Skip to main content

Currently Skimming:


Pages 6-12

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 6...
... 6 2.1 Summary of the State of the Practice Because of the 1967 collapse of the Silver Bridge, AASHTO published the first fracture control plan (FCP) for steel bridges in 1978 (AASHTO 1978, Lichtenstein 1993)
From page 7...
... 7 2.1.1 Current Mandates and Specifications for FCMs The NBIS, which are part of the CFR, establish a base inspection interval of 24 months, extendable to 48 months through approval of FHWA for routine inspections. Some bridges may require shorter inspection intervals because of corrosion, traffic, and so on.
From page 8...
... 8 • The Hoan Bridge carrying I-794 over the Milwaukee River in Milwaukee, Wisconsin, underwent failure of two girders in a continuous three-span, three-plate girder bridge in 2000 (Connor and Fisher 2002, Fisher et al.
From page 9...
... 9 • Goto et al.
From page 10...
... 10 where lR and lQ are the biases of resistance and load, VR and VQ are the coefficients of variation of resistance and load, and k is a scalar that increases with the target reliability level and is uniformly applied to both the load and resistance factors. The reliability principles used in the calibration of the AASHTO LRFD BDS have been employed to develop procedures for the assessment of redundant capacity (AASHTO 2014)
From page 11...
... 11 was developed) , finite element models of existing bridges were developed to calculate the dynamic amplification factors after the failure of a primary steel tension member.
From page 12...
... 12 (Cha et al. 2014, Digglemann 2012, Digglemann et al.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.