Skip to main content

Currently Skimming:


Pages 41-44

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 41...
... 41   The primary objective of this synthesis was to document current state DOT practice for delivering 3D digital models to highway contractors and the use of these models as part of the legal construction documents. This overarching objective was accomplished by gathering data from (1)
From page 42...
... 42 3D Digital Models as Highway Construction Contract Documents and inspection staff (67%) , the need to understand the construction liabilities associated with using 3D digital models as contract documents (67%)
From page 43...
... Summary of Findings 43   • DOTs that use 3D digital models as contract documents use them for AMG (100%) and visualization and communication purposes (100%)
From page 44...
... 44 3D Digital Models as Highway Construction Contract Documents • Sixty percent of DOTs do not have a QC checklist for the 3D digital models that are used as contract documents (Figure 3-30, n = 5)

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.