Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
APPENDIX C â CONCRETE GIRDER DATABASE C-1
C.1 Database of Existing Bridges Strand Legend: Tendon Types: LR = Low Relaxation SR = Stress Relieved C-2
C.2 Prestressed Concrete I-Beams and Bulb-Tâs C-3
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 18067 562 131â-0 ¼â 6 5â-3 ½â 3â-0 ½â 17 112.5 50-0.6â Gr. 270 LR 7.5 6.5 3.0 2.5 3.5 44.51 AL BT-54 Mod Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 50 Number of Harped Strands:20 CG from bottom at Midspan: 8.9â CG from Bottom at Support: 20.0â Debonded Strands: 2 Debonded Length: 60 inches CG from Bottom at 60â: 18.78â Strand Layout at Midspan Strand Layout at 60â from Support Strand Layout at Support Cross-Section C-4
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 8891 571 47â-2â 8.5 1@ 7â-10, 12@10â-8â 3â-4â 14 90 14-0.5â Gr. 270 LR 6.0 5.0 4.0 2.0 14.0 19.33 Beam Type 6 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 14 Number of Harped Strands: 2 CG from bottom at Midspan: 2.57â CG from Bottom at Support: 7.71â Strand Layout at Midspan Strand Layout at Support Cross-Section C-5
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 8832 570 43â-3â â 8.5 10 2â-4â 16 87.5 20-0.5â Gr. 270 LR 8.0 6.0 4.0 2.0 3.0 N/A 36â I Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 20 Number of Harped Strands: 0 CG from bottom at Midspan: 6.90â Strand Layout at Midspan Cross-Section Cross-Section Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhan g Width (ft) # of Girder s Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 12603 572 37â-8¾â 7.87 5 11â-5¾â 3â-6½â 4 90 14-0.6â Gr. 270 LR 7.25 5.5 4.0 2.0 4.0 N/A AASHTO Type II Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 14 Number of Harped Strands: 0 CG from bottom at Midspan: 8.00â Strand Layout at Midspan Cross-Section Cross-Section C-6
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 10740 575 78â-6½â 6.25 7 3â-10½â 6 90 32-0.5â Gr. 270 LR 6.0 5.4 3.0 3.0 N/A AASHTO Type III Strand Spacing: Horizontal: 2â Vertical: 2â (4â to top pair of strands) # of Strands: 32 Number of Harped Strands: 0 CG from bottom at 48â: 6.60â CG from bottom at 120â: 6.50â CG from bottom at 168â: 6.29â CG from bottom at Midspan: 6.00â @48â from left support @ 120â from left support @ 168â from left support Strand Layout at Midspan Cross-Section C-7
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 10269 0576 78â-0â 6.25 6â-8â 3â-4 ½â 7 90 28-0.5â Gr. 270 LR 6.0 5.0 3.3 3.0 6.0 28.75 AASHTO Type III Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 28 Number of Harped Strands: 6 CG from bottom at Midspan: 5.43â CG from Bottom at Support: 11.86â Strand Layout at Midspan Strand Layout at Support Cross-Section C-8
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 5624 0588 59â-4â â 9 7â-3â 2â-10â 21 109.9 20-0.5â Gr. 270 LR 6.0 4.5 4.0 2.0 3.0 24.15 Beam Type 4 Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 20 Number of Harped Strands: 8 CG from bottom at Midspan: 4.40â CG from Bottom at Support: 18.00â Strand Layout at Midspan Strand Layout at Support Cross-Section C-9
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 5794 0589 72â-0â 8.5 5â-10â 2â-9â 6 100.0 20-0.6â Gr. 270 LR 9.0 7.0 4.0 2.0 3.0 29.13 Beam Type 3 Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 20 Number of Harped Strands: 6 CG from bottom at Midspan: 4.40â CG from Bottom at Support: 12.80â Strand Layout at Midspan Strand Layout at Support Cross-Section C-10
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9378 0598 101â-10â 9 10â-5â 2â-7½â 5 90 40-0.5â Gr. 270 LR 6.0 5.1 4.0 2.0 2.0 41.17 Wisconsin 70â Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 40 Number of Harped Strands: 2 CG from bottom at Left Supportâ: 8.13â CG from bottom at 78â: 7.50â CG from bottom at 318â: 5.63â CG from bottom at Midspan: 4.40â @ left support @ 78â from left support @ 318â from left support Strand Layout at Midspan Cross-Section C-11
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 5884 0602 90â-0â 8.5 8â-2â 3â-1â 4 110.0 38-0.5â Gr. 270 LR 7.0 5.0 4.0 2.0 4.0 27.28 Beam Type 6 Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 38 Number of Harped Strands: 12 CG from bottom at Midspan: 5.26â CG from Bottom at Support: 17.26â Strand Layout at Midspan Strand Layout at Support Cross-Section C-12
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 8885 0603 90â-0â 8.5 10â-7â 3â-5½â 4 105.8 36-0.5â Gr. 270 LR 7.0 5.5 4.0 2.5 2.5 36.00 BT-63 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 36 Number of Harped Strands: 6 CG from bottom at Midspan: 4.72â CG from Bottom at Support: 13.39â Strand Layout at Midspan Strand Layout at Support Cross-Section C-13
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 8957 0604 98â-0â 8.5 8â-8â 3â-0â 5 90.0 26-0.6â Gr. 270 LR 8.0 6.4 4.0 2.0 4.0 39.67 Beam Type 6 Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 26 Number of Harped Strands: 8 CG from bottom at Midspan: 3.85â CG from Bottom at Support: 16.77â Strand Layout at Midspan Strand Layout at Support Cross-Section C-14
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 12596 0610 96â-9â â 7.875 11â-1â â 4â-0 7/16â 4 90 50-0.6â Gr. 270 LR 10.2 7.1 4.0 2.0 2.0 N/A AASHTO Type IV Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 50 Number of Harped Strands: 0 CG from bottom at Left Support to 102.36â: 12.55â CG from bottom at 133.86â: 12.09â CG from bottom at 157.48â: 11.67â CG from bottom at Midspan: 11.36â @ left support @ 102.36â from left support @ 133.86â from left support @ 157.48â from left support Strand Layout at Midspan Cross-Section C-15
