Skip to main content

Bridge Demolition Practices (2019) / Chapter Skim
Currently Skimming:


Pages 1-2

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 1...
... 1 The objective of this synthesis was to document practices used by bridge owners to manage and administer bridge demolition in construction projects. Each year there are numerous bridges partially demolished or totally demolished as part of rehabilitation or replacement.
From page 2...
... 2 Bridge Demolition Practices structures are removed and salvaged, when removal is over or adjacent to public traffic or railroad property, or if removal is specified in the contract documents. Requirements for drawing content, however, are not provided.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.