Skip to main content

Currently Skimming:

Appendix E: 2011 NRC Survey Instrument
Pages 275-288

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 275...
... This survey seeks responses related to the [Phase 1 or Phase II] project entitled [insert project title]
From page 276...
... What percentage of the company's revenues during its most recent completed fiscal year was Federal SBIR funding (Phase I and/or Phase II)
From page 277...
... Minority c. For those checking minority PI, add drop down list from SBA Asian-Indian Asian-Pacific Black Hispanic Native American Other 15.
From page 278...
... Aerospace Defense-specific products and services Energy and the environment Sustainable energy production (solar, wind, geothermal, bio-energy, wave) Energy storage and distribution Energy saving Other energy or environmental products and services Engineering Engineering services Scientific instruments and measuring equipment
From page 279...
... During the funding gap between Phase I and Phase II for this award, which of the following occurred? Select all answers that apply [P2 only]
From page 280...
... behind 27. Did this award identify matching funds or other types of cost sharing in the Phase II Proposal?
From page 281...
... Another firm got to the market before us l. Failed to receive Phase II award funding m.
From page 282...
... Enter dollars provided in drop down list provided for each of the listed sources below. [If none for a particular source, enter 0 (zero)
From page 283...
... Prime contractor for NASA f. Agency that awarded the Phase II (if not NASA or DoD)
From page 284...
... Number of related Phase II awards Phase I recipients skip to Q44 PART 7.
From page 285...
... Should the size of Phase II awards be increased even if that means a proportionately lower number of Phase II awards are made? [P2 only]
From page 286...
... We did not apply for Phase III funding 52. How effective was the Project Manager in connecting the company to sources of Phase III funding (such as acquisition programs or venture/angel funding)
From page 287...
... Very hard Hard Easy Very easy 54. Was your Project Manager replaced during the course of your award?
From page 288...
... 288 SBIR AT THE DEPARTMENT OF DEFENSE If any of these are checked (other than "none of the above") , continue to 60a; else skip to Q61 [if you do not check a-g, you should skip 60a as well]


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.