Skip to main content

Currently Skimming:


Pages 355-393

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 356...
... C-i CONTENTS Requirements for Electronic Data to be Supplied to Construction (Draft Proposal) , AASHTO Technology Implementation Group (06/04/2007)
From page 357...
... C-ii Department of Transportation (June 19, 2008) .......................................................................119 Automated Machine Guidance – Special Provisions Draft, North Carolina Department of Transportation (June 17, 2008)
From page 358...
... C-1 Requirements for Electronic Data to be Supplied to Construction (Draft Proposal) , AASHTO Technology Implementation Group (06/04/2007)
From page 359...
... C-4 Machine Control Grading – Special Provisions 5-1.26, District 11, California Department of Transportation (2007)
From page 360...
... C-5 5-1.__ MACHINE CONTROL GRADING The Contractor may utilize grading equipment controlled with a Global Positioning System (GPS) machine control grading system for the grading and construction of the roadway, except for final grading.
From page 361...
... C-6 Guidelines for Implementing Automated Machine Guidance, California Department of Transportation (June 30, 2009) http://www.dot.ca.gov/hq/row/landsurveys/SurveysManual/AutomatedMachineGuidanceGuideli nes7_5_09.pdf
From page 362...
... C-15 Implementation of Automated Machine Guidance for Ongoing Projects (Memorandum) California Department of Transportation (November 2013)
From page 363...
... C-18 Survey Control of Grading by GPS or RTS Methods – Revision of Section 625, Pilot Project Special Provision, Colorado Department of Transportation (November 03, 2008) http://www.coloradodot.info/business/manuals/survey/chapter6/chapter6appendix/Revision%20625%20Machine%20Control.doc/view
From page 364...
... Pilot project special provision: 625gpsrts 11.3.2008 REVISION OF SECTION 625 SURVEY CONTROL OF GRADING BY GPS OR RTS METHODS C-19 Section 625 of the Standard specifications is hereby revised for this project as follows: Subsection 625.01 shall include the following: The Contractor may use grading equipment controlled by Global Positioning System (GPS) machine control grading techniques or Robotic Total Station (RTS)
From page 365...
... Pilot project special provision: 625gpsrts 11.3.2008 REVISION OF SECTION 625 SURVEY CONTROL OF GRADING BY GPS OR RTS METHODS C-20 The Contractor shall provide stakes at all alignment control points, at every 500 foot stationing, and where required for coordination activities involving environmental agencies and utility companies at the Contractor's expense. At least one week prior to the Preconstruction conference, the Contractor shall submit to the Engineer, for review, a written GPS or RTS machine control grading work plan which shall include: (1)
From page 366...
... Pilot project special provision: 625gpsrts 11.3.2008 REVISION OF SECTION 625 SURVEY CONTROL OF GRADING BY GPS OR RTS METHODS C-21 Include this special provision on projects on which a digital terrain model (DTM) has been developed for all or part of the work and the Contractor will be allowed to use Global Positioning System (GPS)
From page 367...
... C-22 Design Guidance Memorandum (DGM) 1-19 Machine Control, Delaware Department of Transportation (July 30, 2007)
From page 368...
... C-25 Draft specification for Machine Control – Section 763637, Delaware Department of Transportation (March 23, 2009) http://www.efl.fhwa.dot.gov/files/technology/3d-modeling/DelDOT-Machine-Control-Spec.pdf
From page 369...
... C-26 763637- Machine Control Grading Description: This specification contains the requirements for grading operations utilizing Global Positioning Systems (GPS)
From page 370...
... C-27 3. The Department will provide data in an electronic format to the Contractor.
From page 371...
... C-28 B Contractor's Responsibites 1.
From page 372...
... C-29 Construction Engineering and item 763637 - Construction Engineering (GPS) Machine Control Grading shall follow and be paid for under item 763597 -Utility Construction Engineering.
From page 373...
... C-30 Contract Control Plan: The Contractor shall develop and submit a Contract Control Plan for all contracts which include item 763637 Construction Engineering (GPS) Machine Control Grading.
From page 374...
... C-31 Method of Measurement No measurement. Basis of Payment No payment.
From page 375...
