Skip to main content

Currently Skimming:

Appendix E: Guiding Principles for Federal Leadership in High-Performance and Sustainable Buildings
Pages 200-202

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 200...
... Use a collaborative, integrated planning and design process that • Initiates and maintains an integrated project team in all stages of a project's planning and delivery; • Establishes performance goals for siting, energy, water, materials, and indoor environmental quality along with other comprehensive design goals; and, ensures incorporation of these goals throughout the design and life cycle of the building; and, • Considers all stages of the building's life cycle, including deconstruction. Commissioning.
From page 201...
... Meet the current ASHRAE Standard 55-2004, Thermal Environmental Conditions for Human Occupancy, including continuous humidity control within established ranges per climate zone, and ASHRAE Standard 62.1-2004, Ventilation for Acceptable Indoor Air Quality. Moisture Control.
From page 202...
... Eliminate the use of ozone depleting compounds during and after construction where alternative environmentally preferable products are available, consistent with either the Montreal Protocol and Title VI of the Clean Air Act Amendments of 1990, or equivalent overall air quality benefits that take into account life cycle impacts.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.