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 10803 0611 138â-3â 6.25 6â-0â 3â-4½â 7 90.0 46-0.5â Gr. 270 LR 7.0 6.0 4.0 2.5 3.5 54.75 BT-72 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 46 Number of Harped Strands: 18 CG from bottom at Midspan: 7.63â CG from Bottom at Support: 26.41â Strand Layout at Midspan Strand Layout at Support Cross-Section C-16
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 8890 0613 143â-6â 8.5 8â-0â 2â-9â 14 92.8 48-0.6â Gr. 270 LR 8.0 6.0 4.0 2.5 3 57.90 AASHTO Type VI Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 48 Number of Harped Strands: 10 CG from bottom at Midspan: 5.58â CG from Bottom at Support: 17.77â Strand Layout at Midspan Strand Layout at Support Cross-Section C-17
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 10755 0411 52â-6â 6.25 7â-0â 3â-10½â 6 90.0 24-0.5â Gr. 270 SR 6.0 5.0 3.0 3.0 9.0 N/A AASHTO Type II Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 24 Number of Harped Strands: 0 CG from bottom at Midspan: 8.33â CG from Bottom at 60â: 8.82â Strand Layout at Midspan @ 60â from left support Cross-Section C-18
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 3107 0416 49â-6½â 7.6875 5â-9¼â 2â-9 7/16â 6 90.0 12-0.5â Gr. 270 LR 6.1 5.1 3.5 2 N/A 36â I Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 12 Number of Harped Strands: 0 CG from bottom at Midspan: 5.67â Strand Layout at Midspan Cross-Section Cross-Section C-19
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 4827 0418 50â-7â 8.5 7â-2â 3â-0â 5 125.0 18-0.5â Gr. 270 LR 6.0 4.5 4.0 2 3 20.54 Beam Type 2 Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 18 Number of Harped Strands: 8 CG from bottom at Midspan: 4.22â CG from bottom at Left Support: 13.56â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-20
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 10599 0476 62â-10â 8.0 6â-9â 3â-3â 4 90 28-0.5â Gr. 270 LR 7.0 6.5 4.0 3.0 13.0 N/A AASHTO Type II Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 28 Number of Harped Strands: 0 CG from bottom at 66.75â: 8.67â CG from bottom at 138.75â: 8.38â CG from bottom at Midspan: 8.0â @ 66.75â from left support @ 138.75â from left support Strand Layout at Midspan Cross-Section C-21
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 12589 0478 73â-2 ½â 9.0 8â-9â 3â-0â 5 90 30-0.5â Gr. 270 LR 6.0 4.8 4.0 2.0 4.0 29.58 AASHTO Type IV Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 30 Number of Harped Strands: 8 CG from bottom at Midspan: 4.13â CG from bottom at Left Support: 14.80â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-22
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 5840 0489 85â-0â 8.5 9â-0â 3â-4â 5 70.0 30-0.5â Gr. 270 LR 7.5 5.25 4.0 2.0 4.0 34.47 Beam Type 6 Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 30 Number of Harped Strands: 10 CG from bottom at Midspan: 4.40â CG from bottom at Left Support: 17.73â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-23
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 8330 0491 76â-4 ½â 8.5 8â-8â 3â-0â 5 75.5 28-0.5â Gr. 270 LR 6.0 4.5 4.0 2 4 31.14 Beam Type 6 Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 28 Number of Harped Strands: 8 CG from bottom at Midspan: 4.00â CG from bottom at Left Support: 16.00â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-24
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 82 0498 82â-9â 8.75 10â-4â 3â-6â 4 105.0 34-0.5â Gr. 270 LR 5.0 4.8 4.5 2.0 2.0 33.38 MN Type 63 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 34 Number of Harped Strands: 6 CG from bottom at Midspan: 3.88â CG from bottom at Left Support: 13.59â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-25
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 4794 0497 66â-8â 8.5 3@7â-4â, 7@9â-4â 3â-7â 11 90 33-0.5â Gr. 270 LR 10.0 7.0 6.0 2 3 27.92 Beam Type 4 Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 33 Number of Harped Strands: 6 CG from bottom at Midspan: 6.48â CG from bottom at Left Support: 10.85â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-26
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 12610 0539 108â-6â â 8.0 8@7â-1 ½â, 4@6â-11â 3â-2 ½â (L) 3â-0½â (R) 13 90.0 52-0.5â Gr. 270 LR 7.0 5.4 4.0 2.0 4.0 44.85 AASHTO Type IV Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 52 Number of Harped Strands: 14 CG from bottom at Midspan: 5.69â CG from bottom at Left Support: 15.38â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-27
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 11938 0545 116â-6¼â 7 7â â 3 ¾â 3â-9â 8 117.9 46-0.5â Gr. 270 LR 7.0 6.0 3.0 2.5 2.5 47.64 BT-63 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 46 Number of Harped Strands: 16 CG from bottom at Midspan: 6.85â CG from bottom at Left Support: 21.46â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-28
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 11030 0551 136â-0â 6.25 6â-4 ½â 3â-10½â 9 90.0 50-0.5â Gr. 270 LR 7.0 6.0 3.0 2.5 3.5 48.75 BT-72 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 50 Number of Harped Strands: 16 CG from bottom at Midspan: 8.90â CG from bottom at Left Support: 22.98â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-29
