From page 46...
... This reflects the initial design approach, which was to treat As discussed in more detail below, it is worthwhile all contaminated or possibly contaminated hazardous wastes noting that the secondary wastes being considered here are onsite. However, the shipment of certain secondary wastes not chemical agent or streams with significant agent, agent to suitable offsite treatment, storage, and disposal facilities degradation, or other organic material concentrations.
From page 47...
... made from the Anniston, Alabama, and Aberdeen, Maryland, chemical agent disposal facilities in double containers using Energetics Hydrolysate headspace analysis to determine the suitability for shipment. The spent activated carbon generated at both BGCAPP At BGCAPP and PCAPP, energetics, which include the and PCAPP will have the same contaminants as the carbon burster charges, fuzes, and contaminated propellants, are sent already shipped offsite from other chemical agent disposal to an energetics batch hydrolyzer for treatment to 99.999 facilities.
From page 48...
... had written specific guidance for offsite containing 50 percent solids. Brines and brine salts are rou shipments of selected secondary wastes from currently opertinely disposed of offsite at all currently operating chemical ating chemical agent disposal facilities.
From page 49...
... indicated that if the first-of-a-kind shipment of secondary waste with agent contamination >1 SCWO treatment unit is eliminated, it might deem the RD&D VSL from chemical agent disposal facilities even though the approach inappropriate, and in that case, BGCAPP would Department of Transportation has no such regulation. have to apply for and receive a standard RCRA operating permit under a Part B application (Bizzigotti et al., 2006)
From page 50...
... For purposes manifesting, and emergency response contact information. For of the LDRs, a generator with a listed hazardous waste must chemicals that pose unique hazards to emergency responders, determine if the waste also exhibits any hazardous waste it is a common industrial practice to have personnel trained in emergency response available around the clock to respond to  "Land disposal restrictions and PCAPP wastes," document provided to whatever emergencies might develop.
From page 51...
... • Vehicle inspections and maintenance, • Ensuring driver compliance with DOT requirements, Past Experience With Offsite Disposal and • Development of contingency plans for spills. The Army has been disposing of secondary wastes to offsite facilities from all of the currently operating chemical Personnel responding to emergencies need to be trained agent disposal facilities and continues to do so.
From page 52...
... Spent activated carbon and other closure rect facility-scale comparison is possible. However, the GB wastes were successfully shipped offsite from the Aberdeen hydrolysate from BGCAPP will, like VX hydrolysate, be Chemical Agent Disposal Facility to an appropriate TSDF primarily a caustic water solution with minor organic constit- for ultimate disposal.