From page 129...
... CMemorandum of Understanding Between the United States National Aeronautics and Space Administration and the European Space Agency for the International Solar Polar Mission, March 29, 1979 129
From page 130...
... The primary objectives of the scientific mission will be to investigate, at the various solar latitudes out of the ecliptic plane of the solar system, the properties of the solar corona, the solar wind, the structure of the Sun-wind interface, the heliospheric magnetic field, solar and non-solar cosmic rays, and the interstellar/interplanetary neutral gas and dust. Secondary objectives of the mission include interplanetary physics investigations during the initial Earth-Jupiter phase, when the separation of the two spacecraft will be approximately 0.01 astronomical unit, and measurements of the Jovian magnetosphere during the Jupiter flyby phase.
From page 131...
... conduct, as appropriate with ESA prior to launch, radio frequency data tests to ensure compatibility of the HASA spacecraft with the ground network interface, with the Deep Space Networ k, and we th the Track ing and Data Relay Satell i te System, if support is required by the project; ~ f ~ mate and test the two spacecraf t for launch, jointly w$ th ESA; 131
From page 132...
... provide tracking and data acquisition support by the NASA Deep Space Network stations; (k) provide control center facilities and personnel during the mission lifetime, and accommodate ESA control center personnel as mutually agreed; (~)
From page 133...
... This document will contain interface requirements, references to necessary documentation and software, delivery schedules, mated or joint test plans, and such other technical information as the Project Managers deem to be necessary, (3) The Project Managers will also decide all issues where this Memorandum of Understanding saris for mutual agreement.
From page 134...
... Such reviews will be conducted by each Agency for its respective spacecraft with agreed representation from the other Agency. The final flight readiness review of the two mated spacecraf t will be conducted by a joint panel with co-chairmen designated by the NASA Associate Administrator for Space Science and the ESA Director of Scientif to Programs.
From page 135...
... Arrangements for provision of such data to Principal Investigators of ache theoretical and interdisciplinary investigations will be recommended by the- SWT for implementation by the JUG. Following the per iod of f irst publication rights, records or copies of reduced data will be deposited in the U
From page 136...
... NASA and ESA agree 'chat, with respect to in jury or damage to persons or property involved in STS operations undertaken pursuant deco this Memorandum of Understanding, neither NASA nor ESA, nor any person who has contracted winch ESA or NASA for STS services or owns property to be flown on the Shuttle, shal ~ make any claim with respect deco in jury to or
From page 137...
... Government for the practice of inventions covered by privately owned U.S. patents, either as royalties owed under an existing patent license inuring to the benefit of NASA or as judgment and litigation costs resulting from a suit for patent infringement in the U.S.
From page 138...
... Ad, ~SFlcO~/ f7577tle National'A/ronautics and Space Administration _ / Dat ~ / Date ~ APPENDIX C , - I' European Space Agency · ~ Jill ~ Date