Appendix E: Additional Cost Information
Pages 231-260

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 231...
... Appendix E Additional Cost Information 231
From page 232...
... ($) Provide geologic information to map faults and provide data 1-20 560,000 28,000 28,000 28,000 for predictive relationships USGS design applets and website updates 1-20 10,000 500 500 500 Update predictive relationships for ground shaking, including 1-20 153,000 10,200 6,400 7,000 earthquake-physics simulations Update seismic hazard maps for ground shaking 1-20 192,000 9,600 9,600 9,600 Develop predictive models for ground deformation 1-3 1,500 300 0 0 Develop seismic hazard maps for liquefaction 1-20 16,000 800 800 800 Develop seismic hazard maps for surface fault rupture 1-20 4,000 200 200 200 Develop seismic hazard maps for landslide potential 1-20 10,000 500 500 500 Total Cost 946,000 42,340 43,230 37,442 APPENDIX E
From page 233...
... PHASE 1 APPENDIX E Program management, travel and supporta 1.27 0.635 -- -- -- -- Equipment & commercial software licensing 0.26 0.13 -- -- -- -- PHASE II Pilot projects (7 to 9 total) b 3.7 0 0.37 0.74 0.37 -- Operation costsc 9.4 0 0.6 0.6 0.6 0.46 Total Cost 14.63 a Project management, PIMS system programmers, and testing/documentation staff would be budgeted at the GS13 salary range, about $125,000/ year including benefits.
From page 234...
... network coordinating grant: institutionalize coordination functions (e.g., measurement protocols, $400k/yr data archiving, network website, workshops, etc.)
From page 235...
... improved 42,300 2,115 2,115 2,115 component models In-situ testing of existing buildings and components 109,000 50 9,750 6,000 Soil-structure interaction studies 21,500 325 1,045 1,465 Develop and deploy efficient retrofit methods/techniques 15,750 825 775 775 Develop and deploy techniques for NDE of existing construction and conditions 9,750 525 475 475 Develop and deploy a building rating system 4,000 700 0 50 Evaluate reliability of and update ASCE 41 procedures for PBD of existing 18,650 2,065 1,665 0 buildings Collect, curate, and archive building inventory data across the nation 135,650 6,880 6,750 6,750 Performance-based retrofit of nonstructural components and systems 875 175 0 0 Carbon footprint of retrofit building construction 775 155 0 0 Implementation: updating of standards and guidelines; risk reduction 50,400 2,580 2,500 2,500 programs Total Cost 543,570 22,892 33,957 25,932 235
From page 236...
... Numerical studies using improved hysteretic models developed 4-6 1,800 180 180 0 elsewhere Develop and document fragility and consequence functions 2-8 125 13 13 0 Update functions in Years 11-20 1-5 250 0 0 25 Synthesis of results and preparation of technical briefs 5 yearly 500 25 25 25 Develop reliable tools for collapse computations 37,250 1,050 4,075 1,163 Scoping studies and workshop 3 150 30 0 0 Development of work-plan (using also work on improved 3 100 20 0 0 APPENDIX E hysteretic models)
From page 237...
... : archaic and 1-20 8,000 400 400 400 retrofitted Develop nonlinear hysteretic models 1-20 9,000 450 450 450 Validate nonlinear hysteretic models 1-20 8,000 400 400 400 Develop guidelines and tools for FE analysis 5 yearly 600 30 30 30 Synthesis of data and preparation of a technical brief 5 yearly 500 25 25 25 In-situ testing of existing buildings and components 109,000 50 9,750 6,000 Scoping studies and workshop 3 150 30 0 0 237 continued
From page 238...
... 6-18 6,000 0 400 400 Component-level testing to failure: archaic and retrofitted 6-15 40,000 0 4,000 2,000 Numerical studies using component test data 6-18 18,000 0 1,200 1,200 Develop and validate nonlinear hysteretic models (included 0 0 0 0 elsewhere) Synthesis of data and preparation of technical briefs 10, 15, 20 750 0 50 50 Soil-structure interaction studies 21,500 325 1,045 1,465 Scoping studies and workshop 5 200 40 0 0 Development of work-plan 5 100 20 0 0 Centrifuge testing programs (alternate soils, layers, ground water 6-10 3,750 0 750 0 table)
From page 239...
