National Academies Press: OpenBook

Design Flexibility Considerations for Built Urban Environments (2009)

Chapter: Design Flexibility Considerations for Built Urban Environments

Page 1
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 1
Page 2
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 2
Page 3
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 3
Page 4
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 4
Page 5
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 5
Page 6
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 6
Page 7
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 7
Page 8
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 8
Page 9
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 9
Page 10
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 10
Page 11
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 11
Page 12
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 12
Page 13
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 13
Page 14
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 14
Page 15
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 15
Page 16
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 16
Page 17
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 17
Page 18
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 18
Page 19
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 19
Page 20
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 20
Page 21
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 21
Page 22
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 22
Page 23
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 23
Page 24
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 24
Page 25
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 25
Page 26
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 26
Page 27
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 27
Page 28
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 28
Page 29
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 29
Page 30
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 30
Page 31
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 31
Page 32
Suggested Citation:"Design Flexibility Considerations for Built Urban Environments." National Academies of Sciences, Engineering, and Medicine. 2009. Design Flexibility Considerations for Built Urban Environments. Washington, DC: The National Academies Press. doi: 10.17226/23027.
×
Page 32

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Research Results Digest 337 Sponsored by the Federal Highway Administration June 2009 C O N T E N T S Summary, 1 Introduction, 3 Background, 3 Report Objective, 4 Report Organization, 4 Literature Review, 4 Introduction, 4 Urban Design Guides, 5 Design Exceptions, 6 Design Factors, 8 Design Goals, 9 Safety Trade-Offs, 9 Summary, 11 Survey, 11 Procedures, 11 Survey Results, 12 Case Studies, 19 CASE 1: Kuhio Avenue Improve- ment Project, 20 CASE 2: Route 734 Improvement Project, 21 CASE 3: Dixie Highway Access Improvements, 22 Conclusions, 23 Agency Responsibility, 24 Need for Variance, 24 Design Exception Process, 25 Efforts to Improve, 26 Future Study Needs, 26 References, 27 Appendices A–D, 29 SUMMARY Roadway designers rely on design stan- dards (mandatory practice), guidelines (rec- ommended practice, but not mandatory), and policies to develop a roadway facility that will be safe, address mobility concerns, accommodate the physical and social envi- ronment, and be financially feasible. Bal- ancing these elements becomes a critical part of the design process and sometimes it may not be practical to strictly conform to existing guidelines or standards. To address potential conflicts, the roadway design may need to deviate from the prevailing guide- lines and policies. The increased density of development and populations in built urban environments and the need for contextual designs to address community needs could result in a more frequent need for design exceptions or variances. An understanding of the impacts of such alternative designs on both the safety and the operational char- acter of the roadway is essential. In large cities, limited right-of-way, human and natural environmental issues, pedestrian and bicyclist accommodation, and aesthetic concerns often require a more contextual design to be used than in non- built environments. It is therefore often re- quired to develop unique solutions that may not conform to existing guidelines and re- quire the use of design exceptions or vari- ances. The objective of this report is, there- fore, to (1) understand why such departures from the guidelines may be needed or de- sired, (2) identify processes that success- fully manage such design procedures, and (3) determine means that could assist de- signers to streamline this process and pro- vide a timely procedure for addressing de- sign exceptions or variances. These three objectives were addressed though a survey of design and variance procedures of both local transportation agencies for large cities, as well as state departments of transporta- tion (DOTs). A response rate of 69% (27 of 39) from both local agencies and state DOTs was achieved providing a wider-ranging geo- graphic and population size cross-section perspective of design solutions from two distinctly different municipal entities. The outcome of this effort, further defined, at- tempted to offer state-of-the-practice infor- mation about proactively addressing design issues in a collaborative manner. Local roads are the primary responsi- bility of municipal transportation and pub- lic works agencies for large urban centers and these agencies are often involved in all phases of the project development process. Most agencies reported the use of design standards (68%), whereas a few use design guidelines (21%) in roadway design. The use of guidelines appears to also provide a DESIGN FLEXIBILITY CONSIDERATIONS FOR BUILT URBAN ENVIRONMENTS This digest contains excerpts from a study conducted for NCHRP Project 20-05, “Synthesis of Information Related to Highway Problems.” The study was conducted by Nikiforos Stamatiadis, University of Kentucky, Lexington. Donna Vlasak is the Senior Program Officer for this study. Subject Area: IIA Highway and Facility Design Senior Program Officer: Nanda Srinivasan NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM Sponsored by the Federal Highway Administration

greater flexibility to agencies when design excep- tions are considered, as was noted in the correlation of the frequency of design exception applications and design documents used. This may be a practice that agencies need to review to improve their design ex- ception process and allow for greater flexibility if needed. It should also be noted here that even though the Green Book (A Policy on Geometric Design of Highways and Streets) provides flexibility for de- sign, this flexibility may not be adequate when urban designs are considered, as was documented by the responses of several agencies. There are a variety of constraints that may re- quire design flexibility in a project and understand- ing their influence is critical in determining the rea- sons for variance from the typical design. The survey respondents identified right-of-way restrictions or limitations as the primary reason for considering flex- ibility. The need to accommodate pedestrians and bi- cyclists also ranked high in the reasons for design flexibility and thus underscore the potential influ- ence that non-motorized users have on the design of urban streets. The limited right-of-way and the need to accommodate all users of the facility in urban areas may be the most critical aspects of roadway design and thus require significant flexibility and, often, innovative design. Additional reasons for de- sign exceptions noted by the respondents included a mixture of design features, operational considera- tions, financial constraints, and safety considerations, all of which have a significant impact on developing a project solution, and may often require balancing to reach this solution. The answers conform to a priori expectations, because all are factors that have to be considered. Design exceptions or variances are widely used by local transportation agencies of built urban envi- ronments. Of interest was that one-half of the re- spondents indicated that they consider design ex- ceptions for a select type of projects, whereas the others noted that they consider them for all project types. The agencies noting that they consider design exceptions for select types of projects have their own design guidelines. This finding could support the assumption that these agencies feel comfortable with the existing flexibility in their design docu- ments and do not see the need for design exception in any but a few project types. The 13 criteria pro- vided by FHWA for use in design exceptions are ad- equate for most agencies. A few agencies noted the use of operational capacity and clear zone as addi- tional criteria incorporated in their documentation process. Therefore, it appears that the existing crite- ria cover adequately the spectrum of needs for de- sign exceptions, but the consideration of the other two (operational capacity and clear zone) may be added to the list to provide the flexibility needed to meet the needs of the built urban environment. The question regarding the level of flexibility of the cri- teria used as they compare to the values of the Green Book showed that all agencies but one believe that they are less strict or the same. This appears to indi- cate that the processes that are in place adequately address flexibility. It should also be noted that the Green Book provides such flexibility but case studies that showcase such contextual examples in built en- vironments are needed. Design exception requests in built urban environ- ments are mostly within the transportation agency’s staff supervision and responsibility even for agencies that rely on consultants to complete their design. De- sign exception applications are mostly submitted in the design phase of the project development process. This is probably a reasonable point in the project de- velopment process to address the need for flexibility and, therefore, there is no need for altering the prac- tice. This approach will also provide a timely identi- fication and resolution of possible problem areas and thus reduce any potential delays owing to the review of the application. The review of design exceptions is mostly completed by the agency’s design team or group, even if it was prepared by agency staff. In such cases, local agencies noted that they have a separate design exception committee or that the documents are reviewed by the agency’s legal office. The review time could also be related to the number of design exceptions that an agency typically completes within a year; however, there was no correlation between the number of design exceptions and review time. One can assume that efforts to improve a process start with a review of current practices and the iden- tification of areas that need to be addressed. How- ever, most agencies responded that they have not con- ducted a review of their design exception process. This could be an indication of the lack of staff to complete this effort, not concern about the existing processes or the low number of design exception ap- plications. The latter assumption was verified by two agencies that have not conducted a review because they have fewer than five design exceptions per year and short review time (three to six months). The re- sponses provided did not allow for the identification 2

