Skip to main content

Currently Skimming:


Pages 130-155

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 130...
... TCRP D-12 Final Report A-1 APPENDIX A INTERVIEW AREAS AND MEASUREMENT LOCATION SUMMARY
From page 131...
... TCRP D-12 Final Report A-2 A.1. INTRODUCTION Community interviews and vibration measurements were done at five transit system locations, 1.
From page 132...
... TCRP D-12 Final Report A-3 A.1.1 New York City (Brooklyn) Agency: Metropolitan Transportation Authority (New York City Transit)
From page 133...
... TCRP D-12 Final Report A-4 Figure A-2: New York Interview Sites Figure A-3: New York Residence Measurement Locations
From page 134...
... TCRP D-12 Final Report A-5 Figure A-4: New York Grid Measurement Locations Figure A-5: New York Typical Residential Construction
From page 135...
... TCRP D-12 Final Report A-6 A.1.2 Dallas Area Regional Transit (DART) Agency: Dallas Area Regional Transit (DART)
From page 136...
... TCRP D-12 Final Report A-7 Figure A-7: DART Blue Line Interview Area Figure A-8: DART Red Line Interview Sites
From page 137...
... TCRP D-12 Final Report A-8 Figure A-9: DART Blue Line Interview Sites Figure A-10: DART Red Line Grid and Residence Measurement Locations
From page 138...
... TCRP D-12 Final Report A-9 Figure A-11: DART Blue Line Grid and Residence Measurement Locations Figure A-12: DART Typical Residential Construction
From page 139...
... TCRP D-12 Final Report A-10 A.1.3 Sacramento RT Agency: Sacramento Regional Transit System: Blue Line, Gold Line Mode: Light Rail, Freight Rail Alignment: Surface Train Service: 2-4 car consists (25 m - 50 m) , events/day: 130 Blue, 140 Gold Infrequent freight service.
From page 140...
... TCRP D-12 Final Report A-11 Figure A-13: Sacramento RT Blue Line Interview Area Figure A-14: Sacramento RT Gold Line Interview Area #1
From page 141...
... TCRP D-12 Final Report A-12 Figure A-15: Sacramento RT Gold Line Interview Area #2 Figure A-16: Sacramento RT Gold Line Interview Area #3
From page 142...
... TCRP D-12 Final Report A-13 Figure A-17: Sacramento RT Blue Line Interview Sites
From page 143...
... TCRP D-12 Final Report A-14 Figure A-18: Sacramento RT Gold Line Area #1 Interview Sites Figure A-19: Sacramento RT Gold Line Area #2, #3 Interview Sites
From page 144...
... TCRP D-12 Final Report A-15 Figure A-20: Sacramento RT Blue Line Grid and Residence Measurement Locations
From page 145...
... TCRP D-12 Final Report A-16 Figure A-21: Sacramento RT Gold Line Area #1 Grid and Residence Measurement Locations Figure A-22: Sacramento RT Gold Line Area #2, #3 Grid and Residence Measurement Locations
From page 146...
... TCRP D-12 Final Report A-17 Figure A-23: Sacramento RT Typical Residential Construction
From page 147...
... TCRP D-12 Final Report A-18 A.1.4 Toronto TTC Agency: Toronto Transit Commission (TTC) System: Bloor/Danforth Line Mode: Heavy Rail Alignment: Underground tunnel, cut and cover Train Service: 6-car consists (140 m)
From page 148...
... TCRP D-12 Final Report A-19 Figure A-25: Toronto Interview Sites Figure A-26: Toronto Residence Measurement Locations
From page 149...
... TCRP D-12 Final Report A-20 Figure A-27: Toronto Grid Measurement Locations Figure A-28: Toronto Typical Residential Construction
From page 150...
... TCRP D-12 Final Report A-21 A.1.5 Boston Agency: Massachusetts Bay Transportation Authority (MBTA) System: Orange Line, Commuter Rail, Amtrak, Blue Line Mode: Heavy Rail, Commuter Rail, Inter-city Passenger Rail Alignment: Underground tunnel, cut and cover Train Service: Orange Line: 6 car consists (120 m)
From page 151...
... TCRP D-12 Final Report A-22 Figure A-29: Boston Orange Line/Commuter Rail/Amtrak Interview Area Figure A-30: Boston Blue Line Interview Area
From page 152...
... TCRP D-12 Final Report A-23 Figure A-31: Boston Orange Line/Commuter Rail/Amtrak Interview Sites Figure A-32: Boston Blue Line Interview Sites
From page 153...
... TCRP D-12 Final Report A-24 Figure A-33: Boston Orange Line/Commuter Rail/Amtrak Residence Measurement Locations Figure A-34: Boston Orange Line/Commuter Rail/Amtrak Grid Measurement Locations
From page 154...
... TCRP D-12 Final Report A-25 Figure A-35: Boston Blue Line Residence Measurement Locations Figure A-36: Boston Blue Line Grid Measurement Locations
From page 155...
... TCRP D-12 Final Report A-26 Figure A-37: Boston Orange Line/Commuter Rail/Amtrak Typical Residential Construction Figure A-38: Boston Blue Line Typical Residential Construction

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.