... Synthesis of data and preparation of technical briefs 5, 10, 15, 500 25 25 25 20 Develop and deploy techniques for NDE of existing 9,750 525 475 475 construction and conditions Scoping studies and workshop (utilize existing building 150 30 0 0 construction; included elsewhere) Development of work-plan 2 100 20 0 0 Develop alternate NDE strategies 3-20 9,000 450 450 450 Deploy and test alternate NDE strategies 3-20 0 0 0 0 Synthesis of data and preparation of technical briefs 5, 10, 15, 500 25 25 25 20 239 continued
From page 240...
... ($) Develop and deploy a building rating system 4,000 700 0 50 Scoping studies and workshop 1 200 40 0 0 Development of work-plan 1 100 20 0 0 Numerical studies using data and PBD developed elsewhere 2-4 3,000 600 0 0 Update building rating system in Year 20 20 300 0 0 30 Synthesis of data and preparation of technical briefs 5 and 20 400 40 0 20 Evaluate reliability, and update, ASCE 41 procedures for 18,650 2,065 1,665 0 performance-based design of existing buildings Scoping studies and workshop 1 150 30 0 0 Development of work-plan 1 100 20 0 0 Develop a method to translate test data into acceptance criteria 2 200 40 0 0 Benchmark linear and nonlinear static procedures using nonlinear 2-4 1,800 360 0 0 dynamic analysis Benchmark all analysis procedures using earthquake data 2-4 1,800 360 0 0 Calibrate retrofit standards against performance expectations for 6-8 1,800 0 360 0 new buildings Clarify performance expectations in ASCE 31/41 9 and 10 250 0 50 0 Revise linear and nonlinear static procedures based on benchmarking 4-5 150 30 0 0 Evaluation of procedures/acceptance criteria using NEES facilities 2-5 6,000 1,200 0 0 Evaluation of system-level predictions using NEES facilities and 6-8 6,000 0 1,200 0 E-Defense APPENDIX E
From page 241...
... Update of nonlinear dynamic analysis procedures 8-10 150 0 30 0 Synthesis of results and preparation of technical briefs 5 and 10 250 25 25 0 Collect, curate, and archive building inventory data across the 135,650 6,880 6,750 6,750 APPENDIX E nation Scoping studies and workshop 1 task 200 40 0 0 Development of work-plan and standardized procedures 1 task 150 30 0 0 Develop procedures to track replacement of deficient buildings and 2 and 3 300 60 0 0 update archive/loss estimates 50 cities 1-20 135,000 6,750 6,750 6,750 Performance-based retrofit of nonstructural components and 875 175 0 0 systems Scoping studies and workshop 1 150 30 0 0 Development of a work-plan 1 100 20 0 0 Develop procedures, tools, and recommendations for retrofit of 2 and 3 500 100 0 0 architectural and M/E/P components and systems Prepare technical brief 4 125 25 0 0 Carbon footprint of retrofit building construction 775 155 0 0 Scoping studies and workshop 1 150 30 0 0 Development of a work-plan 1 100 20 0 0 Carbon footprint calculation framework 2 and 3 100 20 0 0 Carbon footprint calculations for retrofit construction 3 and 4 100 20 0 0 Inclusion of carbon-based effects in loss computations 4 and 5 200 40 0 0 Prepare a technical brief 5 125 25 0 0 241 continued
From page 242...
... ($) Implementation 50,400 2,580 2,500 2,500 Support updating of standards and guidelines 10,000 500 500 500 Develop methods to measure contributions of building stock to 1-3 400 80 0 0 community resilience Encourage risk reduction programs across the nation 40,000 2,000 2,000 2,000 Total Cost 543,570 22,892 33,957 25,932 aBold headings within the Research and Development Task column represent the overarching title and cost summary of underlying non-bold components.
From page 243...