of a pattern regarding when an agency needs to con- duct a review of its practices. Several of the agencies noted that they are in- volved in a variety of efforts to improve their design process for timely resolution of potential issues. These efforts include the development of improved guid- ance, clarification of the controlling criteria, and training of personnel. These efforts could positively affect both timely preparation and review of design exception applications. Moreover, this variety of approaches indicates that each agency should deter- mine what may be the most appropriate method to improve their design exception process. Among the comments received regarding lessons learned and efforts to improve, the most common theme was de- velopment of checklists and clarification of the ranges for the criteria to be used. This report provides a review of the design ex- ception or variance practices for transportation agen- cies in built urban environments. Even though a rea- sonable understanding of the state of practice as it exists could be gleaned from the findings of this study, there are additional topics of interest relative to this issue that can only be addressed by additional research. The size, type, context, and number of proj- ects that an agency deals with may partially explain the great variability noted in the responses of the agencies. However, the comments received could also indicate that the variability may be the result of knowledge gaps or documents used. Therefore, topics recommended for future studies include an evaluation of costs and benefits from design ex- ceptions, clarification of the impacts of design ele- ments, exploration of the tort liability implications, and review of Green Book guidance for urban streets and roads. This report attempts to identify the state of prac- tice for both local and state transportation agencies’ perspectives of built urban environments regarding their approaches to issues with design exceptions. In general, the findings show a varied approach and no significant issues with the current practice. Agencies need to conduct an internal review to determine whether there are issues with the timely completion and review of such applications and reconsider the documents they use in their roadway design. Because urban areas have different requirements than rural environments and each project has a unique context may require such varied approach in design excep- tion practices and efforts to streamline it could be unique to each agency. INTRODUCTION Background Every roadway design starts with the intent to provide a facility that will be safe, address mobility concerns, accommodate the physical and social en- vironment, and be financially feasible. To achieve such a design, designers rely on design guidelines and policies. Sometimes, however, it may not be practical to conform to all of these guidelines. For ex- ample, it is possible that adherence to a certain geo- metric specification may create environmental im- plications, affect historical structures, be economically unfeasible, or affect a community in an undesirable way. As a result of the increased density of devel- opment and populations in built urban environments as well as the need to develop more contextual de- signs to address community concerns these conflicts may occur more often in urban environments. To ad- dress such issues, the roadway design may need to de- viate from the prevailing guidelines and policies and thus processes to address this need to be established. An understanding of the impacts of such alter- native designs on both the safety and the operational character of the roadway is essential. The AASHTO publication, A Policy on Geometric Design of High- ways and Streets (commonly referred to as the Green Book) provides guidance to the designer by refer- encing a recommended range of values for critical di- mensions for the design of new alignments and those undergoing major reconstruction (1). These guide- lines (not standards) permit sufficient flexibility to en- courage distinctive independent and appropriate de- signs for specific situations. However, there are two areas of concern regarding this flexibility. The first deals with the notion that the guidelines have been developed mainly for “idealized” design circum- stances, typically without right-of-way, utility, his- toric, built urban form or other constraints that are frequently encountered in urban areas. The second deals with the degree of uncertainty that such flex- ibility can bring, because there is a lack of data that quantify potential trade-offs when evaluating design options. Even though the Green Book indicates that the referenced guidelines provide for a safe, com- fortable, and aesthetically pleasing roadway, there is little information regarding the safety and operational consequences that may result from deviating from the recommended range of values. An aspect that should also be noted is the need for closer cooperation from the outset of the project 3

among the various agencies as well as with the af- fected stakeholders and parties. Such interactions could identify potential areas where non-conforming designs will need to be addressed and develop solu- tions that are more appropriate and within the con- text of the project area. Central to this is the devel- opment of a purpose and need statement that is agreed on by all involved parties (agency representatives and stakeholders), where the goals of the project are clearly identified and provide the basis for develop- ing a contextual design. These issues are more apparent in large cities where following the Green Book guidelines is often not feasible. Limited right-of-way, human and natural environmental issues, pedestrian and bicyclist accom- modation, and aesthetic concerns often require a more flexible design to be utilized. It is, therefore, often nec- essary to develop solutions that do not conform to cur- rent practices (based on the Green Book, other local guidelines, or standards) and require the use of design exceptions. Such processes often result in longer times for project completion and sometimes in higher costs. It is therefore important to understand why such de- partures from the values of existing practices may be needed, identify processes that successfully manage such design procedures, and determine means that could assist designers for projects in large cities to streamline this process and develop a timely proce- dure for addressing design exceptions or variances. Report Objective The objective of this report is to address these is- sues through a nationwide survey of both cities and state DOTs. This report addresses the following focus areas: • Processes followed by agencies in developing and completing design exceptions, including re- sponsibilities and documentation requirements; • Magnitude of the issues to be addressed, such as frequency of revisions, number of applica- tions, project delivery implications, and con- straints requiring design exceptions; • Level of required documentation dependent on contextual issues; • Efforts for improving the process followed; and • Documentation of successful and problematic design flexibility and variance requests. The outcome of this study will provide transporta- tion agencies with an understanding of the existing processes and identify means for proactively address- ing design issues in a collaborative manner between cities and DOTs to deliver the appropriately contex- tual project. Report Organization To complete this effort a two-phased approach was undertaken. The first phase involved a litera- ture review and the development of a survey ques- tionnaire to be used to solicit information on the state of the practice of design exceptions for built urban environments. In the second phase, the sur- vey was administered to collect the required data to be used in the analysis to develop the report on best practices on design flexibility considerations for large cities. A 69% response rate (27 of 39) was ob- tained from surveying both local agencies and state DOTs. This report documents the findings of both perspectives. This report begins with a literature review iden- tifying major areas of concern and then presents the state of the practice regarding design exception in built urban environments as it was manifested through the survey. Case studies provide in-depth examples of these issues. The final chapter pro- vides a summary of the report and suggests future study topics. LITERATURE REVIEW Introduction Roadway projects in built urban environments often pose specific challenges to designers and plan- ners. Such projects typically present a full range of geometric and traffic operational problems, coupled with increasingly restrictive environmental and right- of-way constraints. These projects may require the use of flexibility in design and variation from the tradi- tionally used values or solutions. Among key issues typically faced by designers are: • The reconstruction of older roads inevitably requires addressing outdated geometric design guidelines. For example, a road previously de- signed to 60 mph criteria may no longer meet current criteria for the same design speed. • Many such projects are often driven by the need to expand road capacity or changes in traffic patterns. The addition of lanes or introduction of turning lanes to accommodate increased 4