... C-32 Draft specification for Allowing "Stakeless Excavation" on a Highway Contract – Section 105.08 Construction Stakes, Lines, and Grades, Indiana Department of Transportation http://www.in.gov/dot/div/contracts/standards/book/sep13/2014Master.pdf
From page 376...
... C-36 Developmental Specifications for Global Positioning System Machine Control Grading DS01103, Iowa Department of Transportation (Effective Date September 18, 2007) http://jjhannon.com/NCHRP/IOWA_DS-01103.pdf
From page 377...
... C-41 Special provisions for slipform paving system machine control SP-010391, Iowa Department of Transportation (April 21, 2009)
From page 378...
... C-46 Developmental Specifications for PCC Paving 3-D Machine Control DS-12025 (NEW) , Iowa Department of Transportation (Effective Date October 16, 2012)
From page 379...
... C-49 Part III Technical Requirements, Section 107 Construction Stakeout Standard Specifications for Construction and Materials, Maryland State Highway Administration (July 2008) http://www.marylandroads.com/ohd/part3.pdf
From page 380...
... C-54 Special Provision for Group 3: Digital Terrain Model/Digital Elevation Model Products and Services, Minnesota Department of Transportation (July 01, 2001) http://www.dot.state.mn.us/surveying/pdf/photospecs/digter/DIGITAL_TERRAIN_MODEL_C OMPILATION_fine_JUL_2001.pdf
From page 381...
... C-59 Special Provision for Automated Machine Guidance Systems SP 907-699-1, Mississippi Department of Transportation (August 24, 2010) http://sp.mdot.ms.gov/Contract%20Administration/DesignBuild/PROPOSED%20IMPROVEME NTS%20TO%20INTERSTATE%2055/RFP%20I-55%20Pike%20and%20Lincoln.pdf
From page 382...
... C-64 Specifications of Computer Deliverable Contract Plans, Missouri Department of Transportation (June 01, 2009) http://www.missouriruralpublictransportation.org/business/documents/ComputerDeliverableCont ractPlans060109.pdf
From page 383...
... C-70 Waiver of Liability, ROW\Forms\Utl\909, Montana Department of Transportation (Revised November 2009) https://www.mdt.mt.gov/other/rw/external/forms/909.pdf
From page 384...
... C-72 Preparation and transfer of electronic engineering data (engineering bulletin EB 05-023) , New York State Department of Transportation (April 05, 2005)
From page 385...
... C-81 Engineering Instruction 06-007: Revision to Standard Specifications: Section 105-10, Survey and Stakeout; Section 625, Survey Operations, Row Markers & Permanent Survey Markers (engineering instruction 06-007) , New York State Department of Transportation (April 03, 2006)
From page 386...
... C-92 Survey Operations, Row and Survey Markers, and GPS Inspection Units –Revision to Standard Specifications Section 625 (EI 08-03X) , New York State Department of Transportation (May 07, 2009)
From page 387...
... C-119 Automated Machine Guidance – Special Provisions for Contract 201918 (R-2606B) Addendum 3: "US 311 Bypass from north of Spencer Road (SR 1929)
From page 388...
... C-136 Automated Machine Guidance – Special Provisions Draft, North Carolina Department of Transportation (June 17, 2008) https://connect.ncdot.gov/letting/design%20build%20program/r2123ce/rfp%20industry%20draft.pdf
From page 389...
... C-139 Machine Control Grading Section 1-05.9 Draft Specification, Machine Control Project Delivery Memorandum # 08-01, Washington State Department of Transportation (April 07, 2008) http://www.wsdot.wa.gov/publications/fulltext/ProjectDev/ProjectDeliveryMemos/Memo0801.pdf
From page 390...
... C-148 Construction Layout Stakes for Electronic Data, West Virginia Department of Transportation (2010) http://www.transportation.wv.gov/highways/contractadmin/specifications/SpecComit/SpecMeeti ngs/specmeetyear/2011/Documents/20110214_PDFs/639_20101207_dd_639.3ConstructionLayo utElectronicMethod_SProj_1.pdf
From page 391...
... C-152 Construction Staking Subgrade, Item 650.4500 (Special Provision) , Wisconsin State Department of Transportation http://roadwaystandards.dot.wi.gov/standards/stndspec/ss-06-50.pdf#ss650
From page 392...
... C-156 CMM 7.18 GPS Machine Guidance, Wisconsin State Department of Transportation http://roadwaystandards.dot.wi.gov/standards/cmm/cm-07-18.pdf
From page 393...
... C-160 Real Time Kinematic (RTK) GPS Specification, Wyoming Department of Transportation http://www.dot.state.wy.us/files/live/sites/wydot/files/shared/Construction/2015%20Construction %20Manual/2015%20Construction%20Manual.pdf

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.