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 8889 0549 90â-10¼â 8.5 10â-7â 3â-7â (L) 4â-1â (R) 4 70.6 36-0.5â Gr. 270 LR 7.0 5.5 4.0 2.5 2.5 36.74 BT-63 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 36 Number of Harped Strands: 6 CG from bottom at Midspan: 4.72â CG from bottom at Left Support: 13.39â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-30
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 8783 0553 141â-1¾â 8.5 7â-9â 3â-1â 8 96.9 46-0.6â Gr. 270 LR 8.0 6.0 4.0 2.0 2.0 57.78 AASHTO Type VI Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 46 Number of Harped Strands: 8 CG from bottom at Midspan: 4.87â CG from bottom at Left Support: 15.30â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-31
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 15620 0561 119â-9 ¾â 9.4375 5â-4â â 3â-3â â 11 90 48-0.6â Gr. 270 LR 10.0 8.0 3.0 2.7559 N/A Bulb Tee Strand Spacing: Horizontal: 1.9685â Vertical: 1.9685â # of Strands: 48 Number of Harped Strands: 0 CG from bottom at 51.57â: 6.51â CG from bottom at 75.20â: 6.35â CG from bottom at Midspan: 6.20â @ 51.57â from Left Support @75.20â from Left Support Strand Layout at Midspan Cross-Section C-32
C.3 Adjacent Precast Box Girders C-33
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 12807 0780 84â-0¼â 6.0 3@4â-0½â, 1@3â-6 ½â, 2@3â-0 ½â, 1@3â-6 ½â, 3@4â-0 ½â 2â-4 ½â 11 48.0 34-0.5â Gr. 270 SR 6.0 4.8 3.0 2.0 N/A BIII-48 28-0.5â Gr. 270 SR 2.0 N/A BIII-36 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 34 CG from bottom at Midspan: 6.71â Strand Layout at Midspan Cross-Section â BIII-48 Cross-Section â BIII-48 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 28 CG from bottom at Midspan: 7.71â Strand Layout at Midspan Cross-Section â BIII-36 Cross-Section â BIII-36 C-34
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 13788 0781 83â-0â 6.0 4â-0½â 2â-5â 9 56.8 32-0.5â Gr. 270 SR 6.0 4.8 3.0 2.0 N/A BIV-48 Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 32 CG from bottom at Midspan: 7.25â Strand Layout at Midspan Strand Layout at Left Support Cross-Section C-35
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 15238 0782 73â-9â â 5.875 1@3â-6â â, 9@4â-0â â, 1@3â-6â â 1â-11 15/16â 12 90.0 34-0.5â Gr. 270 SR 6.5 5.2 3.0 1.9685 5.118 N/A BII-48 26-0.5â Gr. 270 SR 1.9685 5.118 N/A BII-36 Strand Spacing: Horizontal: 1.9685â Vertical: 1.9685â # of Strands: 34 CG from bottom at 94.49â: 5.78â CG from bottom at Midspan: 4.89â Strand Layout at Midspan @94.49â from Left Support Cross-Section â BII-48 Strand Spacing: Horizontal: 1.9685â Vertical: 1.9685â # of Strands: 26 CG from bottom at 94.49â: 5.94â CG from bottom at Midspan: 5.18â C-36
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 15238 0782 73â-9â â 5.875 1@3â-6â â, 9@4â-0â â, 1@3â-6â â 1â-11 15/16â 12 90.0 34-0.5â Gr. 270 SR 6.5 5.2 3.0 1.9685 5.118 N/A BII-48 26-0.5â Gr. 270 SR 1.9685 5.118 N/A BII-36 Strand Layout at Midspan Cross-Section â BII-36 Cross-Section â BII-36 Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9314 0783 83â-8â 6.0 3â-1½â 1â-6â 16 90.0 22-0.6â Gr. 270 LR 5.2 5.0 4.0 2 N/A 27x36 Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 22 CG from bottom at Left Support to 96â: 3.14â CG from bottom at 156â: 2.89â CG from bottom at 240â: 3.00â CG from bottom at Midspan: 3.27â @ left support to 96â from left support @ 156â from left support @ 240â from left support Strand Layout at Midspan Cross-Section (Interior) C-37
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9314 0783 83â-8â 6.0 3â-1½â 1â-6â 16 90.0 22-0.6â Gr. 270 LR 5.2 5.0 4.0 2 N/A 27x36 Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 22 CG from bottom at Left Support to 96â: 3.14â CG from bottom at 156â: 2.89â CG from bottom at 240â: 3.00â CG from bottom at Midspan: 3.27â @ left support to 96â from left support @ 156â from left support @ 240â from left support Strand Layout at Midspan Cross-Section (Exterior) C-38
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 17075 0785 107â-0â 6.0 4â-0â 2â-7½â 10 90 44-0.5â Gr. 270 SR 6.0 4.8 3.3 2.0 N/A BIV-48 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 44 CG from bottom at left support to 138â: 4.74â CG from bottom at Midspan: 4.45â Strand Layout at Midspan Strand Layout at Left Support to 138â Cross-Section C-39
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 17175 0786 88â-9â 6.0 1@4â-0â, 1@3â-6â, 2@3â-0â, 1@3â-6â, 1@4â-0â 2â-6â 7 90.0 44-0.5â Gr. 270 SR 6.0 4.8 3.0 2.0 7.0 N/A BII-48 38-0.5â Gr. 270 SR 2 7.0 N/A BII-36 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 44 CG from bottom at Midspan: 7.45â Strand Layout at Midspan â 4âBox Cross-Section â BII 48 Cross-Section â BII 48 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 38 CG from bottom at Midspan: 8.32â Strand Layout at Midspan -3â Interior Box Cross-Section â BII-36 Cross-Section â BII-36 C-40
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 13805 0681 52â-6â 3.5 4â-0 11/16â 2â-0â (L), 1â-11 3/16â (R) 7 75 24-0.5â Gr. 270 SR 5.0 4.0 3.0 2.0 3.0 N/A BI-48 Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 24 CG from bottom at Midspan: 5.83â Strand Layout at Midspan Cross-Section Cross-Section Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 14246 0684 52â-0â 6.0 4â-0½â 2â-4¼â 8 90.0 24-0.5â Gr. 270 SR 5.0 4.0 3.0 2.0 3.0 N/A BI-48 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 24 CG from bottom at Midspan: 7.50â Strand Layout at Midspan Cross-Section Cross-Section C-41
