... This report is the National Research Council assessment of ISS program efforts to protect the space station from meteoroids and debris. Both the overall ISS risk management process (which primarily addresses cost and schedule risks to the program)
From page 2...
... The ISS program should initiate an accelerated shield testing program to ensure that the currently planned shield designs are effective against the expected threat and to aid in the design of future shields. Increased emphasis should be placed on the lower velocity regimes and on gaining a better understanding of secondary ejecta.
From page 3...
... As part of this effort, NASA should intensify its work with the Russian Space Agency to identify and resolve differences in damage control hardware and procedures. The program also needs to study the failure modes of shielded pressure walls and to assess the capability of the ISS to continue safe operations with damaged wiring, piping, and other systems.