... ($) APPENDIX E Program coordination and management 148,585 7,429 7,429 7,429 NEES maintenance and operation; new equipment 500,000 25,000 25,000 25,000 Effect of ground deformation on buildings 8,975 250 895 325 Site response analysis 12,050 1,615 385 205 Constitutive models for soils 17,150 1,490 1,440 250 Soil-foundation-structure interaction 21,500 325 1,045 1,465 Selection and scaling of earthquake ground motions 2,550 75 205 115 Improved hysteretic models of structural components 42,300 2,115 2,115 2,115 Evaluate reliability of ASCE 41 procedures for performance-based design 14,600 1,665 1,255 0 Develop reliable tools for collapse computations 37,250 1,050 4,075 1,163 Develop fragility and consequence functions for modern and archaic components 5,875 858 218 50 Loss estimation tools for PBEE 925 0 0 93 Expected performance of code-conforming structures 3,450 690 0 0 Expand ATC-58 performance-based design methodology 2,800 280 150 65 Performance-based design of nonstructural components and systems 1,325 265 0 0 Smart/innovative/adaptive/sustainable components and framing systems 51,500 2,500 2,500 2,650 Carbon footprint of new and retrofit building construction 675 135 0 0 Implementation: Updating of Standards and Guidelines 20,000 1,000 1,000 1,000 Total Cost 891,510 46,742 47,712 41,924 243
From page 244...
... Effect of ground deformation on buildings 8,975 250 895 325 Scoping studies and workshop 5 125 25 0 0 Development of work-plan 5 100 20 0 0 Experimental studies using NEES facilities 6-9 3,000 600 0 Effect of ground deformation on buildings 7-10 900 180 0 Validation of numerical tools by experimentation using NEES 11-15 3,000 0 300 facilities and E-Defense Techniques to mitigate the effects of liquefaction using NEES 2-10 1,350 180 90 0 facilities Synthesis of data and preparation of technical briefs 5 (ground 500 25 25 25 deformation predictions) , 10, 15, 20 Site response analysis 12,050 1,615 385 205 Scoping studies and workshop 1 150 30 0 0 Development of workplan 1 100 20 0 0 Field testing using NEES facilities 2-4 5,000 1,000 0 0 (3 yrs of testing across the nation; incl.
From page 245...
... using NEES facilities Develop equivalent linear models 2-10 2,250 225 225 0 Develop nonlinear hysteretic models 2-10 2,250 225 225 0 Implementation in FE codes 2-10 900 90 90 0 Updates to work in Years 11-20 11-20 2,250 0 0 225 Synthesis of data and preparation of a technical brief 5, 10, 15, 20 500 25 25 25 Soil-foundation-structure interaction 21,500 325 1,045 1,465 Scoping studies and workshop 5 200 40 0 0 Development of work-plan 5 100 20 0 0 Centrifuge testing programs (alternate soils, layers, ground 6-10 3,750 0 750 0 water table) Develop simplified guidelines and tools for isolated structures 11-15 1,350 0 0 135 245 continued
From page 246...
... ($) Develop simplified guidelines and tools for clusters of 11-15 1,350 0 0 135 structures Develop procedures for time-domain FE analysis 6-10, 15-20 2,700 0 270 135 Develop procedures for probabilistic SSI analysis 1-5 1,200 240 0 0 Implementation of time and frequency domain algorithms in 11-15 1,350 0 0 135 FE codes Validation of numerical tools by experimentation using NEES 11-15 6,000 0 0 600 facilities and E-Defense Update of tools and procedures in Years 16-20 3,000 0 0 300 Synthesis of data and preparation of technical briefs 5, 10, 15 , 20 500 25 25 25 Selection and scaling of earthquake ground motions 2,550 75 205 115 Scoping studies and workshop 2 150 30 0 0 (assumes that Phase 1 procedures for buildings developed under existing contracts)
From page 247...