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9180 0690 44â-8â â 5.875 3â-1 ½â 1â-6â 27 78.6 13-0.6â Gr. 270 LR 5.0 4.0 4.0 1.9685 N/A MDOT 535x915 Strand Spacing: Horizontal: 2â # of Strands: 13 CG from bottom at left support: 1.97â CG from bottom at 98.425â: 1.97â CG from bottom at Midspan: 1.97â Strand Layout at Midspan Strand layout at 59.055â Strand layout at 98.425â Cross-Section C-42
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 17042 0693 50â-0â â 5.875 1@4â-0â, 4@3â-6â, 1@4â-0â 2â-5 7/16â 7 57.0 24-0.5â Gr. 270 SR 6.0 4.8 3.0 1.9685 N/A 4â Box 20-0.5â Gr. 270 SR 1.9685 5.118 N/A 3â Box Strand Spacing: Horizontal: 1.9685â Vertical: 1.9685â # of Strands: 24 CG from bottom at Midspan: 3.61â Strand Layout at Midspan â 4âBox Cross-Section â 4â Box Cross-Section â 4â Box Strand Spacing: Horizontal: 1.9685â Vertical: 1.9685â # of Strands: 20 CG from bottom at Midspan: 4.13â Strand Layout at Midspan -3â Interior Box Cross-Section â 3â Box Cross-Section â 3â Box C-43
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9191 0736 72â-6â 6.0 3â-1 11/16â 1â-7 ½â 15 60.0 20-0.5â Gr. 270 LR 5.5 4.0 4.0 2.0 N/A 27x36 Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 20 CG from bottom at 66.00â: 3.33â CG from bottom at 114â: 3.00â CG from bottom at Midspan: 2.80â @ 66.00â from left support @ 114â from left support Strand Layout at Midspan Cross-Section C-44
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 16799 0737 84â-0â 0.0 4â-0â 2â-1 ½â 5 90.0 38-0.5â Gr. 270 LR 5.0 4.0 3.3 2.0 N/A Strand Spacing: Horizontal: 2.0952â Vertical: 2â # of Strands: 38 CG from bottom at left support: 5.63â CG from bottom at Midspan: 5.05â Interior: Exterior: Strand Layout at Midspan Strand layout at Support to 13.25â Cross-Section C-45
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 14987 0738 73â-0â 6.0 3@4â-0¾â, 1@4â-7¼â 2â-3â (L) 2â-6â (R) 5 99.7 34-0.5â Gr. 270 SR 5.0 4.0 3.3 2.0 8 N/A BIV-48 Strand Spacing: Horizontal: 2â Vertical: 2â, 4â # of Strands: 34 CG from bottom at Midspan: 8.82â Strand Layout at Midspan Cross-Section Cross-Section C-46
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 12809 0739 82â-0â 6.0 3@4â-0 ½â,1@ 3â-6 ½â, 2@3â- 0 ½â, 1@3â-6 ½â, 3@4â-0 ½â 2â-4 ¾â 11 90.0 28-0.5â Gr. 270 SR 5.0 4.0 3.0 2.0 N/A BII-36 36-0.5â Gr. 270 SR 2.0 N/A BII-48 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 28 CG from bottom at 72â: 3.33â CG from bottom at 120â: 3.17â CG from bottom at Midspan: 3.14â Strand Layout at 72â from Left Support Strand Layout at 120â from Left Support Strand Layout at Midspan- BII-36 Cross-Section â BII-36 Strand Spacing: Horizontal: 2â Vertical: 2â, 8â # of Strands: 36 CG from bottom at 72â: 3.38â CG from bottom at 144â: 3.33â CG from bottom at Midspan: 3.33â C-47
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 12809 0739 82â-0â 6.0 3@4â-0 ½â,1@ 3â-6 ½â, 2@3â- 0 ½â, 1@3â-6 ½â, 3@4â-0 ½â 2â-4 ¾â 11 90.0 28-0.5â Gr. 270 SR 5.0 4.0 3.0 2.0 N/A BII-36 36-0.5â Gr. 270 SR 2.0 N/A BII-48 Strand Layout at 72â from Left Support Strand Layout at 144â from Left Support Strand Layout at Midspan - BII-48 Cross-Section â BII-48 Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 12952 0741 79â-11 ½â 8.25 1@4â-0½â, 10@3â-6½â, 1@4â-0½â 2â-4â 13 59.8 42-0.5â Gr. 270 LR 6.0 4.8 3.0 2.0 2.0 N/A BIV-48 30-0.5â Gr. 270 LR 2.0 2.0 N/A BIV-36 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 42 CG from bottom at Midspan: 9.24â Strand Layout at Midspan â BIV-48 Cross-Section â BIV-48 Cross-Section â BIV-48 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 30 CG from bottom at Midspan: 8.67â Strand Layout at Midspan - BIV-36 Cross-Section â BIV-36 Cross-Section â BIV-36 C-48
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 17143 0742 70â-0â 6.0 1@4â-0â, 2@3â-6â, 1@4â-0â 2â-6â 5 90 30-0.5â Gr. 270 SR 5.0 4.0 3.0 2.0 7.0 N/A BIII-48 26-0.5â Gr. 270 SR 2.0 7.0 N/A BIII-36 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 30 CG from bottom at Midspan: 9.07â Strand Layout at Midspan â 4âBox Cross-Section â BIII-48 Cross-Section â BIII-48 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 26 CG from bottom at Midspan: 10.15â Strand Layout at Midspan Cross-Section â BIII-36 Cross-Section â BIII-36 C-49
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9181 0743 60â-4â â 5.875 3â-1â â 1â-7â â 15 90.0 21-0.5â Gr. 270 LR 6.5 5.0 4.0 1.9685 N/A MDOT 535x915 Strand Spacing: Horizontal: 2â Vertical: 2.0079â # of Strands: 21 CG from bottom at 36.02â: 3.31â CG from bottom at 72.05â: 2.97â CG from bottom at Midspan: 2.73â @ 36.02â from left support @ 72.05â from left support Strand Layout at Midspan Cross-Section C-50
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9071 0745 83â-7â â 5.875 3â-1â â 1â-6â â 15 120.0 16-0.6â Gr. 270 LR 5.0 3.5 4.0 2.0 N/A MDOT 840x915 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 16 CG from bottom at 157.5â: 2.00â CG from bottom at 248â: 2.00â CG from bottom at Midspan: 2.25â @ 157.5â from left support @ 248.0â from left support Strand Layout at Midspan Cross-Section Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 16 CG from bottom at 157.5â: 2.00â CG from bottom at 248â: 2.25â CG from bottom at Midspan: 2.25â @ 157.5â from left support @ 248.0â from left support Strand Layout at Midspan Cross-Section C-51
