... 114 Once an airport has established a BIM program, it is important for the airport to measure the effectiveness of the program to guide future corrective actions and improvements. This section identifies metrics that provide an airport with the data it needs to ensure that BIM is achieving established goals.
From page 115...
... BIM Controls -- Progress Metrics 115 equipment's location. Regardless, BIM will increase the wrench time percentage; however, the measured effect will be less if travel time is not considered a part of wrench time.
From page 116...
... 116 BIM Beyond Design Guidebook assets for inventory time consuming and can potentially enable mistakes due to a lack of precise asset locations. An example is when multiple assets of the same type near one another are being inventoried.
From page 117...
... BIM Controls -- Progress Metrics 117 11.5 Summary BIM is a complex process that provides tangible and intangible benefits across an airport organization. To efficiently manage the implementation of BIM and to maximize the realized benefits to an airport, it is vital to establish a program of BIM metrics.