Skip to main content

Currently Skimming:


Pages 91-100

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 91...
... 81 APPENDIX D Houston Metro -- Additional Information on Painting INCREASE PRODUCTIVITY IN THE BODY SHOP Time Standards We are looking at time standards for paint prep and bus painting. [See work orders for time standards.]
From page 92...
... 82 ASSEMBLY WORK -- STREET SIDE The following items are to be installed (new or reconditioned)
From page 93...
... 83 SANDING AND PREP WORK -- REAR The following items are to be removed before sanding 1. Door handles (A/C and engine door)
From page 94...
... 84 SANDING AND PREP WORK -- FRONT The following items are to be removed before sanding 1. Mirrors 1 Hr.
From page 97...
... 87 ASSEMBLY WORK -- REAR The following items are to be installed (new or reconditioned)
From page 98...
... 88 COMPLETE PAINT The following items are to be installed (new or reconditioned)
From page 99...
... 89 STANDING AND PREP WORK -- CURB SIDE The following items are to be removed before sanding 1. Marker lights (3)
From page 100...
... 90 NEW FLYER 40' TRANSIT BUS COMPLETE PAINT The total number of hours for this entire process is: 244.5 hours. This is not inclusive of any accident damage or corrosion control that may need to be performed, but is inclusive of all necessary parts (mirrors, wipers, handles, etc.)

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.