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9167 0746 75â-6¾â 5.875 4â-1½â 2â-1â â 12 120.0 22-0.6â Gr. 270 LR 5.0 4.0 4.0 1.9685 N/A MDOT 685x1220 Strand Spacing: Horizontal: 1.9685â Vertical: 2.0079â # of Strands: 22 CG from bottom at 63.0â: 3.10â CG from bottom at 118.125â: 3.20â CG from bottom at 185.04â: 3.07â CG from bottom at Midspan: 2.97â @ 63.0â from left support @ 118.11â from left support @ 185.04â from left support Strand Layout at Midspan Cross-Section - Interior C-52
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9167 0746 75â-6¾â 5.875 4â-1½â 2â-1â â 12 120.0 22-0.6â Gr. 270 LR 5.0 4.0 4.0 1.9685 N/A MDOT 685x1220 Strand Spacing: Horizontal: 1.9685â Vertical: 2.0079â # of Strands: 22 CG from bottom at 63.0â: 3.10â CG from bottom at 118.11â: 3.20â CG from bottom at 185.04â: 3.07â CG from bottom at Midspan: 2.97â @ 63.0â from left support @ 118.11â from left support @ 185.04â from left support Strand Layout at Midspan Cross-Section - Exterior Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 17008 0747 82â-6â â 6.25 4â-0â 2â-6â 8 115.0 38-0.5â Gr. 270 SR 7.0 5.6 3.0 1.9685 N/A AASHTO BII- 1220 Strand Spacing: Horizontal: 1.9685â Vertical: 1.9685â # of Strands: 38 CG from bottom at Midspan: 6.11â Strand Layout at Midspan Cross-Section Cross-Section C-53
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 5125 0748 66â-0â 5.5 1@3â-6â, 7@4â-0â,1@3â- 6â, 2@3â-0â, 1@3â-6â, 7@4â-0â, 1@3â-6â 1â-6â 22 108.0 24-0.5â Gr. 270 LR 6.0 4.5 4.0 2.0 3.0 N/A 36âx33â Box Girder 26-0.5â Gr. 270 LR 2.0 3.0 48âx33â Box Girder Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 24 CG from bottom at Midspan: 4.92â Strand Layout at Midspan Cross-Section Cross-Section â 36âx33â Box Girder Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 26 CG from bottom at Midspan: 4.77â Strand Layout at Midspan Cross-Section Cross-Section â 48âx33â Box Girder C-54
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 13118 0749 69â-2¾â 5.875 1@3â-7 3/16â, 2@3â-1 3/16â, 1@3â-7 ¼â, 2@4â1 3/16â, 1@3â-7 ¼â, 2@3â-1 3/16â, 1@3â-7 3/16â 2â-3 15/16â 11 60.0 18-0.6â Gr. 270 LR 10.2 8.0 3.0 1.9685 4.9213 N/A AASHTO BI-915 19-0.6â Gr. 270 LR 1.9685 4.9213 N/A AASHTO BI- 1220 Strand Spacing: Horizontal: 1.9685â Vertical: 1.9685â # of Strands: 18 CG from bottom at Midspan: 4.42â Strand Layout at Midspan Cross-Section Cross-Section â AASHTO BI-915 Strand Spacing: Horizontal: 1.9685â Vertical: 1.9685â # of Strands: 19 CG from bottom at Midspan: 4.08â Strand Layout at Midspan Cross-Section Cross-Section â AASHTO BI-1220 C-55
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 5911 0750 59â-5â 5.5 3â-0â 1â-6â 50 125 14-0.5â Gr. 270 LR 5.0 4.0 4.0 1.75 N/A 27x36 Box Strand Spacing: Horizontal: 1.375â Vertical: 1.5â # of Strands: 14 CG from bottom at Midspan: 2.39â Strand Layout at Midspan Cross-Section Cross-Section â 27x36 Box Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 3805 0751 59â-0½â 0.0 3â-0â 1â-6â 14 90.0 15-0.5â Gr. 270 LR 5.0 4.0 3.5 1.75 N/A 27âx36â IDOT Beam Strand Spacing: Horizontal: 1.375â, 3â Vertical: 1.5â, 1.25â, 3â # of Strands: 15 CG from bottom at Midspan: 3.12â Strand Layout at Midspan Cross-Section Cross-Section â 27âx36â IDOT Beam C-56
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 3819 0752 74â-10½â 0.0 3â-0â 1â-6â 11 128.8 18-0.5â Gr. 270 LR 5.0 4.0 3.5 1.75 N/A 33âx36â Box Beam Strand Spacing: Horizontal: 1.375â, 3â Vertical: 1.5â, 2.75â, 3â # of Strands: 18 CG from bottom at Midspan: 3.72â Strand Layout at Midspan Cross-Section Cross-Section Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9240 0763 97â-11â 6.0 3â-1 ½â 1â-6â 25 90.0 28-0.5â Gr. 270 LR 5.5 3.6 4.0 2.0 N/A 33âx36â MDOT Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 28 CG from bottom at Left Support to 132â: 3.75â CG from bottom at 252â: 3.82â CG from bottom at 312â: 3.54â CG from bottom at Midspan: 3.43â C-57
@ left support to 132â from left support @ 252â from left support @ 312â from left support Strand Layout at Midspan Cross-Section Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9103 0764 111â-2â â 5.875 4â-1â â 2â-1 ½â 16 100.8 25-0.6â Gr. 270 LR 5.0 3.5 4.0 2.0 N/A MDOT 1220x1220 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 25 CG from bottom at left support: 2.78â CG from bottom at Midspan: 3.04â Strand Layout at Midspan Strand layout at Support to 157.48â Cross-Section - Interior C-58
Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 25 CG from bottom at left support: 2.78â CG from bottom at Midspan: 3.04â Strand Layout at Midspan Strand layout at Support to 157.5â Cross-Section - Exterior Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9228 0765 110â-5¼â 5.875 4â-2 13/16â 2â-1 ½â 11 72.2 24-0.6â Gr. 270 LR 6.1 4.6 4.0 1.9685 N/A MDOT 1220x1220 Strand Spacing: Horizontal: 2.0079â Vertical: 1.9685â # of Strands: 24 CG from bottom at left support: 2.33â CG from bottom at Midspan: 2.30â Strand Layout at Midspan Strand layout at Support to 19.685â Cross-Section C-59
C-60
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 14070 0766 115â-0â 0.0 3â-1 3/16â 1â-6â 11 60.0 42-0.5â Gr. 270 LR 7.5 5.5 2.0 4.5 N/A 36âx45â Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 42 CG from bottom at 36â: 8.03â CG from bottom at 72â: 7.50â CG from bottom at Midspan: 7.07â @ 36â from left support @ 72â from left support Strand Layout at Midspan Cross-Section Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 16538 0767 101â-8½â 5.875 4â-0¾â 2â-4â 9 90.0 38-0.5â Gr. 270 LR 7.25 5.1 3.0 1.9685 N/A AASHTO BIV-48 mod Strand Spacing: Horizontal: 1.9685â Vertical: 1.9685â # of Strands: 38 CG from bottom at Midspan: 2.90â Strand Layout at Midspan Cross-Section Cross-Section C-61
