Skip to main content

Currently Skimming:

Letter Report
Pages 1-4

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 1...
... Army Element, Assembled Chemical Weapons Alternatives 5183 Blackhawk Road Building E4585, Room 1 Aberdeen Proving Ground, MD 21010-5424 Re: The Blue Grass Chemical Agent Destruction Pilot Plant's Water Recovery System Dear Mr. Whyne: At your request, the National Research Council of the National Academies established the Committee to Review the Water Recovery System for the Blue Grass Chemical Agent Destruction Pilot Plant (BGCAPP)
From page 2...
... The committee also took the following limitations into account during its work:  The footprint for the RO system in the building is limited by the present design;  The BGCAPP design is complete and construction is underway, making significant changes to the design challenging;  This RO system will only be operational for 3 to 5 years, until all the munitions are destroyed and the resulting hydrolysate has been treated; and  Any modifications to the design will necessitate amendments to the present Resource Conservation and Recovery Act permits, which govern plant operations, and will require negotiations with the Kentucky Department for Environmental Protection. The study's scope is defined to encompass operations that begin with the arrival of SCWO effluent and blowdown waters at the WRS for treatment and end with the RO system effluents leaving the WRS to be stored in tanks.
From page 3...
... The committee discusses the design of these tanks vis-à-vis providing the maximum opportunity for settling to occur, and suggests a possible way of compensating for the deletion of the originally planned clarifier by using the SCWO effluent storage tanks. Given the uncertainty about the composition of the effluents that will enter the pretreatment system, and given the results of SCWO tests using blended actual agent and energetics hydrolysates, the committee is concerned about the planned media filtration system's being rapidly overloaded with incoming solids.
From page 4...
... Sincerely, Robert A Beaudet, Chair Committee to Review the Water Recovery System for the Blue Grass Chemical Agent Destruction Pilot Plant Attachments A Statement of Task B Abbreviations and Acronyms C Committee to Review the Water Recovery System for the Blue Grass Chemical Agent Destruction Pilot Plant D Biographies of Committee Members E Acknowledgment of Reviewers -4


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.