Skip to main content

Currently Skimming:


Pages 96-111

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 96...
... 96 State DOT Survey Questionnaire A P P E N D I X B
From page 97...
... State DOT Survey Questionnaire 97   Survey Overview Page description: Dear AASHTO Committee on Bridges and Structures Member: The Transportation Research Board (TRB) is preparing a synthesis on Design and Construction Practices for Durability, Ride, and Water Management of Bridge Approach Systems.
From page 98...
... 98 Practices for Bridge Approach Systems Page description: This page contains 10 questions on design and construction practices used by your agency for bridge approach systems. Never Rarely Previously, But Not Currently Occasionally Often Always Integral abutments Semi-integral abutments Stub abutments Mechanically-stabilized abutments Full-height, closed abutments Full-height, spill-through abutments Enter another option Enter another option Enter another option Comments 1.
From page 99...
... State DOT Survey Questionnaire 99   Included in: Thickness (inches) Length (feet)
From page 100...
... 100 Practices for Bridge Approach Systems Comments Comments Comments 5. If you use an approach slab, is a sleeper slab typically used to support it in your currently preferred design?
From page 101...
... State DOT Survey Questionnaire 101   Comments Comments 8. What material unique from the backfill is required to be placed behind the abutment backwall?
From page 102...
... 102 Practices for Bridge Approach Systems Comments Comments Comments 11. Is water runoff from the bridge deck and approach slab/pavement captured and redirected using surface drains such as gutters, flumes, and paved ditches?
From page 103...
... State DOT Survey Questionnaire 103   Location 1 Location 2 Either Location 1 or 2 (not specified) Both Locations 1 and 2 simultaneously No expansion joint is used Not applicable Integral abutments Semi-integral abutments Stub abutments Mechanically-stabilized abutments Full-height, closed abutments Full-height, spill-through abutments Enter another option Enter another option Enter another option Comments Comments 14.
From page 104...
... 104 Practices for Bridge Approach Systems Compression seals: Strip seals: Sealants used with backer rods: Other seals: Comments Comments 16. How often does your agency typically replace the seal of the joint adjacent to the approach slab/pavement?
From page 105...
... State DOT Survey Questionnaire 105   Comments Comments 18. Does your agency conduct periodic inspection of the following types of distress/deterioration?
From page 106...
... 106 Practices for Bridge Approach Systems Metric Main roadway: Approach slab/pavement: Bridge deck: Joints: Comments Comments 20. What metrics are used to assess ride quality of the main roadway, the approach slab/pavement, and the bridge deck, and across the joints between these sections?
From page 107...
... State DOT Survey Questionnaire 107   Comments Part 4: Performance Issues and Mitigation Practices Page description: This page contains 4 questions related to performance issues and mitigation practices. Comments 22.
From page 108...
... 108 Practices for Bridge Approach Systems Common Issues Rarely Occasionally Often Poor ride quality (bump) between approach slab/pavement and abutment or bridge deck Poor ride quality across approach slab/pavement Poor ride quality between approach slab/pavement and main roadway Failed sealant in expansion joints Failed sealant in other joints between approach slab/pavement and traffic barriers, wing walls, etc.
From page 109...
... State DOT Survey Questionnaire 109   Mitigation Practices Poor ride quality (bump) between approach slab/pavement and abutment or bridge deck Poor ride quality across approach slab/pavement Poor ride quality between approach slab/pavement and main pavement Failed sealant in expansion joint Failed sealant in other joints between approach slab/pavement and traffic barrier, wing walls, etc.
From page 110...
... 110 Practices for Bridge Approach Systems Comments Review and Follow-Up Comments If you wish to share any additional comments, experiences, or details, please contact Dr. Mohamed ElBatanouny at melbatanouny@wje.com.
From page 111...
... State DOT Survey Questionnaire 111   Thank You! Thank you for taking this survey.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.