C.4 Spread Precast Box Girders C-62
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9310 0774 51â-11 â â 9.0 5â-11â â 2â-2¼â 12 90.0 20-0.6â Gr. 270 LR 6.0 5.5 4.0 2.0 N/A 21x36 Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 20 CG from bottom at 118.1â: 3.71â CG from bottom at 196.85â: 3.33â CG from bottom at Midspan: 3.40â @ 118.1â from left support @ 196.85â from left support Strand Layout at Midspan Cross-Section C-63
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9384 0622 44â-1 ½â 9.0 6â-7¼â 3â-3â â 10 89.4 14-0.6â Gr. 270 LR 6.1 4.6 4.0 2 N/A 21x36 Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 14 CG from bottom at 59.0â: 3.50â CG from bottom at 86.6â: 3.00â CG from bottom at Midspan: 2.86â @ 59.0â from left support @86.6â from left support Strand Layout at Midspan Cross-Section C-64
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9380 0629 32â-1â 9.0 9â-1 3/16â 2â-6â 10 85.6 12-0.5â Gr. 270 LR 5.0 3.0 4.0 2.0 N/A 21x36 Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 12 CG from bottom at left support: 2.00â CG from bottom at Midspan: 2.00â Strand Layout at Midspan Strand layout at Support to 36.0â Cross-Section Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 17338 0675 49â-0â 8.5 8â-0â 4â-0â 4 135 18-0.5â Gr. 270 SR 5.0 4.0 3.0 2.0 N/A AASHTO BII-48 Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 18 CG from bottom at Midspan: 2.00â Strand Layout at Midspan Cross-Section Cross-Section C-65
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9282 0679 36â-3â â 9.0 7â-10â 3â-0â (L), 4â-0â (R) 12 67.3 16-0.5â Gr. 270 LR 5.0 4.0 4.0 2 N/A 17âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 16 CG from bottom at left support to 120â: 2.33â CG from bottom at Midspan: 2.50â Strand Layout at Midspan Strand layout at Support to 120.0â Cross-Section C-66
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9192 0686 38â-8â 9.0 3@6â-6 11/16â 5@9â-10â 3â-9 ½â 9 80 18-0.5â Gr. 270 LR 5.5 4.4 4.0 2.0 N/A 21âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 18 CG from bottom at Support to 24â: 3.00â CG from bottom at Midspan: 2.89â Strand Layout at Midspan Strand Layout at Support to 24â Cross-Section â 21âx36â Box Beam C-67
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9286 0695 50â-8â 9.0 8â-0 ½â 3â-2â â 6 90 20-0.6â Gr. 270 LR 6.0 5.0 4.0 2.0 2.5 N/A 27âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 20 CG from bottom at 0.5â from LS: 3.43â CG from bottom at 48â from LS: 6.06â CG from bottom at 140â from LS: 5.61â CG from bottom at Midspan: 7.50â @ 0.5â from left support @ 48â from left support @ 140.0â from left support Strand Layout at Midspan Cross-Section C-68
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9368 0707 71â-3â 9.0 7â-4 ½â 2â-11½â 5 97.4 30-0.5â Gr. 270 LR 6.3 4.9 4.0 2.0 N/A 33âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 30 CG from bottom at 63â from LS: 3.75â CG from bottom at 102â from LS: 3.64â CG from bottom at 147â from LS: 3.38â CG from bottom at Midspan: 3.20â @ 63â from left support @ 102â from left support @ 147.0â from left support Strand Layout at Midspan Cross-Section C-69
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9328 0740 57â-3¼â 9.0 6â-11â 3â-3â â 6 90.0 26-0.5â Gr. 270 LR 6.5 5.3 4.0 2 N/A 27x36 Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 26 CG from bottom at 36.0â: 3.20â CG from bottom at 114.0â: 3.33â CG from bottom at Midspan: 3.38â @ 36.0â from left support @ 114.0â from left support Strand Layout at Midspan Cross-Section C-70
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9376 0744 53â-4¼â 9.0 7â-4â â 3â-5 5/16â 12 90.0 15-0.6â Gr. 270 LR 7.0 6.2 4.0 2 N/A 27x36 Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 15 CG from bottom at 72.0â: 3.78â CG from bottom at 108.0â: 3.45â CG from bottom at Midspan: 3.07â @ 72.0â from left support @ 108.0â from left support Strand Layout at Midspan Cross-Section Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 3577 0222003 38â-7â 7.5 6â-8â â 4â-0 7/16â 4 101.3 27-0.4375â Gr. 248 SR 5.0 4.0 3.5 1.75 N/A 27âx36â IDOT Beam Strand Spacing: Horizontal: 1.375â, 3â Vertical: 1.5â, 1.25â, 3â # of Strands: 27 CG from bottom at Midspan: 3.94â Strand Layout at Midspan Cross-Section Cross-Section C-71
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 3754 0980015 53â-7 ¼â 7.0 1@6â-6â, 7@6â 2 9/16â, 2@6â-0â 1â-6â 11 151.7 30 (or 28) -0.4375â Gr. 248 SR 5.0 4.0 3.5 1.75 N/A 33x36 IDOT Beam Strand Spacing: Horizontal: 1.375â, 3â Vertical: 1.5â, 2.75â, 3â All girders except far left and two far right: # of Strands: 30 CG from bottom at Midspan: 4.50â Far left and two far right girders: # of Strands: 28 CG from bottom at Midspan: 4.95â Strand Layout at Midspan Cross-Section C-72
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 8875 A8029 38â-0â 8.5 11â-3â 3â-1½â 12 96.4 23-0.5â Gr. 270 LR 8.0 5.0 4.0 1.75 N/A 27x48 Box Beam Strand Spacing: Horizontal: 2.75â Vertical: 1.5â, 2.75â, 3â # of Strands: 23 CG from bottom at Midspan: 2.34â Strand Layout at Midspan Cross-Section Cross-Section C-73
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 12870 2219470 77â-6â 8.5 6â-6â 2â-0â 5 105.0 30-0.5â Gr. 270 SR 6.0 4.8 3.0 2.0 N/A 36x48 Box Beam Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 30 CG from bottom at 120.0â: 4.20â CG from bottom at 144.0â: 3.85â CG from bottom at Midspan: 4.00â @ 120.0â from left support @ 144.0â from left support Strand Layout at Midspan Cross-Section C-74