forecasted traffic is often a key issue owing to right-of-way or community cohesion. • Pedestrian and bicycle activity across or along the roadway. Such activity is particularly im- portant for roadways with commuter or tourist and commercial destinations. • Restrictive right-of-way often limits the ability to achieve the desired cross-section dimensions and elements. Even where right-of-way is avail- able, context-sensitive issues such as existing trees, sidewalks, and building set-back lines become concerns to key stakeholders. • On-street parking issues often require special attention. • Large vehicles (heavy trucks and tour buses) are more often encountered in large cities and re- quire special considerations in roadway design. • Public involvement issues dealing with com- munity vision and commercial interests often lead to differences in priorities between local and commuter traffic. • Cost. In summary, such projects typically require ad- justments in the design aspects and impact the choices that affect cross-section elements. Several agencies dealing with urban roadways have developed typical cross sections, but they have not tied these to the vertical and horizontal alignment issues included in the Green Book. The literature review conducted for this report examined existing design policies and past research that dealt with design flexibility and exceptions attempting to relate them to the issues presented previously regarding roadway design in built urban environments. Urban Design Guides Project constraints and context-sensitive solutions that do not meet applicable design standards are often implemented through the use of the design exception process. The design exception process is discussed in further detail in the next section. Although design exceptions provide an avenue to implement non- standard design practices, they often can increase the work load and potentially impact the proposed solu- tion. NCHRP Synthesis 316 surveyed all state high- way agencies and of the 46 agencies responding, all identified one or more specific problems in the process (2). These included lack of supporting documenta- tion for the request, cost-intensive and cumbersome resource requirements for the design exception, and inadequate guidance from the state transportation agencies (STAs) or FHWA in support of design ex- ception requests. To streamline or eliminate the need for design exceptions, some agencies have developed independent design guidelines for urban areas to pro- vide additional guidance and standards for meeting typical urban constraints. The majority of urban street design guides are published by local or regional planning agencies. Ex- amples of those identified by this preliminary litera- ture review included: • Metropolitan Council, St. Paul, Minnesota (3) • City of San Diego, California (4) • City of Stockton, California (5). In addition to these local agencies, the Maryland State Highway Association has published the guide When Main Street is a State Highway, to address is- sues relating to the presence of high-volume high- ways at urban centers (6). A similar guide was de- veloped by the Oregon DOT dealing with street design for state roads through urban areas (7). The ITE has also recently published Context Sensitive Solutions in Designing Major Urban Thoroughfares for Walk- able Communities, which presents potential solutions to addressing the constrained environment of urban areas (8). In addition to constraints presented by the urban landscape, these guides often attempt to ad- dress the additional challenge of incorporating other modes of transportation as well as provide a space for residents to live and play. As such, urban street de- sign guides often focus on additional elements other than those contained in traditional roadway design guides. Morrish et al. (9) focused on five design ele- ments, primarily concentrating on the roadway cross section and the connections to the community and adjacent land uses. These elements include street and right-of-way issues, access and land use con- nections, and planning concerns for community con- nections (Figure 1). These issues are very similar to the problems identified earlier and demonstrate the difference in needs for urban environments when compared with rural areas. Moreover, the right-of-way constraints imposed by “immovable” objects (i.e., buildings) are typically the most fundamental dif- ference in the roadway design between urban and rural areas. These local and national guides and recommended practices have varied guidelines as well as multiple goals and objectives. The following list attempts to 5

summarize only some of the benefits associated with urban-specific street design: • Reduce impervious street surface to improve water quality; • Balance the needs of emergency vehicles with everyday traffic concerns; • Promote an interconnected street network that includes pedestrian and bicycle access; • Create a more attractive and safe pedestrian environment; • Reduce peak energy demand through the in- corporation of urban heat island reduction mea- sures into the appropriate site and street design guidelines; • Promote pedestrian- and transit-friendly design of city streets; • Provide capacity and operational improvements to streets to minimize congestion and focus on persons and goods, not just vehicles; • Create a more aesthetic environment for the community; • Provide an integrated planning approach, one that gives equal consideration to land use and transportation throughout the planning process, which is preferable to independent planning; • Encourage pedestrian and bicycle travel; and • Reduce the potential for speeding. Design Exceptions Roadway projects where design element trade- offs are to be considered typically incorporate a full range of geometric and traffic operational problems, coupled with increasingly restrictive environmental constraints. These problems may require variation from the normally used guidance values or traditional solutions. However, one should keep in mind that every project is unique in terms of the geometric conditions, traffic, safety history, purpose and need, project context, community character, and public pri- orities. What is reasonable or may work in one loca- tion may not be appropriate in another for any num- ber of technical or context-sensitive reasons. Some projects require adjustments in horizontal and verti- cal alignment, whereas others may require choices that affect cross-section elements and design speed. The literature review conducted for this synthesis examined these major categories and the findings are presented here as they may be applicable to de- sign variances. The reader is encouraged to review NCHRP Synthesis 299, which presents an extensive 6 Figure 1 Urban design elements (9).

literature review on geometric design elements for improving safety and operations (10). The Green Book provides guidance and control values for the design of new alignments or those un- dergoing major reconstruction that allow flexibility. For most control values, the Green Book indicates that the recommended ranges provide a safe, com- fortable, and aesthetically pleasing roadway. How- ever, there are cases where additional flexibility is necessary and therefore the design exception or vari- ance process is available. This allows other design values to be considered for a specific element to pro- vide a proper fit to the situation. The exception process allows for adjusting almost all elements of geomet- ric design and, as determined by the project, may re- quire both state and federal approval. It should be pointed out that there is little research that quantifies such decisions and their impact on safety (2,11). The use of design exceptions can frequently be avoided by varying other parameters of the project (e.g., de- sign speed) that may affect the specific design ele- ment. For example, the use of a lower design speed allows for the use of shorter stopping sight distances and thus the length of required vertical curves could be reduced. The concept of guidelines was emphasized even more in Flexibility in Highway Design (12), a recent publication by the U.S.DOT and is even further stressed in the AASHTO Guide for Achieving Flex- ibility in Highway Design (13). These publications attempt to reinforce the concept of design flexibility and to deemphasize the approach of using the max- imum or highest values in the Green Book regard- less of project characteristics and context. This pre- vious approach typically leads to roadways with less emphasis on the design’s impact on human and nat- ural environments and increases the possibility of creating wide swaths of pavement cutting through communities and natural resources. This approach has typically been justified by arguing that it results in a design with increased safety; however, this has not been always quantified. A critical review of de- sign guidelines by Hauer (14) stated that several de- sign guidelines are based on empirical data from sev- eral decades ago, but some have not been validated through research. Also, research demonstrated that other design values lower than those suggested in the Green Book work well to achieve flexibility in design while balancing the concerns of safety and capacity. As noted earlier, a design exception process has been in place for several years, initiated by FHWA for roadway projects that could not meet the current design criteria (15). This policy identified 13 elements that could be considered for a design exception: de- sign speed, lane width, shoulder width, bridge width, structural capacity, horizontal alignment, vertical alignment, grade, stopping sight distance, cross slope, superelevation, vertical clearance, and horizontal clearance (other than clear zone). Design exceptions are becoming more common in roadway design and have been increasing in fre- quency in several states to address designs that do not meet typical design values. Little research has been conducted to date to understand the implica- tions of design exceptions on either the safety or the operational performance of a project. A design ex- ception is the course of action by which a designer can introduce a design value other than what would have been typically used for the specific roadway and it is often in contrast to the traditionally used range of values for that geometric element (2). This process makes it possible for roadways to be con- structed or reconstructed in areas that may not allow for the full use of or typical design values. Frequently, 3R (resurfacing, restoration, and rehabilitation) proj- ects may require the reconstruction of sections that were designed several years ago with design values that were valid then but not now. In these cases, up- grading the entire roadway to current values may be extremely difficult or not economically feasible. How- ever, the consideration of improving roadway geom- etry is often required to address safety, capacity, en- vironmental, or community issues. Therefore, such projects with any of these limitations often require designers to seek a design exception (16). Common design exceptions required in redesign of existing highways typically deal with reduced available right- of-way, requiring adjustments to cross-section ele- ments and modification of the design speed (16). The most frequent design elements utilizing design ex- ceptions are horizontal alignment (changes in the ra- dius of the curve), shoulder widths, stopping sight distance, lane width, and design speed (2). Design exceptions are necessary when desired de- sign values cannot be achieved in a project. According to the survey conducted for NCHRP Synthesis 316 (2), transportation agencies in 24 states indicated that they have more strict guidelines for design than those provided in the Green Book. In these states, design exceptions are required to move the project forward when the lower-end values are not achievable. The same survey also indicated that a small number of 7

