... 59   A P P E N D I X A Survey Questionnaire
From page 60...
... 60 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery Email to Potential Participants From: Gabriel B Dadi, Ph.D., PE To: Members of AASHTO Standing Committee on Construction (COC)
From page 61...
... Survey Questionnaire 61   ADC Survey Questionnaire NCHRP SYNTHESIS 20-05/52-19, "TECHNOLOGICAL CAPABILITIES OF DOTs FOR DIGITAL PROJECT MANAGEMENT AND DELIVERY QUESTIONNAIRE" Dear AASHTO Committee on Construction (COC) voting member, The Transportation Research Board (TRB)
From page 62...
... 62 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery 4. Phone Number: ________________________________________________________________ 5.
From page 63...
... Survey Questionnaire 63   Pilot Experience (i.e. tested on a small scale, used on a few projects)
From page 64...
... 64 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery Intelligent Compaction (IC) or Thermal Profiling (IR)
From page 65...
... Survey Questionnaire 65   0-3 Years (1) 4-7 Years (2)
From page 66...
... 66 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery Intelligent Compaction (IC) or Thermal Profiling (IR)
From page 67...
... Survey Questionnaire 67   Used internally with the DOT (1) Used also for external project stakeholders on documents (2)
From page 68...
... 68 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery PDF tickets created by scanning (1) e-tickets created automatically upon material batching (2)
From page 69...
... Survey Questionnaire 69   Smart phones/Tablets used only (1) GPS Rovers/Data Collectors also used (2)
From page 70...
... 70 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery AMG used on trial basis, along with the traditional method as the controlling method, on a few projects (1) AMG used as specified method on some projects (2)
From page 71...
... Survey Questionnaire 71   10. How is digital data shared with stakeholders?
From page 72...
... 72 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery Mobile devices for inspection & acceptance (e.g. GPS/ GNSS rovers, tablets)
From page 73...
... Survey Questionnaire 73   12. How is digital project data retained?
From page 74...
... 74 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery Construction administration software (e.g. AASHTOWare Project Construction & Materials)
From page 75...
... Survey Questionnaire 75   13. What benefits of advanced digital construction does your agency perceive exist, or have quantified and realized (i.e.
From page 76...
... 76 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery Increased project safety (14) o o o o Other (15)
From page 77...
... Survey Questionnaire 77   ▢Incompatibility with existing hardware (12) ▢Incompatibility with existing software (13)
From page 78...
... 78 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery e-Ticketing (8) o o o o Electronic construction document management system (e.g.
From page 79...
... Survey Questionnaire 79   16. What is included in the written language of your DOT's policy manual(s)
From page 80...
... 80 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery 17. Who controls the digital project data during construction (in regard to storage, access, visualizing, etc.)
From page 81...
... Survey Questionnaire 81   • New highways; major relocations • New interchanges • Capacity adding/major widening • Major reconstruction (4R; 3R with multiphase traffic control) • Congestion management studies are required • Environmental Impact Statement or complex Environmental Assessment required • 3R and 4R projects which do not add capacity • Minor roadway relocations • Non-complex bridge replacements with minor roadway approach work • Categorical Exclusion or non-complex Environmental Assessment required • Maintenance betterment projects • Overlay projects, simple widening without right-of-way (or very minimum right-of-way take)
From page 82...
... 82 Technological Capabilities of Departments of Transportation for Digital Project Management and Delivery 19. What types of projects have you used at least one ADC technology for?