... 1-20 8,000 400 400 400 APPENDIX E Develop nonlinear hysteretic models 1-20 9,000 450 450 450 Validate nonlinear hysteretic models 1-20 8,000 400 400 400 Develop guidelines and tools for FE analysis Every 5 600 30 30 30 years Synthesis of data and preparation of a technical brief Every 5 500 25 25 25 years Evaluate reliability of ASCE 41 procedures for PBD 14,600 1,665 1,255 0 Scoping studies and workshop 1 150 30 0 0 Development of work-plan 1 100 20 0 0 Benchmark linear and nonlinear static procedures using 2-4 1,800 360 0 0 nonlinear dynamic analysis Revise linear and nonlinear static procedures based on 4-5 150 30 0 0 benchmarking Evaluation of procedures/acceptance criteria using NEES 2-5 6,000 1,200 0 0 facilities Evaluation of system-level predictions using NEES facilities 6-8 6,000 0 1,200 0 and E-Defense Update of nonlinear dynamic analysis procedures 8-10 150 0 30 0 Synthesis of results and preparation of technical briefs 5 and 10 250 25 25 0 Develop reliable tools for collapse computations 37,250 1,050 4,075 1,163 Scoping studies and workshop 3 150 30 0 0 247 continued
From page 248...
... Understanding the triggers for collapse of multiple framing 6-10 2,250 0 450 0 systems Improved system-level collapse computations and FE codes 6-15 2,250 0 225 113 Validation of improved computational procedures using NEES 11-20 8,000 0 0 800 facilities and E-Defense Synthesis of results and preparation of technical briefs Every 5 500 25 25 25 years Develop fragility and consequence functions for modern 5,875 858 218 50 and archaic components Scoping studies and workshop 1 100 20 0 0 Development of a workplan 1 100 20 0 0 APPENDIX E
From page 249...
... Update functions in Years 11-20 250 0 0 25 (Use experimental data generated elsewhere) Synthesis of results and preparation of technical briefs 5-yearly 500 25 25 25 Loss estimation tools 925 0 0 93 Scoping studies and workshop 11 100 0 0 10 Development of a work-plan 11 100 0 0 10 Develop and implement tools for ground deformation 12-13 200 0 0 20 Develop and implement tools for fire-following-earthquake 13-14 200 0 0 20 Develop and implement tools related to carbon emissions 12-13 200 0 0 20 Synthesis of results and preparation of technical briefs 15 125 0 0 13 Expected performance of code-conforming structures 3,450 690 0 0 Scoping studies and workshop 1 150 30 0 0 Development of a work-plan 1 100 20 0 0 Assess performance of code-conforming structures -- WUS 2-3 500 100 0 0 Assess performance of code-conforming structures -- PNW 2-3 500 100 0 0 Assess performance of code-conforming structures -- CEUS 2-3 1,000 200 0 0 Revise ASCE-7 provisions, values of R, etc 4 and 5 1,000 200 0 0 Synthesis of results and preparation of technical briefs 5 200 40 0 0 249 continued
From page 250...
... ($) Expand ATC-58 PBD methodology 2,800 280 150 65 Scoping studies and workshop 1 150 30 0 0 Development of a work-plan 1 100 20 0 0 Expand methodology to include ground deformation 11-13 200 0 0 20 Expand methodology to include post-earthquake flooding 11-13 200 0 0 20 Extend methodology to lifelines 2-4 500 100 0 0 Extend methodology to earthen structures 2-4 200 40 0 0 Extend methodology to selected infrastructure 6-10 500 0 100 0 Extend methodology to flood protection structures 2-4 200 40 0 0 Prepare technical briefs 5, 10, 15 750 50 50 25 PB design of nonstructural components and systems 1,325 265 0 0 Scoping studies and workshop 1 100 20 0 0 Development of a work-plan 1 100 20 0 0 Develop procedures and tools for architectural and M/E/P 2-5 1,000 200 0 0 components systems Prepare technical brief 5 125 25 0 0 Smart/innovative/adaptive/sustainable components and 51,500 2,500 2,500 2,650 framing systems Development and deployment of smart framing systems, incl.
From page 251...
... , incl. hysteretic models Preparation of standards and guidelines for smart framing 11-20 500 0 0 50 APPENDIX E systems Preparation of standards and guidelines for adaptive 11-20 500 0 0 50 components Preparation of standards and guidelines for sustainable 11-20 500 0 0 50 components Carbon footprint of new and retrofit building construction 675 135 0 0 Scoping studies and workshop 1 150 30 0 0 Development of a work-plan 1 100 20 0 0 Carbon footprint calculation framework for new and archaic 2 and 3 100 20 0 0 framing systems Carbon footprint calculations for retrofit construction 3 and 4 100 20 0 0 Inclusion of carbon-based effects in loss computations 4 and 5 100 20 0 0 Prepare a technical brief 5 125 25 0 0 Implementation: updating of standards and guidelines 20,000 1,000 1,000 1,000 Total Cost 891,510 46,742 47,712 41,924 aBold headings within the Research and Development Task column represent the overarching title and cost summary of underlying non-bold components.
