Skip to main content

Currently Skimming:

Appendix L: Estimated Injected Fluid Volumes
Pages 243-246

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 243...
... Per Well (m3) Barnett 4,600,000 2,800,224 10,600 Eagle Ford 5,000,000 4,253,170 16,100 Haynesville 5,000,000 5,679,699 21,500 Marcellus 5,600,000 No data No data Niobrara 3,000,000 No data No data Average volume per well per day 4,640,000 -- -- NOTE: "Daily" hydraulic fracture volume plotted assumes the hydraulic fracturing procedure would take 2 days to complete; the 1-day volume plotted is half the total well volume estimated by King (2012)
From page 244...
... injection of 8,000–11,000 bbl/day. SWD injection volumes estimated from Texas Railroad Commission for SWD wells north of DFW airport.
From page 245...
... 2012. Hydraulic Fracturing 101: What every representative, environmentalist, regulator, reporter, investor, uni versity researcher, neighbor, and engineer should know about estimating frac risk and improving frac performance in unconventional gas and oil wells.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.