... C-1 A P P E N D I X C FAA Minimum BIM Requirements
From page 182...
... C-2 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 Minimum Building Information Modeling (BIM) Requirements Introduction: The following Building Information Modeling (BIM)
From page 183...
... FAA Minimum BIM Requirements C-3 A/E Scope of work TUS-ACT February 2012 Section 2 – Design Requirements 2.1 Drawings. The use of BIM does not negate the need for delivery of CAD files used for the creationof the construction contract drawings.
From page 184...
... C-4 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 2.2.3.2 The PxP shall describe uses of BIM during design and construction phases to include value management, interference management, and design-change tracking, or such other uses as the A/E proposes. 2.2.3.3 The PxP shall identify how the Model data shall be managed and interoperate (data storage, sharing, viewing, quality control parameters in Section 2.3 Quality Control, and updating, as necessary)
From page 185...
... FAA Minimum BIM Requirements C-5 A/E Scope of work TUS-ACT February 2012 Samples can be obtained from the DoD-MHS BIM website, currently http://www.buildingsmartalliance.org/index.php/projects/activeprojects/162 2.2.4.2 Model Content. The Model shall include, at a minimum, the requirements of Section 4.
From page 186...
... C-6 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 2.3.3 Other Parameters. Develop such other QC parameters as A/E deems appropriate for the Project and provide to the FAA for concurrence.
From page 187...
... FAA Minimum BIM Requirements C-7 A/E Scope of work TUS-ACT February 2012 Section 3 – Submittal Requirements 3.1 General Submittal Requirements. - Provide submittals in compliance with the A/E SOW deliverables and as described hereinafter.
From page 188...
... C-8 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 Section 4 – BIM Model Minimum Requirements and Output 4.1 General Provisions. The Model shall be developed to include the systems described below as they would be built.
From page 189...
... FAA Minimum BIM Requirements C-9 A/E Scope of work TUS-ACT February 2012 contact the FAA for consideration of 2D representation. The FFE systems Model may vary in level of detail for individual elements, but at a minimum must include all features that would be included on a quarter inch (1/4"=1'0")
From page 190...
... C-10 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 4.5 Mechanical. The mechanical systems Model may vary in level of detail for individual elements, but at a minimum must include all features that would be included on a quarter inch (1/4"=1'0")
From page 191...
... FAA Minimum BIM Requirements C-11 A/E Scope of work TUS-ACT February 2012 4.7 Fire Protection. The fire protection system Model may vary in level of detail for individual elements, but at a minimum must include all features that would be included on a quarter inch (1/4"=1'0")
From page 192...
... C-12 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 Section 6 – A/E Electives 6.1 Applicable Criteria. The A/E may elect to submit one or more of the following features as a separate cost line item in its contract proposal.
From page 193...
... FAA Minimum BIM Requirements C-13 A/E Scope of work TUS-ACT February 2012 supplementary physical entities that are not shown graphically in the Model, such as insulation around a duct, or hardware on a door. "Workspace": A collection of content libraries and supporting files that define and embody a BIM standard.
From page 194...
... C-14 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 Tables The following tables reflect data element requirements, naming convention to be used for the various data elements, format restrictions, responsibility and data element responsible authority. The note references apply to the following tables.
From page 195...
... FAA Minimum BIM Requirements C-15 A/E Scope of work TUS-ACT February 2012 Table 1. Project Level Parameters Parameter Name Description Type Characters Responsible Authority CD_Design_F Calendar days total for design at completion of design Integer Note 4 Const_Comp Date construction complete actual Date DD/MM/YYYY Note 1 Const_ContOff Design & Construction Agent and office responsible for design award (e.g.
From page 196...
... C-16 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 Table 1. Project Level Parameters Parameter Name Description Type Characters Responsible Authority Cost_Total_A Total construction cost for the project at contract award Number 0.00 Note 1 Cost_Total_F Total construction cost for the project at project completion Number 0.00 Note 1 Currency Currency used on project Text 25 Note 1 Currency_Rate Currency rate to USD for project Number 0.00 Note 1 Design_Comp Date that the design was completed, actual Date DD/MM/YYYY Note 4 Design_ContOff Design & Construction Agent and office responsible for design award (e.g.
From page 197...
... FAA Minimum BIM Requirements C-17 A/E Scope of work TUS-ACT February 2012 Parameter Name Table 2. Room Level Parameters Description Type Characters Responsible Authority Fire_Zone Fire Safety Zone - to allow color diagram development Text 10 Note 1 DMIS DMIS ID (as associated with room's department)
From page 198...
... C-18 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 Table 3. Associated Schedule Data from Project & Room Level Parameters Parameter Name Description Type Characters Responsible Authority DMIS Note 7 Floor_Number Floor number Text 15 Note 1, 5 Installation Note 7 RPUID Note 7 Total Items 4 Table 4.
From page 199...
... FAA Minimum BIM Requirements C-19 A/E Scope of work TUS-ACT February 2012 Table 4. Real Property Installed Equipment (RPIE)
From page 200...
... C-20 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 Table 4. Real Property Installed Equipment (RPIE)
From page 201...
... FAA Minimum BIM Requirements C-21 A/E Scope of work TUS-ACT February 2012 Table 7. Equipment and Furniture Object Parameters (as applicable to the specific piece of equipment)
From page 202...
... C-22 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 Table 7. Equipment and Furniture Object Parameters (as applicable to the specific piece of equipment)
From page 203...
... FAA Minimum BIM Requirements C-23 A/E Scope of work TUS-ACT February 2012 Matrix of Submittals & Schedules The following matrix represents a consolidated reference to submittal requirements defined in this document. The submittals are in concert with and do not replace the A/E Scope of Work (SOW)
From page 204...
... C-24 BIM Beyond Design Guidebook A/E Scope of work TUS-ACT February 2012 Acronyms List The following is a list of acronyms relevant to this BIM requirement document: Acronym Represents BHMA Builders Hardware Manufacturers Association (http://www.buildershardware.com/) BIM Building Information Model or Building Information Modeling CAEG Computer Aided Engineering Graphics CAFM Computer Aided Facility Management CMMS Computerized Maintenance Management System DMIS Defense Medical Information System for DoD-MHS DMLSS Defense Medical Logistics Standard Support for DoD-MHS DoD Department of Defense DTM Digital Terrain Model FAA Federal Aviation Administration FLCM Facility Life Cycle Management FM Facility Management or Facility Manager IFC Industry Foundation Class MEP Mechanical, Electrical and Plumbing MHS Military Health System http://www.bim4healthcare.org/ http://www.tricare.mil/ocfo/ppmd/guideplates.cfm#Tools-SEPS NAVFAC Naval Facilities Engineering Command NPS Nominal Pipe Size OmniClass OmniClass Construction Classification System – Open Source (http://www.omniclass.org/)

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.