From page 252...
... ($) Engineering research center management 55,735 2,787 2,787 2,787 Investigate and characterize new materials 73,300 4,685 6,575 1,700 Devise new modular precast components and framing systems 8,175 0 835 400 Develop tools, technologies, and details to join new materials 16,000 0 1,100 1,050 Prototype components, connections, and framing systems 8,200 0 469 586 Moderate and full-scale testing of components with new materials using NEES 50,700 0 0 5,070 infrastructure Full-scale tests of 3D framing systems 15,550 0 0 1,555 Develop design tools and equations for new materials 8,000 0 0 800 Develop and characterize a new family of adaptive materials 15,650 0 1,600 765 Develop robust algorithms for controlling the response of adaptive materials 5,300 0 0 530 Develop a family of low-cost, low-power, zero maintenance wireless sensors 12,800 685 625 625 Prototype adaptive materials and components at the macro scale 8,100 0 0 810 Develop algorithms to control response of framing systems with adaptive 8,000 0 0 800 components Moderate and full-scale testing of adaptive components using NEES infrastructure 25,550 0 0 2,555 Full-scale tests of adaptive 3D framing systems 15,350 0 0 1,535 Develop design tools and equations for adaptive components and systems 8,000 0 0 800 Total Cost 334,410 8,157 13,990 22,368 APPENDIX E
From page 253...
... Small-scale characterization studies -- metals 2-10 15,000 1,500 1,500 0 Small-scale characterization -- polymers 2-10 15,000 1,500 1,500 0 Small-scale characterization -- others 6-15 7,500 0 750 375 Develop micro-mechanical models for new materials 6-20 18,000 0 1,200 1,200 Synthesis of data and preparation of technical briefs 5, 10, 15, 2,500 125 125 125 20 Devise new modular precast components and framing systems 8,175 0 835 400 Scoping studies and workshop 6 200 0 40 0 Development of work-plan 6 100 0 20 0 Develop new components and systems 7-15 7,500 0 750 375 Synthesis of data and preparation of a technical brief 10, 15, 20 375 0 25 25 Develop tools, technologies, and details to join new materials 16,000 0 1,100 1,050 Scoping studies and workshop 6 150 0 30 0 Development of work-plan 6 100 0 20 0 253 continued
From page 254...
... 7-20 15,000 0 1,000 1,000 Synthesis of data and preparation of a technical brief 10, 15, 20 750 0 50 50 Prototype components, connections, and framing systems 8,200 0 469 586 Scoping studies and workshop 8 100 0 20 0 Development of work-plan 8 100 0 20 0 Prototype components, connections, and systems 9-15 7,500 0 429 536 Synthesis of data and preparation of a technical brief 15, 20 500 0 0 50 Moderate and full-scale testing of components with new 50,700 0 0 5,070 materials using NEES infrastructure Scoping studies and workshop 11 100 0 0 10 Development of work-plan 11 100 0 0 10 Component testing program (reaction walls/floors, laminar boxes) 12-20 30,000 0 0 3,000 using NEES facilities Develop nonlinear hysteretic models and design equations for 12-20 9,000 0 0 900 materials standards Implementation of models in FE codes 12-20 9,000 0 0 900 Develop fragility and consequence functions for PBD 12-20 2,000 0 0 200 Synthesis of data and preparation of a technical brief 15, 20 500 0 0 50 Full-scale tests of 3D framing systems 15,550 0 0 1,555 Scoping studies and workshop 16 200 0 0 20 Development of work-plan 16 100 0 0 10 APPENDIX E
From page 255...
