Skip to main content

Currently Skimming:


Pages 333-336

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 333...
... 333 A p p e n d i x p dRAFT SHRp 2 S07 Site Readiness inspection Checklists Site Contractor/State: ______________________________________________ S06 Personnel: _____________________________________________________ SHRP Staff: _________________________________________________________ Inspection Date: ___/___/________ Recommendation & Remediation M  Site Approved M Remediation Measures Required–See bulleted items below Date Required • Area Item • • • • • • • • • • • • • • • • • • • • • • • • (Attach additional sheets or documentation as necessary) Site Readiness Checklist
From page 334...
... 334 General Facilities Yes No Item   M M Approved Federal Wide Assurance on file w/ U.S.
From page 335...
... 335 -- Custom equipment   M M -- Optec 6500 P   M M -- Jamar hand dynamometer (model 5030J1)   M M -- Touch screen monitor   M M -- Bar code reader(s)
From page 336...
... 336 -- Other Tools & Materials   M M Flashlights/shop lights   M M Multi-meter   M M Electric driver   M M Tread depth gauge (Mscdirect.com part number 72461221)   M M Tire Pressure gauge (Mscdirect.com part number 00576835)

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.