Skip to main content

Currently Skimming:


Pages 78-85

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 78...
... 78 ACY Atlantic City International Airport AMMS Airport Maintenance Management System AMP Asset Management Plan AMS Asset Management System API Airport Performance Indicator APTS Airport Planning and Technical Services BI Business Intelligence BIM Building Information Modeling CM Corrective Maintenance CMMS Computerized Maintenance Management System COO Chief Operations Officer EAM Enterprise Asset Management EWR Newark Liberty International Airport FMEA Failure Modes Effects Analysis GA General Aviation GCDWR Gwinnett County Department of Water Resources GIS Geographic Information System GTAA Greater Toronto Airports Authority HVAC Heating, Ventilation, and Air Conditioning ID Identification ISO International Organization for Standardization IT Information Technology JFK John F Kennedy International Airport KPI Key Performance Indicator LCC Life Cycle Costing LEED Leadership in Energy and Environmental Design LGA LaGuardia Airport LOS Level(s)
From page 79...
... Abbreviations 79 RCM Reliability-Centered Maintenance ROI Return on Investment RTF Run-to-Failure SCADA Supervisory Control and Data Acquisition SEA Seattle-Tacoma International Airport SLC Salt Lake City International Airport SMART Specific, Measurable, Attainable, Realistic, and Timely SWF Stewart International Airport TEB Teterboro Airport YYZ Toronto Pearson International Airport
From page 80...
... 80 A Airport property. All property owned by the airport, whether purchased, leased, confiscated, donated, received by eminent domain, constructed, or annexed.
From page 81...
... Glossary 81 Asset management (AM)
From page 82...
... 82 Guidebook for Advanced Computerized Maintenance Management System Integration at Airports B Backlog. All work that has not been completed by its specified "required by" date.
From page 83...
... Glossary 83 environment. Alternatively, a construction may be a constructed facility that is not a building (e.g., a bridge, road, or railway)
From page 84...
... 84 Guidebook for Advanced Computerized Maintenance Management System Integration at Airports Failure analysis. The process of analyzing a failure to determine its cause and to put measures in place to prevent future problems.
From page 85...
... Glossary 85 J Job. A work assignment, task, or series of related tasks, position classification, or quantity of work.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.