... Full-scale testing using NEES facilities and E-Defense 17-20 12,500 0 0 1,250 Validation of numerical tools and models 18-20 2,250 0 0 225 Synthesis of data and preparation of technical briefs 15 and 20 500 0 0 50 Develop design tools and equations for new materials 8,000 0 0 800 APPENDIX E Scoping studies and workshop 16 200 0 0 20 Development of work-plan 16 100 0 0 10 Develop design tools and equations 17-20 4,500 0 0 450 Prepare materials standards (e.g., ACI 318) 17-20 2,700 0 0 270 Synthesis of data and preparation of technical briefs 20 500 0 0 50 Develop and characterize a new family of adaptive materials 15,650 0 1,600 765 Scoping studies and workshop 6 200 0 40 0 Development of work-plan 6 150 0 30 0 Develop and characterize new materials and fluids 7-15 15,000 0 1,500 750 Synthesis of data and preparation of technical briefs 10 and 15 300 0 30 15 Develop robust algorithms for controlling the response of 5,300 0 0 530 adaptive materials Scoping studies and workshop 11 150 0 0 15 Development of work-plan 11 150 0 0 15 Algorithm development and validation 12-18 4,500 0 0 450 Synthesis of data and preparation of a technical brief 15 and 20 500 0 0 50 Develop a family of low-cost, low-power, zero maintenance 12,800 685 625 625 wireless sensors Scoping studies and workshop 1 200 40 0 0 Development of work-plan 1 100 20 0 0 Develop sensors 2-20 12,000 600 600 600 255 continued
From page 256...
... ($) Synthesis of results and preparation of technical briefs 5, 10, 15, 500 25 25 25 20 Prototype adaptive materials and components at the macro scale 8,100 0 0 810 Scoping studies and workshop 11 200 0 0 20 Development of work-plan 11 150 0 0 15 Prototype components, connections, and systems 12-15 7,500 0 0 750 Synthesis of results and preparation of technical briefs 15 and 20 250 0 0 25 Develop algorithms to control response of framing systems 8,000 0 0 800 with adaptive components Scoping studies and workshop 11 150 0 0 15 Development of a work-plan 11 100 0 0 10 Algorithm development and validation by testing 12-20 7,500 0 0 750 Synthesis of results and preparation of technical briefs 15 and 20 250 0 0 25 Moderate and full-scale testing of adaptive components using 25,550 0 0 2,555 NEES infrastructure Scoping studies and workshop 15 200 0 0 20 Development of work-plan 15 100 0 0 10 Component testing program (reaction walls/floors, laminar boxes)
From page 257...
... Develop fragility and consequence functions for PBD 16-20 1,000 0 0 100 Synthesis of data and preparation of a technical brief 20 250 0 0 25 Full-scale tests of adaptive 3D framing systems 15,350 0 0 1,535 APPENDIX E Scoping studies and workshop 16 200 0 0 20 Development of work-plan 16 150 0 0 15 Full-scale testing using NEES facilities and E-Defense 17-20 12,500 0 0 1,250 Validation of numerical tools and models 18-20 2,250 0 0 225 Synthesis of data and preparation of technical briefs 20 250 0 0 25 Develop design tools and equations for adaptive components 8,000 0 0 800 and systems Scoping studies and workshop 16 200 0 0 20 Development of work-plan 16 100 0 0 10 Develop design tools and equations 17-20 4,500 0 0 450 Prepare materials standards (e.g., ACI 318) 17-20 2,700 0 0 270 Synthesis of data and preparation of technical briefs 20 500 0 0 50 Total Cost 334,410 8,157 13,990 22,367 aBold headings within the Research and Development Task column represent the overarching title and cost summary of underlying non-bold components.
From page 258...
... Monitor, evaluate, 0 0.25 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 analysis, feedback, revision Revise strategy 2 0 0 0 0 0.5 0 0 0.5 0 0.5 0 0.5 0 0 Annual workshop 3 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 State participation 73.5 0 0.75 2.25 3.0 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 (estimate 30 states) Total Cost 1,001 3.9 12 21.3 37 54 61 68.5 69.5 69 69.5 69 54.5 39 24 APPENDIX E
From page 259...
... • Must describe outcomes of more resilient communities in more meaningful terms such as codes adopted and enforced, community understand ing, land-use plans that consider earthquake hazard, that measures taken before earthquakes will have a multihazard application • Community strategy could "require" a comprehensive school earthquake safety element (awareness, curriculum, preparedness, building analysis and mitigation)