... 45 Cost Forecasting Tool Kit 5.1 Introduction The Cost Forecasting Tool Kit consists of three spreadsheet-based tools designed to facilitate the implementation of both traditional and advanced cost forecasting methodologies: • Tool 1 is intended for state transportation agencies (STAs) that prefer to use standard inflation rates.
From page 46...
... 46 Improving Mid-Term, Intermediate, and Long-Range Cost Forecasting: Guidebook for State Transportation Agencies to better meet their needs and preferences. Each of the three tools included in the tool kit is presented in its own worksheet.
From page 47...
... Cost Forecasting Tool Kit 47 likely value, and (3) maximum possible value.
From page 48...
... 48 Improving Mid-Term, Intermediate, and Long-Range Cost Forecasting: Guidebook for State Transportation Agencies Figure 5-2. Tool 1: Forecast with inflation rate -- three-point estimate input.
From page 49...
... Input Description 1. Inflation rate Desired simple or compound inflation rate provided by the user.
From page 50...
... 50 Improving Mid-Term, Intermediate, and Long-Range Cost Forecasting: Guidebook for State Transportation Agencies Figure 5-4. Tool 2: Index-based forecast with MFE -- three-point estimate input.
From page 51...
... Cost Forecasting Tool Kit 51 Figure 5-5. Tool 3: Index-based forecast with regression analysis -- single-value input.
From page 52...
... 52 Improving Mid-Term, Intermediate, and Long-Range Cost Forecasting: Guidebook for State Transportation Agencies Figure 5-6. Tool 3: Index-based forecast with regression analysis -- three-point estimate input.
From page 53...
... Cost Forecasting Tool Kit 53 Input Description 1. Lookback period Number of years of index values to be considered for the intended cost forecasting process.