Skip to main content

Currently Skimming:

Appendix A: Model Estimated Nitrogen, Phosphorus, and Sediment Loads by Sector for Five Scenarios
Pages 185-186

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 185...
... deposition 4.1 2.5 2.6 2.6 2.3 All Sources 341.9 245.8 192.3 186.0 140.6 TABLE A-2 Total Phosphorus Loads by Source (million pounds per year) Source 1985 2009 TS TMDL E3 Agriculture 9.2 7.3 5.5 5.1 4.4 Urban runoff 2.3 2.4 1.9 1.7 0.6 Point source 10.1 4.2 4.2 3.1 1.0 Septic 0.0 0.0 0.0 0.0 0.0 Forest 2.3 2.4 2.5 2.5 2.5 NTW atm.
From page 186...
... goals based on the cap loads set in 2003, total maximum daily load (TMDL) , and maximum feasible reduction (E3)


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.