... 88 3D–4D Building Information Modeling, U.S. General Services Administration, Washington, D.C., 2006 [Online]
From page 89...
... 89 The Maine DOT's use of design-build on construction of the $25 million Portland Connector, which links the Outer Congress Street exit of Interstate 295 with West Commercial Street and Portland's working waterfront, enabled the project team to bring the roadway to completion nearly 2 years earlier than what would have been expected under traditional design-bid-build. Before road construction started, Shaw Bros.
From page 90...
... placed structure. New technology in maturity meters allows for embedded components to be used in lieu of external recording devices, making the use of these instruments more feasible on jobsites.
From page 91...
... 91 This is the result of (1) the high value of the road contracts, (2)
From page 92...
... This paper reports on the development of an integrated database to act as an information resource base for 4D/VR (virtual reality) construction process simulation.
From page 93...
... 93 work, which means lower costs. States that have already implemented similar automated contract management systems predict that the systems will save them several million dollars each year, according to MCI Systemhouse, which developed SiteManager under contract to AASHTO.
From page 94...
... Friedland, I., "From Vertical to Horizontal: Learning from the Innovations of the Building Construction Industry," FOCUS: Accelerating Infrastructure Innovations, Aug.
From page 95...
... 95 Powerpoint slideshow with screenshot images of SiteManager software application for personal digital assistant (PDA) and desktop.
From page 96...
... curriculum. The availability of mobile projection systems allow the instructor to set up course delivery in any location capable of reflecting the projector's output.
From page 97...
... 97 for use with each of the various applications of 4D CAD simulations. Finally, various lines of future research are highlighted, including the need for improved use of data exchange standards and the automation of linking the construction tasks to the 3D CAD model.
From page 98...
... The study described in this report assesses the reliability and potential benefit of using the concrete maturity method in very cold weather. Cold weather presents particular challenges for concrete construction including: (1)
From page 99...
... 99 tive decision making on construction scheduling and traffic planning. For the visualization of construction scheduling and traffic planning a 4D technology that makes use of a comprehensive 3D project database is proposed.
From page 100...
... Remote Sensing," Presented at ISPRS 2004: XXth ISPRS Congress, Istanbul, Turkey, July 12–23, 2004. Erosion control is one of the most important land development policies in Japan.
From page 101...
... 101 real-time communication, monitoring, and control in building construction. Such a website offers opportunities that go beyond what is in use today.
From page 102...
... Powers, M.B., "Contractors Scrambling to Master 3D Modeling Technologies," Constructor Magazine, 2005 [Online]
From page 103...
... 103 make it possible to view the physical evolution of the work, to follow the planned construction sequence, and to visualize details of the form of every component of the works. They also support the study of the type and method of operation of the equipment necessary for these construction procedures.
From page 104...
... Seddon, J., "Machine Control in Urban Environment," New Zealand Institute of Surveyors Survey Quarterly, Vol.
From page 105...
... 105 general contractor, and three subcontractors has jointly developed a common 3D model from the very start of the project to link with cost estimating and scheduling software. The electronic integration of design and cost information was accomplished through the CAD-estimate link developed by Ketiv and Timberline.
From page 106...
... savings. The synthesis summarizes the experiences of a variety of transit agencies, with information provided from small- and medium-sized transit operators, as well as from large transit agencies.
From page 107...
... 107 This study is an investigation of the feasibility of using an immersive, 3D virtual environment to view and generate 4D models to improve the construction project planning process. A group of construction professionals interactively reviewed and generated a construction plan for a portion of a nuclear power plant project in an Immersive Virtual Environment (IVE)