREPUBLICATION COPY -- SUBJECT TO FURTHER EDITORIAL CORRECTION 64