Appendix A: Survey Questionnaire
Pages 82-89

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 82...
... Formal construction stormwater management program, separate from project management Construction stormwater management is part of the project management process. Both options above are used depending on the project scope and size.
From page 83...
... Bonded fiber matrix Check dams (rock, sandbag, socks, rolls, silt fence, tubes, etc.) Construction de-watering Diversion berms/dikes Drainage swales/ditches Dust control Erosion control blankets (channel, slope, etc.)
From page 84...
... Other chemical treatments Outlet protection Pipe slope drains Preserve existing vegetation Riprap Sediment basin Sediment trap Silt fence/barrier Sodding Stabilized construction entrances/exits Subsurface drains Surface roughening (tracking, stair-step grading, grooving, etc.) Temporary stream crossing Turbidity barrier (staked, floating, etc.)
From page 85...
... State DOT Contractor Consultants Monitor and track control measures Design guidance development Inspections Inspection deficiency remediation Installation Maintenance Reporting Training project personnel Violation remediation 12. On average, what percentage of construction stormwater management inspections are conducted by consultants at your DOT?
From page 86...
... Using performance metrics Review of control measures in place Inspection of control measures in place Regular site investigations Internal audits Audits performed by consultants Other, please specify: ____________________ 17. What performance metrics are used by your DOT to track construction stormwater management requirements?
From page 87...
... Design guidelines for construction stormwater management at your DOT are based on (select all that apply) : DOT guidelines Federal guidelines General construction practices Rules of thumb/current practices Scientific research State regulator guidelines Other, please specify: _________________________
From page 88...
... How often, on average, does your DOT update guidelines for construction stormwater management? Annually 2-3 years 4-5 years 6-7 years 8-9 years 10 years or more As needed When revisions to federal and state permit and regulatory requirements occur Other, please specify: ________________ CONSTRUCTION STORMWATER MANAGEMENT PROGRAM AUDITS 23.
From page 89...
... Example documents include manuals, guides, reports, plans, checklists, approved control measures, inspection processes, violation remediation approaches, etc., related to construction stormwater management, control measures, and associated information. (Upload function will be enabled for this question.)