Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
50 AASHTO Guide for Design-Build Procurement, American Association of State Highway and Transportation Officials, Washington, D.C., 2008, 204 pp. Abdelrahman, M., T. Zayed, and A. Elyamany, âBest Value Model Based on Project Specific Characteristics,â Journal of Construction Engineering and Management, Vol. 134, No. 3, 2008, pp. 179â188. Anderson, S.D. and J.S. Russell, NCHRP Report 451: Guide- lines for Warranty, Multi-Parameter, and Best Value Con- tracting, Transportation Research Board of the National Academies, Washington, D.C., 2001, 76 pp. Arizona Department of Transportation (ADOT), Initial Report for SEP (Special Experimental Project) 14 Construction Manager at Risk Contract, ADOT, Phoenix, Feb. 26, 2013, pp. 1â11. California Department of Transportation (Caltrans), Instruc- tions to Proposers, I-15/I-215 Interchange Improvements (Devore) Design-Build Project, Caltrans, Sacramento, April 17, 2012a, 102 pp. [Online]. Available: http:// www.dot.ca.gov/hq/oppd/designbuild/devore-index.htm [accessed Aug. 28, 2014]. California Department of Transportation (Caltrans), Proposal Evaluation, I-15/I-215 Interchange Improvements (Devore) Design-Build Project, Caltrans, Sacramento, Aug. 29, 2012b, 19 pp. Code of Federal Regulations (CFR), Part 636âDesign-build Contracting, Title 23, Volume 1, Part 636, 2011 [Online]. Available: http://www.gpo.gov/fdsys/pkg/CFR-2011- title23-vol1/pdf/CFR-2011-title23-vol1-part636.pdf [accessed July 23, 2014]. Federal Acquisition Regulation (FAR), U.S. Government Printing Office, Washington, D.C., 1996. Federal Highway Administration (FHWA), âProject Delivery Design-Build and Construction Manager/General Contrac- tor,â unpublished presentation, Everyday Counts Initia- tive, FHWA, U.S.DOT, Washington, D.C., 2012 [Online]. Available: https://www.fhwa.dot.gov/everydaycounts/pdfs/ summits/apdm/DesignBuild_CMGC_presentation.pdf [accessed June 9, 2014]. Florida Department of Transportation (FDOT), Design Build Guidelines, FDOT, Tallahassee, 2012, 110 pp. [Online]. Available: http://www.dot.state.fl.us/construction/design build/DBRules/DesignBuildGuidelines.pdf [accessed Aug. 27, 2014]. Foglietta, J.A., âProcedures for Selection and Award of Con- struction Contracts Using Best Value Selection,â Alter- native Contacting SEP-14 Request for Sprain Brook Parkway over Route 119, New York State Department of Transportation, Albany, 2012, pp. 1â29. Georgia Department of Transportation (GDOT), Design Build Guidebook, GDOT, Atlanta, 2014, 94 pp. [Online]. Available: http://www.dot.ga.gov/doingbusiness/Policies Manuals/roads/DesignBuild/001-GDOT_Design-Build_ Manual.pdf [accessed May 25, 2014]. Gransberg, D.D. and M.A. Ellicott, âBest-Value Contracting: Breaking the Low Bid Paradigm,â AACE Transactions, 1996. Gransberg, D.D. and S. Senadheera, âDesign-Build Contract Award Methods for Transportation Projects,â Journal of Transportation Engineering, Vol. 125, No. 6, 1999, pp. 565â567. Gransberg, D.D. and J. Shane, NCHRP Synthesis 402: Con- struction Manager-at-Risk Project Delivery for Highway Programs, Transportation Research Board of the National Academies, Washington, D.C., 2010, 137 pp. Gransberg, D.D. and J.S. Shane, âDefining Best Value for Construction Manager/General Contractor Projects: The CMGC Learning Curve,â Journal of Management in Engineering, 2014. Hilger, P.A., âBest Value Procurement: Lessons Learned, A Review of Best Practices in Minnesota: 2008â2009,â 2009, 124 pp. Holsti, O.R., Content Analysis for the Social Sciences and Humanities, AddisonâWesley Publishing, Reading, Mass., 1969, 235 pp. Michigan Department of Transportation (MDOT), Instructions to Proposers, M-21 over I-75 Bridge Replacement Project, MDOT, Lansing, 2008, 32 pp. Michigan Department of Transportation (MDOT), Best Value Performance Based Contracting, M-39 (Southfield Free- way), Final Report, MDOT, Lansing, 2012, 107 pp. Michigan Department of Transportation (MDOT), Innovative Construction Contracting Guide, MDOT, Lansing, 2013, 169 pp. [Online]. Available: http://www.michigan.gov/ documents/mdot/Innovative_Construction_Contracting_ 340000_7.pdf?20140831022203 [accessed July 21, 2014]. Minnesota Department of