National Academies Press: OpenBook
« Previous: References
Page 79
Suggested Citation:"Appendix A." National Academies of Sciences, Engineering, and Medicine. 2009. Right-of-Way Methods and Tools to Control Project Cost Escalation. Washington, DC: The National Academies Press. doi: 10.17226/23003.
×
Page 79
Page 80
Suggested Citation:"Appendix A." National Academies of Sciences, Engineering, and Medicine. 2009. Right-of-Way Methods and Tools to Control Project Cost Escalation. Washington, DC: The National Academies Press. doi: 10.17226/23003.
×
Page 80
Page 81
Suggested Citation:"Appendix A." National Academies of Sciences, Engineering, and Medicine. 2009. Right-of-Way Methods and Tools to Control Project Cost Escalation. Washington, DC: The National Academies Press. doi: 10.17226/23003.
×
Page 81
Page 82
Suggested Citation:"Appendix A." National Academies of Sciences, Engineering, and Medicine. 2009. Right-of-Way Methods and Tools to Control Project Cost Escalation. Washington, DC: The National Academies Press. doi: 10.17226/23003.
×
Page 82
Page 83
Suggested Citation:"Appendix A." National Academies of Sciences, Engineering, and Medicine. 2009. Right-of-Way Methods and Tools to Control Project Cost Escalation. Washington, DC: The National Academies Press. doi: 10.17226/23003.
×
Page 83

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

APPENDIX A PROJECT DEVELOPMENT PHASES (Anderson et al., 2007a) 76

77 Figure A-1: Cost estimation practice and cost estimation management during planning (NCHRP 8-49, Phase I).

Figure 11: Cost estimation practice and cost estimation management during programming (NCHRP 8-49, Phase I). 78

79 Figure A-3: Cost estimation practice and cost estimate management during preliminary design (NCHRP 8-49, Phase I).

Figure A-4: Cost estimating and cost estimation management during final design (NCHRP 8-49, Phase I). 80

Next: Appendix B »
Right-of-Way Methods and Tools to Control Project Cost Escalation Get This Book
×
 Right-of-Way Methods and Tools to Control Project Cost Escalation
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s National Cooperative Highway Research Program (NCHRP) Web-Only Document 132: Right-of-Way Methods and Tools to Control Project Cost Escalation explores the data-gathering and analysis processes used to create a procedures guide for right-of-way cost estimating.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!