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 14969 1023430 78â-8â â 9.4375 7â-10â â 4â-5 5/16â (L), 4â-11 3/16â (R) 7 90.0 48-0.5â Gr. 270 LR 6.5 4.5 3.0 1.9685 N/A AASHTO BIV- 48 Strand Spacing: Horizontal: 1.9685â Vertical: 1.9685â # of Strands: 48 CG from bottom at 98.4â from LS: 6.69â CG from bottom at 141.75â from LS: 6.30â CG from bottom at 216.5â from LS: 5.73â CG from bottom at Midspan: 5.58â @ 98.4â from left support @ 141.75â from left support @ 216.5â from left support Strand Layout at Midspan Cross-Section Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 16293 BID_2751 57â-3 ¼â 9.4375 8â-10 5/16â 4â-1â â 7 96.0 26-0.6â Gr. 270 LR 10.2 7.1 3.0 2.2441 4.252 N/A 1220x1220 Box Beam Strand Spacing: Horizontal: 1.9685â Vertical: 2â # of Strands: 26 CG from bottom at Midspan: 8.48â C-75
Strand Layout at Midspan Cross-Section Cross-Section Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 16366 2223270 60â-4â â 9.4375 6â-7â 4â-0 1/16â 6 102.4 38-0.5â Gr. 270 LR 7.5 6.0 3.0 1.9685 N/A Based on AASHTO BI- 48 Strand Spacing: Horizontal: 1.9685â Vertical: 1.9685â, 3.937â, 1.9685â, 5.9055â, 1.9685â # of Strands: 38 CG from bottom at Midspan: 5.39â Strand Layout at Midspan Cross-Section Cross-Section C-76
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 17240 3300870 51â-6â 8.5 8â-0â 4â-0â 4 90.0 24 (or 26)-0.5â Gr. 270 SR 6.0 4.8 3.0 2.0 N/A AASHTO BII- 48 Strand Spacing: Horizontal: 2.0â Vertical: 2.0â Interior: # of Strands: 24 CG from bottom at Midspan: 3.67â Exterior: # of Strands: 26 CG from bottom at Midspan: 3.23â Strand Layout at Midspan â Interior Girder Strand Layout at Midspan â Exterior Girder Cross-Section C-77
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9090 13113081000S05 3 66â-0½â 9.0 7â-1â 3â-5â 9 68.6 20-0.6â Gr. 270 LR 5.3 5.3 4.0 2.0 N/A MDOT 33â Box Beam (Int) 5.6 5.6 MDOT 33â Box Beam (Ext) Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 20 Interior: CG from bottom at 60.0â from LS: 3.14â CG from bottom at 84.0â from LS: 3.25â CG from bottom at 174.0â from LS: 3.11â CG from bottom at Midspan: 3.00â Exterior: CG from bottom at 54.0â from LS: 3.14â CG from bottom at 78.0â from LS: 3.25â CG from bottom at 114.0â from LS: 3.11â CG from bottom at Midspan: 3.00â @ 60.0â from left support @ 84.0â from left support @ 174.0â from left support Strand Layout at Midspan Cross-Section C-78
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9091 13113081000S05 4 66â-2½â 9.0 7â-1â 3â-5â 9 68.3 20-0.6â Gr. 270 LR 5.3 5.3 4.0 2.0 N/A MDOT 33â Box Beam (Int.) 5.5 5.5 MDOT 33â Box Beam (Ext.) Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 20 Interior: CG from bottom at 60.0â from LS: 3.14â CG from bottom at 84.0â from LS: 3.25â CG from bottom at 174.0â from LS: 3.11â CG from bottom at Midspan: 3.00â Exterior: CG from bottom at 54.0â from LS: 3.14â CG from bottom at 78.0â from LS: 3.25â CG from bottom at 132.0â from LS: 3.11â CG from bottom at Midspan: 3.00â @ 60.0â from left support @ 84.0â from left support @ 174.0â from left support Strand Layout at Midspan Cross-Section C-79
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9128 29129011000S14 0 33â-8â â 9.0625 7â-5â â 3â-1¼â 8 90.0 4-0.6â Gr. 270 LR 6.0 4.5 4.0 2.28 N/A 1525 Box Beam Strand Spacing: Horizontal: 2.402â Vertical: 2.402â # of Strands: 4 CG from bottom at Midspan: 2.28â Strand Layout at Midspan Cross-Section Cross-Section C-80
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9217 45145071000B01 0 42â-3½â 9.25 3@6â-2 ½â, 7@5â-8â â 3â-3â 11 90.0 16-0.6â Gr. 270 LR 5.8 5.3 4.0 2.0 2.5 N/A 17â Box Beam (A) 5.6 5.2 17â Box Beam (B and C) 5.2 5.1 17â Box Beam (D) 5.0 4.9 17â Box Beam (E thru K) 5.9 5.3 17â Box Beam (L) Strand Spacing: Horizontal: 2â Vertical: 2â Beams: (A) is far left girder, (L) is far right girder # of Strands: 16 Girders: A and L CG from bottom at Midspan: 4.06â Girders: B, C, D CG from bottom at Support to 54â: 4.36â CG from bottom at Midspan: 4.06â Girders: E thru K CG from bottom at Support to 96â: 4.36â CG from bottom at Midspan: 4.06â Strand Layout at Midspan (All girders) Strand Layout at Support to 96â (E thru K), 54â (B thru D) Cross-Section C-81
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9219 16116032000B03 0 53â-2â 9.0 5â-3â 2â-7½â 9 90.0 16-0.6â Gr. 270 LR 5.7 5.6 4.0 2.0 N/A MDOT 21â Box Beam Strand Spacing: Horizontal: 1â Vertical: 2â # of Strands: 16 CG from bottom at Support to 72â: 2.57â CG from bottom at Midspan: 2.50â Strand Layout at Midspan Strand Layout at Support to 72â Cross-Section C-82
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9243 82182041000S02 0 73â-4â 9.0 6â-2â 2â-3¾â 13 90.0 21-0.6â Gr. 270 LR 7.0 6.0 4.0 2.0 N/A 33âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 21 CG from bottom at 24.0â: 2.75â CG from bottom at 48.0â: 2.67â CG from bottom at Midspan: 2.57â @ 24.0â from left support @ 48.0â from left support Strand Layout at Midspan Cross-Section Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9248 02102041000B02 0 37â-9â 9.0 8â-0â 3â-2½â 6 90.0 18-0.6â Gr. 270 LR 6.0 5.0 4.0 2.0 3.0 N/A 21â Box Beam C-83
Strand Spacing: Horizontal: 2.0â, Vertical: 2.0â, 10.0â # of Strands: 18 CG from bottom at Midspan: 6.33â Strand Layout at Midspan Cross-Section Cross-Section Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9284 33133082000B03 0 31â-6¾â 9.0625 6â-7â â 2â-5½â 10 90.0 9-0.6â Gr. 270 LR 5.0 3.0 4.0 2.0 N/A 17âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 9 CG from bottom at Support to 78.74â: 2.57â CG from bottom at Midspan: 2.44â Strand Layout at Midspan Strand Layout at Support to 78.74â Cross-Section C-84