STAs (20%) predict an increase in design excep- tions because of demanding regulations and context- sensitive design issues (2). Design exceptions have been viewed as a poten- tial legal liability to designers and STAs. Excluding six states, sovereign immunity has been eliminated across the nation and tort laws have been enacted, leaving designers in the situation of being legally re- sponsible for designs they create (17). Highway de- sign has been considered a discretionary function and deviation from design guidelines does not nec- essarily constitute negligence; however, there is al- ways the potential that jurors may interpret that de- parture from design guidelines as such. An important concept in utilizing design exceptions is to ensure that documentation of all decisions exists to assist the highway agency in lawsuit cases. Design Factors The Green Book lacks background information sufficient for understanding the safety and opera- tional implications of combinations of critical geo- metric features. It should be noted that A Guide for Achieving Flexibility in Highway Design provides some information on these areas but also lacks any quantifiable relationships for the values of various design elements (13). Another Green Book topic re- quiring additional background information for de- signers centers on the relative importance of various geometric elements on safety. It is apparent that not all geometric elements have the same impact on safety and operational effectiveness, and the selected design value can affect additional elements. For example, the choice of a design speed of 45 mph or less for a road allows the designer to use a smaller minimum curve radius, a narrower clear zone, a shorter verti- cal curve, and shorter sight distances than a higher design speed. In this case, the impact is significantly greater than when selecting a single design element to be adjusted. Moreover, roadway elements can exert varying degrees of influence even through a single element. For example, lane width will exert an impact on a two-lane roadway different from that exerted on a four-lane roadway. Therefore, a prior- ity list is needed to identify the relative significance of each geometric element. Given the current defini- tion of the design speed, it appears that it is probably the most important design element to be selected, be- cause it has the potential to affect the values used for almost all other design elements (1,13). As noted previously, design speed is probably the most important element of roadway design, because it affects almost every roadway aspect. Most studies dealing with safety and speeds typically consider speed limit and thus little is known about the influ- ence of design speeds on safety. It could be assumed that there are some relationships between design speeds and speed limits; however, because of the methods used to establish speed limits in many states, it is not feasible to develop a systematic relationship. Current design approaches for highway design em- phasize speed as a surrogate for quality and efficiency. This approach could be viewed as reasonable for rural areas where high speeds are frequently desirable, but not for roads in built urban environments. An issue that has recently received additional at- tention is the impact of design speed on creating a consistent driving environment and thus affecting operating speeds. To reduce such inconsistencies between design and operating speed, the use of op- erating speed as a supplement to the design speed has been discussed (18). A recently completed NCHRP study attempted to document relationships among design, operating, and posted speeds and to propose recommended changes for their use in design (19). The research concluded that design speed had no significant influence on operating speeds, and that there was no definable relationship between the two. The study also noted that one-third of the 40 states that responded to the mail-out survey have used the expected operating speed to select the design speed, and that approximately one-half have used the an- ticipated posted speed. An important finding was the negligible impact on operational speeds of the pres- ence of curb and gutter in built-up areas. This find- ing could be of significance here, because curb and gutter design has been used in addressing right-of- way constraints in built urban environments. The need to re-evaluate the use of design speed as suggested in the Green Book has also been argued and European practices can be used as models (20). The differences between design and operating speeds were also discussed in Special Report 214: Design- ing Safer Roads, where procedures for addressing this problem were discussed (21). Disparities between speeds create some of the problems in design con- sistency and are central to resolving that issue. A re- cent report that examined the relationship between operating and design speeds for urban areas concluded that the use of operating speeds as a controlling design speed produces more consistent designs (22). 8

Design Goals An issue relative to operating and design speeds is the underlying concept of mobility; local and non- local drivers tend to conceive this term differently. It is reasonable to assume that non-local drivers de- fine mobility as higher speeds that reduce travel times. On the other hand, local drivers may consider high speeds detrimental to the community as well as a safety issue. Traditional design practices aim to pro- vide “as high a design speed as is practical” and equate such a choice as “surrogate for design qual- ity” (13). The basic premise for such designs is the desire to reduce travel times and these designs are often viewed as the “best or safest possible approach” (13). A report that examined geometric design prac- tices in European countries revealed that part of the general philosophy for highway design and project development is to tolerate higher congestion and slower speeds to achieve safety goals (23). Design solutions that reduce motor vehicle speeds or reduce the space available to vehicles may increase trip times, a consequence often viewed as appropriate by Euro- pean agencies. They consider design solutions that promote higher travel speeds as contributory to more severe crashes and, indeed, as detrimental to road- way safety. Therefore, developing roadway designs that could balance these two issues may require the use of trade-offs in the perceived values of various design elements. The idea that wider and more lanes improve mo- bility is also a concept that should be revisited. The de- sirable level-of-service values suggested in the Green Book should be viewed as starting points and not as absolute values to be achieved at the expense of other concerns. It is reasonable to assume that striving to achieve a certain level-of-service often requires more lanes than may be needed if a roadway was designed in a manner that enforces lower operating speeds. An additional benefit of lower speeds is the poten- tial reduction in the severity level for crashes, as is the case for roundabouts (24,25). In the United States, the concept of mobility is often understood as providing roadways that will assist motorists in driving as quickly as possible through an area. However, this approach may be contrary to the desires of commu- nity or may be in conflict with environmental con- cerns owing to a wider roadway footprint. It is pos- sible for example that a four-lane design may achieve the desired level-of-service letter grade but with a higher expected operating speed. A two-lane alter- native design may result in a lower level-of-service grade but with a lower operating speed. In this ex- ample, if the objective is to impact operating speeds, the reduced level-of-service should be secondary. Proper evaluation of such alternatives is essential in determining the appropriate design and demonstrates the trade-offs that need to be considered. To find the most appropriate solution to mobil- ity problems in a project area, it is a necessity to ex- amine a wide range of design choices that consider all relative issues to address the specifics of the proj- ect. Design choices should first be developed on a conceptual scale and include all reasonable capital, policy, program, management, and modal alterna- tive solutions to the mobility problem(s). To prop- erly examine the full range of design choices, the project team must identify and consider all natural, human, and cultural resources within the project area. This will allow for an understanding of the context and the issues to be addressed and provide for de- veloping a contextual solution. At the same time, several alternative designs must be developed and evaluated while developing the design options. This will allow for addressing and capturing all issues as they may relate to the project. Stakeholders and citi- zens advisory committees could be solicited to assist in the development and evaluation of design options to produce a solution that satisfies the community needs and desires. Although it is not expected that the stakeholders and public will begin to draw lines on paper or provide detailed designs, it is crucial to understand community preferences. This will assist the designer when faced with trade-offs and choices within the design constraints. Understanding these preferences is the key in delivering a solution truly sensitive to its context and community. Safety Trade-Offs A number of studies have examined cross-section elements and attempted to develop models or rela- tionships that could estimate safety implications from varying individual components. The findings of NCHRP Report 330 indicated that the overall safety of urban arterials typically improves after the im- plementation of strategies that involve the use of narrower lanes (26). It should be noted that most of these strategies involved projects with restricted rights-of-way and arterials with speeds of 45 mph or less. The study also concluded that even though the use of narrower lanes, when considered alone, may 9