Transportation (MnDOT), Design- Build Manual, MnDOT, St. Paul, 2011, 188 pp. [Online]. Available: http://www.dot.state.mn.us/designbuild/manual. html [accessed Aug. 29, 2014]. Minnesota Department of Transportation (MnDOT), Industry Outreach Report for Design Build Program, MnDOT, St. Paul, 2012, 188 pp. [Online]. Available: http://www.dot. state.mn.us/designbuild/documents/PBFinalReport.pdf [accessed Aug. 29, 2014]. Minnesota Department of Transportation (MnDOT), Best Value Procurement Manual, MnDOT, St. Paul, 2013, 57 pp. [Online]. Available: http://www.dot.state.mn.us/ const/tools/docs/BestValueGuide-FinalMarch2013.pdf [accessed May 25, 2014]. Minnesota Department of Transportation (MnDOT), Technical Proposal, TH 2 Crookston Slope Stability Design-Build Project, MnDOT, St. Paul, Mar. 12, 2014, 40 pp. REFERENCES
51 Molenaar, K.R. and D.E. Johnson, âEngineering the Pro- curement Phase to Achieve Best Value,â Leadership and Management in Engineering, Vol. 3, No. 3, 2003, pp. 137â141. Montana Department of Transportation (MDT), Defining Best Value, MDOT, Helena, 2005, 5 pp. [Online]. Available: http://architecture.mt.gov/content/designconstruction/ docs/Best_Value_Definition.pdf [accessed May 21, 2014]. Neuendorf, K.A., The Content Analysis Guidebook, SAGE Publications, Inc., Chicago, Ill., 2002, 320 pp. New Hampshire Department of Transportation (NHDOT), Instructions to Proposers: Memorial Bridge Replacement Project Request for Proposals, Design Build Contract, NHDOT, Portsmouth, NHâKittery, Maine, 2011, 43 pp. New York State Department of Transportation (NYSDOT), Design Build Procedures Manual, NYSDOT, Buffalo, 2011, 251 pp. [Online]. Available: https://www.dot.ny.gov/ divisions/engineering/design/dqab/dqab-repository/ 2011%20Design%20Build%20Manual%20%20Volume1 %20of%205.pdf [accessed May 29, 2014]. New York State Department of Transportation (NYSDOT), Instructions to Proposers, Tappan Zee Hudson River Cross- ing Project, NYSDOT, Albany, 2012, 231 pp. [Online]. Available: http://www.newnybridge.com/documents/ bidprocess/index.html [accessed Aug. 29, 2014]. New York State Department of Transportation (NYSDOT), Initial Report for SEP (Special Experimental Project) 14 Construction Manager at Risk Contract, NYSDOT, Albany, Feb. 26, 2013, pp. 1â11. New York State Thruway Authority, Blue Ribbon Selection Committee Report, Tappan Zee Hudson River Crossing, Thruway Authority, 2012, 23 pp. [Online]. Available: http://www.newnybridge.com/documents/brsc-report.pdf [accessed Aug. 25, 2014]. Oregon Department of Transportation (ODOT), Design Build Manual, ODOT, Salem, 2006, 638 pp. Oregon Department of Transportation (ODOT), CMGC Procurement Manual, ODOT, Salem, 2008, 43 pp. Oregon Department of Transportation (ODOT), Instructions to Proposers, The I-5: Willamette River Bridge, ODOT, Salem, 2008, 38 pp. [Online]. Available: http://www. oregon.gov/ODOT/HWY/MPB/Pages/WRB.aspx#CM_ GC_CONTRACTS_AWARDED [accessed Aug. 29, 2014]. Parvin, C., âDesign-build: Evaluation and Award,â Roads and Bridges, Vol. 38, No. 12, 2000, 12 pp. Scott, S., K.R. Molenaar, D.D. Gransberg, and N.C. Smith, NCHRP Report 561: Best Value Procurement Methods for Highway Construction Projects, Transportation Research Board of the National Academies, Washington, D.C., 2006, 213 pp. Utah Department of Transportation (UDOT), Instructions to Proposers Template, UDOT, Salt Lake City, 2012, 476 pp. Available: https://www.udot.utah.gov/main/uconowner. gf?n=3002026652956406 [accessed Aug. 29, 2014]. Virginia Department of Transportation (VDOT), Design Build Procurement Manual, VDOT, Richmond, 2011, 25 pp. [Online]. Available: http://www.virginiadot.org/business/ resources/ipd/DB_Manual_FinalCopy20111011.pdf [accessed July 23, 2014]. Yin, R.K., Case Study Research: Design and Methods, 4th ed., SAGE Publications, Inc., Thousand Oaks, Calif., 2009, 240 pp. Yu, W. and K. Wang, âBest Value or Lowest Bid? A Quanti- tative Perspective,â Journal of Construction Engineering and Management, Vol. 138, No. 1, 2012, pp. 128â134. Zhang, X., âPublic Clientsâ Best Value Perspectives of Pub- lic Private Partnerships in Infrastructure Development,â Journal of Construction Engineering and Management, Vol. 132, No. 2, 2006, pp. 107â114.