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 1150 550A0490001 70â-7â 8.25 8â-6â 3â-8â 3 28 39-0.5â Gr. 270 LR 6.5 6.0 3.0 2.0 3.0 N/A 33âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 39 CG from bottom at 62.99â: 2.33â CG from bottom at 36â: 3.87â CG from bottom at 72â: 3.88â CG from bottom at 108â: 3.68â CG from bottom at Midspan: 3.59â @ 36â from left support @ 72â from left support @ 108â from left support Strand Layout at Midspan Cross-Section C-85
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9324 14114041000B01 0 42â-4â 9.0 10â-6â 2â-7½â 5 90.0 20-0.5â Gr. 270 LR 5.5 4.4 4.0 2.0 N/A 27âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 20 CG from bottom at Support to 66.0â: 3.50â CG from bottom at Midspan: 3.40â Strand Layout at Midspan Strand Layout at Support to 66.0â Cross-Section C-86
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9349 72172041000B01 0 48â-8â 9.0 7â-0â 3â-6â 6 90.0 22-0.5â Gr. 270 LR 6.0 4.9 4.0 2.0 N/A 21âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 22 CG from bottom at Support to 66.0â: 3.33â CG from bottom at Midspan: 3.45â Strand Layout at Midspan Strand Layout at Support to 66.0â Cross-Section C-87
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhang Width (ft) # of Girders Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9355 38138111000R02 1 75â-2â â 9.0625 7â-11â 3â-6â 6 109.6 26-0.6â Gr. 270 LR 7.0 6.2 4.0 2.0 2.75 N/A 39âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 26 CG from bottom at Support to 225.60â: 2.73â CG from bottom at Midspan: 7.88â Strand Layout at Midspan Strand Layout at Support to 225.60â Cross-Section C-88
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhan g Width (ft) # of Girder s Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9356 38138111000R02 2 75â-2â â 9.062 5 7â-11â 3â-6â 6 109.6 26-0.6â Gr. 270 LR 7.0 6.2 4.0 2.0 2.75 N/A 39âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 26 CG from bottom at Support to 213.04â: 2.73â CG from bottom at Midspan: 7.88â Strand Layout at Midspan Strand Layout at Support to 213.04â Cross-Section C-89
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhan g Width (ft) # of Girder s Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9361 47147065000R03 3 65â-9½â 9.0 6â-0â 2â-7½â 11 137.2 30-0.5â Gr. 270 LR 6.5 5.5 4.0 2.0 N/A 27âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 30 CG from bottom at 18.0â from LS: 3.82â CG from bottom at 79.2â from LS: 3.54â CG from bottom at 150.0â from LS: 3.43â CG from bottom at Midspan: 3.47â @ 18.0â from left support @ 79.2â from left support @ 150.0â from left support Strand Layout at Midspan Cross-Section C-90
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhan g Width (ft) # of Girder s Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9369 11111015000R03 3 51â-3â â 9.0 6â-6â 3â-4½â 10 115.7 14-0.6â Gr. 270 LR 5.4 4.5 4.0 2.0 N/A 27âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 14 CG from bottom at Support to 48.0â: 3.67â CG from bottom at Midspan: 3.43â Strand Layout at Midspan Strand Layout at Support to 48.0â Cross-Section C-91
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhan g Width (ft) # of Girder s Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9370 11111015000R03 4 51â-3â â 9.0 6â-5â 3â-4â 12 115.7 14-0.6â Gr. 270 LR 5.2 4.4 4.0 2.0 N/A 27âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 14 CG from bottom at Support to 54.0â: 3.67â CG from bottom at Midspan: 3.43â Strand Layout at Midspan Strand Layout at Support to 54.0â Cross-Section C-92
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhan g Width (ft) # of Girder s Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 9383 71171073000B01 0 46â-9â â 9.0 10â-7â 2â-6â 5 45.0 16-0.6â Gr. 270 LR 6.0 5.0 4.0 2.0 N/A 27âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 16 CG from bottom at 24.0â: 2.33â CG from bottom at 72.0â: 2.29â CG from bottom at Midspan: 2.25â @ 24.0â from left support @ 72.0â from left support Strand Layout at Midspan Cross-Section C-93
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhan g Width (ft) # of Girder s Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI ksi) fcâdeck (ksi) Bottom Top 9394 25125031000S01 0 66â-10â â 9.0 7â-6â 4â-1½â 11 59.8 34-0.5â Gr. 270 LR 6.0 5.0 4.0 2 N/A 27âx48â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 34 CG from bottom at 54.0â: 2.75â CG from bottom at 96.0â: 3.00â CG from bottom at Midspan: 3.12â @ 54.0â from left support @ 96.0â from left support Strand Layout at Midspan Cross-Section C-94
Bridge # Virtis BID # Span length (ft) tslab (in) Girder Spacing (ft) Overhan g Width (ft) # of Girder s Skew (deg) Materials Dist. to Extreme Strands (in) Harp Point (ft) Beam Section P/S Tendons fcâ (ksi) fcâI (ksi) fcâdeck (ksi) Bottom Top 1150 550A0490001 70â-7â 8.25 8â-6â 3â-8â 3 118.0 39-0.5â Gr. 270 LR 6.5 6.0 3.0 2.0 N/A 33âx36â Box Beam Strand Spacing: Horizontal: 2â Vertical: 2â # of Strands: 39 CG from bottom at 36.0â from LS: 3.87â CG from bottom at 72.0â from LS: 3.88â CG from bottom at 108.0â from LS: 3.68â CG from bottom at Midspan: 3.59â @ 36.0â from left support @ 72.0â from left support @ 108.0â from left support Strand Layout at Midspan Cross-Section C-95
C.5 ASBI Box Girders C-96
C-97
C-98