increase specific crash types (such as sideswipes), the presence of other design features, such as the ad- dition of two-way left-turn lanes, may offset these increases and produce an overall improved safety. This study also underscores the potential of interac- tive effects between various design elements and suggests careful evaluation of the use of narrower than typically used lanes. A more recent review of the safety in geometric design standards by Hauer (14) critically examined the belief that adherence to design standards is di- rectly linked to safe roadways. This review indicated that design guidelines have an inherent safety level; however, little is known about the impacts of using flexibility in applying them in roadway design. An- other issue that was identified by Hauer was the no- tion that there are two different kinds of safety. One could be called nominal safety and is measured “in reference to compliance with standards, warrants, guidelines, and sanctioned design procedures” (14). Substantive safety is another kind based on the road- way’s actual safety performance—that is, crash fre- quency and severity. Designing nominally safe roads does not ensure a substantive safe roadway as well, because adherence to values of each guideline does not necessarily produce a safe design. Several of the studies examined here focused on developing models that investigate and quantify the substantive safety changes from altering design dimensions (27). An- other aspect of safety that was noted by Fambro et al. (28) is the concept that safety is a continuum and not a single yes or no decision. This implies that a change in the value chosen for a particular design el- ement “can be expected to produce an incremental, not absolute change in crash frequency and severity” (28). However, it is necessary to better understand the effect of these incremental changes on safety lev- els. Such efforts are essential in understanding and quantifying the substantive safety of a roadway. This is more critical for projects where design flexibility is considered. Stakeholders do not easily accept de- signs that are considered nominally safe, but require the evaluation of design alternatives which may de- viate from the nominal designs. An additional concept that merits attention is that of the presence of a tipping point, which is the principle that small changes have little or no effect on a system until a crucial point is reached (29). This concept, which has been extensively used in epi- demiological research, could also be used in road- way design because of the available flexibility in the values of design elements. It could be hypothesized that safety and operational consequences from alter- ing the values of design elements while remaining within the suggested Green Book values are minimal and thus do not create significant problems. More- over, small departures from these values may have no significant impact until they reach a critical point where safety will be significantly affected. Therefore, this safety consequence tipping point for any single design value may not be detectable. Highway design typically requires a multiple-level assurance by pro- fessional engineers that the approved design will not result in unacceptable levels of safety consequence. Projects requiring a design exception could be con- sidered as those that are the furthest from the most desirable design value. NCHRP Project 15-22 noted that the small deviations reported in the case studies analyzed indicated that in general a conservative ap- proach is taken when considering values that vary from traditional design (30). A recently completed guide on design exception mitigation strategies provides a review of the areas where such variance can be applied and identifies means that could be used as solutions to address de- sign exceptions and variances (31). It should be noted that the report focuses on rural areas, but there are some concepts that could be used in built-up areas as well. For example, varying cross-section elements to manage speeds when design speed is considered as a varying element can be used both in urban and rural environments. An issue that is also discussed is the lack of documentation of known effectiveness of several of the proposed mitigation measures and the need for developing means and measures to address this issue. Significant research efforts have been devoted to the development of the Highway Safety Manual that will be able to quantify the effects of such design el- ement trade-offs (32). This document will provide needed guidance on the safety implications from se- lecting specific values for various design elements and allow designers to better understand what the im- plications from their design choices are. The manual will provide estimates of the number of crashes per year for various roadway facilities based on func- tional classification. Urban arterials are among the facilities to be included in the manual. It is apparent that a designer will often need to weigh different alternatives and determine the most appropriate solution for the project while consider- ing all requirements. This could require balancing of 10

safety needs with mobility, community desires, en- vironmental constraints, and fiscal considerations. There is very little guidance on how to balance these elements and select an appropriate solution. That each project is unique and has specific demands on de- veloping the final solution creates additional com- plexity on this issue. Weighted score techniques and priority goal evaluations are techniques that could be used in resolving such conflicts. Summary The literature review identified a few design guides used by various local agencies for addressing typical environments in urban areas. However, these guides address only one aspect of roadway design (cross-section dimensions) without considering the remaining contributing design elements such as ver- tical and horizontal alignment and design speed. Con- versely, the Green Book addresses these issues but does not fully consider the implications and con- straints that urban environments pose on the designs proposed. Therefore, a balance between these two approaches is needed. A number of constraints for urban environments were identified at the beginning of this section that could pose problems for roadway designers. The ex- isting flexibility in the design guides allows for ad- dressing these constraints, but often there is a need for design exceptions to be considered and included in the process. Even though this approach is not desirable be- cause it has the potential to increase the time and cost of the project, it may be necessary in order to develop an appropriate design. The literature review identified areas where this process can be used and allow for more appropriate designs. However, very little work has been completed that attempts to quantify the rela- tionships between safety and design variances. Most of the work completed has focused on two-lane rural roads and rural environments in general. Even though some of the experience is applicable in urban envi- ronments, there is inadequate information regarding any association between typical and other than typical design values for urban constrained environments. SURVEY Procedures In addition to the review of the literature and cur- rent design documents, a survey was conducted to collect information on the current practices of de- sign exceptions in built urban environments (see Appendix A for survey; web-only: http://trb.org/news/ blurb_detail.asp?id=10263). The results of the survey could identify where the industry stands in regard to this issue and then could be used in identifying areas of success as well as areas where additional attention is needed. There- fore, the results of this survey form the foundation for any suggested practice changes and identifica- tion of future areas of study. The survey was designed to identify the current practices of large city transportation agencies (such as departments of public works and engineering) and state DOTs regarding flexible design practices and the potential use of design exceptions in their areas. Each potential candidate was contacted by telephone to verify willingness to complete the survey and for the accuracy of e-mail contact information. The in- tention was to report the answers from two perspec- tives to help determine in their responses how proac- tively addressing design issues in a collaborative manner could result in improving the design excep- tion process for the local agencies and deliver an ap- propriately contextual project. The survey format was created as an online web application with the ability to collect and re- port all responses. The survey participants were sent an e-mail invitation identifying the scope of the survey and providing the web address for the survey completion. The survey was launched in March 2008 and a three-week time period was given to respond. To increase the number of re- sponses, e-mail reminders were sent to those who had not completed the survey a week before the deadline. A second e-mail was sent after the dead- line to those who had not completed the survey as a reminder with an extension to increase the num- ber of respondents. The survey instrument is pre- sented in Appendix A and the survey results are in- cluded in Appendix B (web-only: http://trb.org/news/ blurb_detail.asp?id=10263). The survey was structured in a way that provided information regarding (1) an overview of the agency’s responsibility, (2) the need for design variances, (3) the design exception process and required docu- mentation, (4) the agency’s efforts to improve the process, and (5) identification of potential case stud- ies. The results of the survey are presented organized in these areas. A total of 39 agencies were identified and survey requests were e-mailed to all potential respondents. 11

