Skip to main content

Currently Skimming:


Pages 156-157

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 156...
... 154 Technology, University of Arkansas, and Worcester Polytechnic Institute. The device is simply sealed to the pavement surface and water is introduced into a vertical standpipe.
From page 157...
... 155 proposed classification for the degree of clogging as related to permeability testing as shown in Table 85. Table 85: Classification of Degree of Clogging Degree of Clogging of Porous Asphalt Outflow Time (s)

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.