Skip to main content

Currently Skimming:


Pages 42-52

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 42...
... 32 APPENDIX A Survey Questionnaire TCRP Project J-7 Synthesis Topic SE-02 MAINTENANCE PRODUCTIVITY PRACTICES Questionnaire Name of property: Name(s) of respondents and title(s)
From page 43...
... 33 Please provide the following information for heavy-duty transit buses 30 feet or longer only. 1.0 Fleet Information SEE CHARTS ATTACHED AT END OF THIS QUESTIONNAIRE.
From page 44...
... 34 2.2.6 Is there a standard time used? Yes ___ No ___ If yes, provide the list of preventive maintenance programs with corresponding time.
From page 45...
... 35 2.4.1 Does your property have a formal plan for midlife and life-extending overhauls? Yes ___ No ___ Do the overhauls include standard time targets?
From page 46...
... 36 3.3 How many buses are based out of each shop? 3.4 Do you have a main shop?
From page 47...
... 37 If yes, please provide details of the programs. 5.6 Have they improved productivity and can it be quantified?
From page 48...
... 38 5.13 Have you compared your cost with any of your peers? Yes ___ No ___ If yes, were you able to reconcile the difference?
From page 49...
... 39 TCRP PROJECT J-7 TOPIC SE-02 Maintenance Productivity Practices Bus Manufacturer Model Number Number of Buses Delivery Date of Fleet Average Mileage/Bus or Total Fleet Mileage Average Operating Speed Fuel Type Bus Length -- 30 ft or longer only Standard or Low Floor Engine Manufacturer and Model Engine Horsepower Rating Additional comments regarding other equipment options that are capable of diagnostic testing.
From page 50...
... 40 TCRP PROJECT J-7 TOPIC SE-02 Maintenance Productivity Practices Bus Manufacturer Transmission Manufacturer and Model Number of Speeds Retarder -- Internal, External, or None Trans- mission Fluid Type Axles/Brakes Front Manufacturer/Type Axle/Brakes Center (if applicable) Manufacturer/Type Axles*
From page 51...
... 41 TCRP PROJECT J-7 TOPIC SE-02 Maintenance Productivity Practices Bus Manufacturer Number of Passenger Doors/ Width Electrical System Relays or Multiplex Manufacturer HVAC Manufacturer Model HVAC Controls Manual or Automatic HVAC -- Does It Have Electronic Diagnostic Capability Destination Sign/ Manufacturer Type Interior Electronic Signs/ Manufacturer/Type Automatic Voice Annunciation Manufacturer/Type Video Surveillance Cameras Manufacturer/Type Additional comments regarding other equipment options that are capable of diagnostic testing.
From page 52...
... 42 TCRP PROJECT J-7 TOPIC SE-02 Maintenance Productivity Practices Maintenance Information Bus Manufa cturer Front Axle Brakes -- Mileage to Reline Center (if applicable) Axles/Brakes Mileage to Reline Axles*

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.