Eighteen surveys from local agencies were returned and nine responses were received from large cities’ DOTs yielding a response rate of 69%. Big city lo- cations and agencies completing the survey are listed in Table 1, a full list of respondents is provided in Appendix C (web-only: http://trb.org/news/blurb_ detail.asp?id=10263). These agencies represent a reasonable geographic representation, as well as a mix of large- and medium- size urban centers, thus creating an illustrative sam- ple of responses. Most local agency responses came from their departments of public works. State DOTs that responded are noted. It should be noted that in the following sections the terms “local” or “city” agency refer only to these agencies, and their responses are examined separately from those of the state DOTs. The study sought sim- ilarities and differences in the practices between local agencies and state DOTs and the cases where these practices varied are presented. The emphasis was on the implication of design exceptions for the local agencies and thus greater emphasis was placed in the responses of these agencies for their use in un- derstanding proactive approaches in a collaborative manner. Survey Results Agency Responsibility Overview This section examines the areas of responsibility for the agencies regarding roadway design, construc- tion, maintenance, and/or operations (see Appendix B for survey results). The objective of this section is to identify the extent of responsibility and involvement in the project development process, as well as the guidance and manuals used in the design process. As anticipated, for most city agencies the primary responsibility lies with local roads and the agency is almost equally involved in all aspects of the project development phase (Figure 2). All responding agen- cies appear to be involved in the design phase of local roads indicating a significant involvement for such projects. A few agencies are involved in vari- ous aspects of the project development process for roads in the National Highway System and all are equally involved in all phases defined. A larger num- ber of agencies are involved in state road projects and these agencies are mostly involved in the design and construction phases. Only one local agency noted that it is responsible for interstate projects and is equally involved in all project phases, which was the 12 Table 1 List of cities and agencies responding State City Local Transportation Agency State DOT AZ Phoenix Engineering and Architectural Services Department Roadway Engineering and City Manager’s Office CO Denver Department of Public Works DC Washington District Department of Transportation DC DOT FL Jacksonville Department of Public Works Division of Engineering and Construction Management FL Miami Department of Public Works GA Atlanta Public Works/Office of Transportation Office of Urban Design HI Honolulu Department of Transportation Services Design Branch MA Boston Boston Transportation Department MO Kansas City Department of Public Works Design Division NE Omaha Department of Public Works Roadway Design Division, Department of Roads OH Columbus Public Services/Transportation Division Office of Roadway Engineering Services OH Cleveland Department of Public Service Office of Roadway Engineering Services TX Dallas Department of Public Works and Transportation TX Houston Department of Public Works and Engineering VA Virginia Beach Department of Public Works Location and Design Division WA Seattle Department of Transportation—Division of Street Design Office Design and Office of the Director

Washington D.C. DOT. Of the state DOTs respond- ing only one, the Arizona DOT, noted that it was in- volved in the planning, design, and construction of local roadways. City agencies are mainly dependent on consul- tants to complete their designs managed mainly by the agency (16 of those 17 responding). The remain- ing respondents indicated that design is completed either by the city agency or state DOT personnel. For designing roads, most responding agencies use de- sign standards, whereas a few use design guidelines. It should be noted here that there is a difference be- tween standards (mandatory practice) and guide- lines (recommended practice but not mandatory) as they are applied in design and probably reflect the level of flexibility that agencies are inherently al- lowed. The remaining local agencies reported the use of a combination of other guidelines and stan- dards without specifying the extent of each. In con- trast, most of the responding state DOTs use design standards and fewer use design guidelines when de- signing urban roadways. Most city agencies have developed their own de- sign documents for urban streets that are based pri- marily on the Green Book and fewer other research and/or guidelines. Two agencies noted that they use the Green Book, and one indicated the use of the American Public Works Association (APWA) Spec- ifications and Criteria. The majority of state DOT re- spondents noted that they use both state DOT and local agency guidelines or develop independent de- signs to fit the situation. Of interest here is also the response to the question regarding the perceived level of flexibility provided with the design docu- ments used by the agency. Most city agencies noted that there is enough flexibility within the document that will not require the agency to request a design exception. Moreover, a closer examination of those who responded as lacking flexibility had identified mainly the Green Book as their design guidance. These answers indicate that city agencies that have developed their own design guidance have consid- ered the need for providing flexibility in design and thus allowed for in their documents, whereas those that use guidance from others (Green Book or APWA Specifications and Criteria) believe that there is little flexibility built into these documents. Of interest are the responses of the state DOTs where half noted that they use a combination of state and local guide- lines and those are the state DOTs that work with local agencies that have developed their own design guidelines. It was identified that city agencies dealing only with local street systems were more inclined to main- tain their own guidelines or standards. Of the respon- dents who are responsible only for local roads, two did not have agency standards. However, of those agencies that participated in the planning, design, construction, maintenance, and/or operation of por- tions of the state, national highway, or Interstate sys- tem, almost half used the Green Book, state agency, or other standards. This may indicate that local agen- cies dealing with other agencies more often defer to those standards, whereas local agencies can adopt or 13 Figure 2 Level of responsibility by project phase and road class.

develop standards to better fit the needs of the local street system. A review of various agency guidelines also indicated a wide breadth of information contained within the guidelines as well as the manner in which it was presented. The majority of design documents reviewed contained engineering details and speci- fications. However, geometric design details such as horizontal and vertical alignment, right-of-way widths, etc., were frequently absent. One agency, which identified itself as being involved in both local and state highway works, maintained com- prehensive standard drawings; however, design limits were established in the local planning and zoning code. This could be indicative, however, of local policies driving local streets through subdivi- sion and zoning review, whereas state roadways are handled by state agency criteria as noted previ- ously. Based on survey responses, it was noted that the city of Virginia Beach, Virginia, which is only involved in local street systems, has a set of stan- dards and guidelines approaching the breadth and depth as that of Washington, D.C., which designs and operates all roadways within their jurisdiction. Therefore, no discernible pattern was identified in the depth and breadth of the agency guidelines based on the roadways for which they have respon- sibility. Excerpts from select design guidelines and standards of responding agencies are provided in Ap- pendix D (web-only: http://trb.org/news/blurb_detail. asp?id=10263). Need for Design Variance This section of the survey identified the design practices used by the agencies and the extent of in- novation applied in designs. It focuses on determin- ing where design exceptions are most often used and why, as well as identifying the most frequent design elements used in these exceptions. This will provide an understanding of the areas where possibly greater emphasis is needed in determining the levels of flex- ibility required as well as identifying areas of addi- tional study to improve these practices. For the ques- tions where an opinion was sought, a composite score was developed that allowed for determining the relative importance of the various choices. Respon- dents were asked to identify items based on their fre- quency of use and this guided the scores. A score of 3 was assigned for answering “Always,” 2 for “Fre- quently,” 1 for “Occasionally,” and 0 for “Never.” These composite scores were used to rank the vari- ous items and determine their relative importance. The first focal area is the identification of the typical constraints within a project that could require flexibility (Figure 3). The responses indicated that the most frequent constraint (based on the composite score) was that of the right-of-way, followed closely by needs to accommodate pedestrians and bicyclists. One can also assume that often the need to accom- modate pedestrian and bicycle needs and facilities may be related to right-of-way issues and thus this constraint becomes a very critical issue, especially 14 Figure 3 Scores for typical constraints.

for large urban areas. The data in Figure 3 indicate that most of the remaining constraints had close com- posite scores (all ranging between 21 and 19), indi- cating that these are the most frequent constraints that the agencies have to deal with and all are some- what equally important when there is a need for flex- ibility to be considered. Of interest is the comparison of local agency responses to those of the state DOTs. State DOT respondents only once identified a constraint as “Always” requiring a design exception, whereas six of the agency personnel observed a constraint as being frequent. This may be indicative of the increased constraints that must be dealt with by the agencies of built urban environments. The reasons that may require design flexibility were also identified to allow for an understanding of the rationale for considering such an approach (Figure 4). Accommodations of pedestrians was the reason with the highest score (25 points) followed closely by cost (24 points). There were four reasons tied for the third position (22 points); safety, opera- tional, right-of-way impacts, and bicycle accommo- dation. These reasons represent a mixture of design features, all of which have a significant impact in de- veloping a project solution and may often require balancing to reach this solution. Therefore, it is rea- sonable to assume that all of these factors will be those with the highest scores: a point that was vali- dated by the responses obtained. The final element of this section dealt with the identification of the design elements that are most frequently used when design flexibility is sought (Figure 5). The most frequent element is the lane width followed by grade and shoulder width. The presence of lane and shoulder width as the most fre- quent design elements is consistent with the previous answers where the right-of-way restrictions were the most frequent constraint. Moreover, the need for pedestrian accommodations as well as space for bi- cycles may be reflected in the need to consider flex- ibility for both lane and shoulder widths. The presence of the grade in the top three elements is somewhat sur- prising, given that agencies that have a hilly terrain within their jurisdiction did not score this highly. Most of the remaining design elements had similar scores and all were very close. Design Exception Process This section of the survey focused on identify- ing the design exception process followed by the agency, the required documentation for completing the process, and the means for addressing potential conflicts. The results from this section will allow for determining the amount of work required by the agency to complete the process and determine po- tential areas for improvement. The methods used for resolving conflicts will provide an insight on how the agency deals with potential problem areas and potentially identify efforts to avoid such conflicts. All respondents that completed this section of the survey indicated that their agencies consider design exceptions when project elements do not conform to 15 Figure 4 Scores for reasons requiring design flexibility.

the applicable design guidelines/standards. This in- dicates that the design exception practice is widely considered and, by extension, used by various agen- cies. However, one-half of the respondents indicated that they consider design exceptions for all projects, whereas the others reported that there is a selection process on the types of projects where the design ex- ception is used. This underscores the presence of insti- tutional differences throughout the country on how policies and practices are applied. The local agencies that noted that they do not apply design exceptions to all projects were queried to identify the types of projects that they do not con- sider design exceptions (Figure 6). All do not con- sider design exceptions for the following project types listed in the survey: intersection improvements, mod- ifying design elements to address pedestrian issues, altering or lowering design speed, using traffic calm- ing devices, and for preventive maintenance, and many do not consider modifying design elements to 16 Figure 5 Scores for design elements requiring flexibility. Figure 6 Number of agencies not considering design exceptions by project type.

address bicyclist access. Two agencies noted that they do not consider design exceptions for right-of-way restrictions and new roadway construction. Most local agencies that do not consider design exceptions for all project types have their own design guidelines. This finding could support the assumption that these agencies feel comfortable with the existing flexibil- ity in their design documents and do not see the need for design exception in any but a few project types. One-half of the agencies noted that they use only the 13 criteria provided by FHWA in their design exceptions. Of these agencies that used additional criteria for design exceptions, all identified opera- tional capacity as a factor and five of the six identified clear zone. This indicates that the existing criteria cover adequately the spectrum of needs for design exceptions, but the consideration of the other two (operational capacity and clear zone) may be added in the list to provide the flexibility needed to these agencies. The question regarding the level of flexi- bility of the criteria as they compare with the values of the Green Book showed that most agencies believe that they are less strict or the same. This indicates that the processes that are in place adequately address flexibility. The respondents were equally divided on the issue of how design exceptions are prepared. One- third noted that they are prepared by the local agency staff responsible for the design, another one-third in- dicated that agency staff supervising the design is re- sponsible, and the remaining one-third noted that the consulting firm responsible for the design prepares these documents. For most city agencies design ex- ceptions are submitted in the design phase of the proj- ect development process, whereas the others submit them during the planning of the project. The project type and size will probably have an impact on the time required for the completion of the documentation of the design exception. However, the largest number of agencies estimate that the required time varies between one and two months, whereas one-fourth noted a short time for preparation (less than one month). An equal number of respondents noted longer periods (2 to 6 months and for more than 6 months). There is a need for data to be collected by the agency when considering a design exception. The re- spondents were asked to identify the frequency with which they collect and use various data types for their design exception process (Figure 7). The results show that the most frequently used information are traffic volumes (score of 27) followed by cost estimates (score of 23) and prior examples (score of 20). The presence of traffic volumes and cost estimates as the most frequently used data items is not surpris- ing, because both are integral to the project design. The use of prior examples appears surprising but may be indicative of the desire of the agencies to build a library of cases that could be used to justify future de- sign exceptions. The review process of design exceptions was also evaluated and indicated that for most agencies the re- view is completed in-house by the agency’s design team or group. Four agencies noted that they also have a separate design exception committee and two 17 Figure 7 Scores for data used in design exceptions by agencies.

have only this as a review. The others use either the agency’s legal office or the design team or group to review the exception. Among those agencies that conduct an in-house review, most rely exclusively on the agency’s design team or group to complete the re- view. Those agencies that have a review conducted by their DOT use the DOT’s design exception com- mittee or the DOT’s design team or group. Finally, one agency consults with its planning department and submits it to the city council for a resolution. For one-half of the local agencies the review time is relatively short (under three months), whereas for another one-third the review is between three and six months. Of interest here is that the local agency that noted a long time for reviews (more than nine months) has reviews conducted by their DOT, whereas the other agency with a relatively long time for reviews (six to nine months) has an in-house process. It ap- pears that an in-house process could result in short review times and longer if the review is conducted by other agencies, such the state DOT. In contrast, all state DOT respondents indicated that review time is less than two months, with most indicating less than one month. This is reflective of the concept that design exceptions completed by a state DOT are re- viewed internally and thus short times can be achieved with such internal reviews. The review time could also be related to the num- ber of design exceptions that a local agency typically completes within a year. One-half of the local agen- cies complete fewer than 5 design exceptions per year, whereas an equal number of the remaining agencies complete 11 to 20, 21 to 50, and more than 50 design exceptions per year. There appeared to be no correlation between the number of design excep- tions and review time, with the only notable obser- vation that the agency with the longest review time was also one of the two with more than 50 design ex- ceptions per year. The approval rate of design exceptions and the means to address non-approved design exceptions is also of interest to determine the level of rework that may be required by an agency. One-fourth of the agencies have an approval rate of more than 75%, whereas an equal percent of agencies has a very low approval rate (fewer than 25%). One-third of the re- maining agencies have an approval rate between 51% and 75%. When design exceptions are not approved, most agencies redesign the project. One-fourth of the agencies negotiate a solution for the project and one agency resubmits the application (assuming the issues are corrected). An examination of the approval rate and means to address non-approvals did not produce any notable relationships. For example, those agen- cies that negotiate a solution have varied percent- ages of approval (0% to 25% and 51% to 75%). The only notable trend was that those agencies that have fewer than five design exceptions per year were those that negotiate a solution when approval is not granted and the review was conducted in-house by the agency’s design team. Efforts to Improve This section of the survey focused on identify- ing the efforts that a local agency has initiated to ad- dress potential issues with design exceptions as well as document any lessons learned from the practices applied. This will allow for determining those efforts that are notable and could be used by other agencies in improving their design exception process. This section also defines the perceived implications from design exceptions as documented by the respondents. Although many local agencies review projects (as will be discussed later), most have not conducted a review of their design exception process. This is not surprising, because this is an additional activity that the agency needs to undertake and probably sees no benefit in completing. Among the agencies that have conducted a review of their processes, there are those that have fewer than five design exceptions per year and have no significant review time (three to six months) and one that has reasonable approval rate (51%–75%), whereas another has a low approval rate (under 25%). One agency that has more than 50 de- sign exceptions per year has also completed a review of its design exceptions, whereas the other has not. Given these observations, there is no discernable pat- tern for when an agency needs to conduct such a re- view and what may be the elements that could trig- ger such a review. The effect that design exceptions have on various aspects of the project delivery was also evaluated. It should be noted however that this is a subjective opinion rating and there was no effort to quantify the responses. Less than half of the agencies responding noted that the project delivery time was increased, whereas others reported that it remained the same or that it decreased. With regard to project costs, most agencies reported that they decreased, whereas others noted that they increased, and the remaining respon- dents stated that they remained the same. On the issue 18

of potential liability, most agencies believe that li- ability increased, whereas the rest believe that it remained the same. It may be that the agencies that have conducted a review of their design practices may have quantified these aspects and therefore an effort was undertaken to review these opinions for the agencies that had conducted such a review. There was no discernable pattern in responses among those agencies having conducted a review, indicating the subjectivity in the correlation of their responses. The only consistent trend was that a majority of respond- ing agencies noted that project costs decreased. Another aspect of design exceptions that was eval- uated was the perception of their effect on the result- ing safety level, operational performance, and modal choices. About one-third of the local agencies noted that safety improved; an equal amount noted that it remained the same; and the rest noted that it deterio- rated. It should be noted that those local agencies that noted a safety improvement had conducted a safety analysis after the project completions, whereas among those that noted deterioration only one had completed such a study. One-third of the agencies responding stated that the operational performance improved, deteriorated, or remained the same. Finally, almost half of the agencies noted that modal choice either remained the same or that it was improved and none indicated that it deteriorated. These responses appear to indicate that design exceptions have, in general, a neutral to positive effect on the project performance regarding the aspects examined here. In contrast, state DOT respondents indicated poorer performance through design exceptions. One- half indicated increased project delivery time, with half identifying no change, and two-thirds indicated an increase in liability exposure, with one-third no change. Several of the agencies noted that they are in- volved in a variety of efforts to improve their design processes for timely resolution of potential issues. One-half indicted that they have initiated the devel- opment of improved guidance and the clarification of the controlling criteria. Training of personnel is another area that several agencies are targeting as a means for improving their process. Other efforts in- clude development of a uniform document format and a checklist for documents to be included with the application, as well as meetings of the design ex- ception committee and use of electronic format sub- mittal. All of these efforts appear to indicate that there is a variety of efforts that could be undertaken to improve the process and each agency should de- termine what may be the most appropriate approach for its operation. For example, one agency indicated that they use several of these methods, whereas an- other noted that the number of design exceptions they submit is too small to require a review of their policies and processes. Among the comments re- ceived regarding lessons learned and efforts to im- prove, the most common theme was development of checklists and clarification of the ranges for the cri- teria to be used. Once design exceptions are granted and the proj- ect is completed, several agencies review the per- formance of the project with respect to safety and operational performance to determine the effect of the design exception. This appears to be is a positive approach on determining the impact of design ex- ceptions and a practice that should be recommended. Such evaluations could allow for the development of possible areas of success and create precedence for future applications. Even though most agencies re- ported that they do not use past design exceptions as a precedent, this evaluation could appear to provide the support needed to use them as documentation for developing a knowledge base for future applications. A variety of lessons learned with a common theme were noted by the respondents: the need for dialogue and communication among the various agencies re- sponsible for the project and the timely submission of the documentation. Respondents noted the limited involvement of other agencies that could have an im- pact on the project delivery or influence the final so- lution. The need to present design exceptions to the public was also noted and most agencies discuss them at public meetings. This allows the public to under- stand what may be the implications for the choices made and assist in the final decision. The timeliness and completeness of the submission of the design exception documents are also an important aspect and could have significant implications on the on- time delivery of the project and perhaps even cost. Early identification of elements that may require flex- ibility is required to avoid any time delays, and a clear understanding of the process and required documen- tation will reduce potential delays. CASE STUDIES To provide a context for the need and imple- mentation of design exceptions, case studies for further analysis were identified through the survey 19

instrument. It should be noted that case studies where design exceptions were used were difficult to iden- tify. The following case studies examine the Kuhio Avenue Improvement project in Honolulu, Hawaii, the Route 734 improvement project in Virginia, and the Dixie Highway Improvements Project in Park Hills, Kentucky. Each of these projects had to im- plement modifications to the minimum cross-section standards to meet the overall goals of the project. An issue that should be noted here regarding case studies was the lack of any readily available docu- mentation for any of these cases as well as others that were investigated. This points to the lack of doc- umentation of past examples as well as the absence of any database that systematically catalogues and examines possible design exceptions. As was noted in the survey responses, very few agencies document their design exception efforts and this has resulted in providing such a small number of cases from the agencies that completed the survey. Case 1: Kuhio Avenue Improvement Project Project Purpose Kuhio Avenue is a four-lane major collector in Waikiki Honolulu, Hawaii. As the avenue bisects downtown Waikiki, it has a posted speed limit of 25 mph. The Kuhio Avenue project extended ap- proximately 1.2 miles from Kapahulu Avenue to Kalakaua Avenue. At the time of the initial study, Kuhio Avenue carried more than 21,600 vehicles per day. It is the main public transit corridor in Waikiki with six city bus routes that travel in both di- rections on the avenue. In addition, the avenue is used by automobiles, commercial (tour) buses, private buses, taxis, delivery vans and trucks, bicyclists, and is a major pedestrian corridor as well. The Kuhio Avenue Improvement Project was undertaken as the result of recommendations made in the city’s Waikiki Livable Community Project (WLCP). A key policy adopted by the WLCP study was a “pedestrian first” policy for Waikiki. The WLCP study documented a high level of pedestrian activity on Kuhio Avenue that included transit pa- trons, commercial tour bus passengers, taxis stop- ping for patrons, and truck drivers making deliver- ies to businesses, as well as pedestrians shopping or walking to the beach. It was observed that at times the public sidewalk would become so congested that people were spilling off the sidewalks and walking in the nearest travel lane to the sidewalk. The situa- tion presented a pedestrian safety concern and the study concluded that certain sidewalk areas along the corridor needed to be widened. The Kuhio Avenue Improvement Project at- tempted to address three main issues of the corridor. 1. Creation of a more pedestrian-friendly envi- ronment by widening and improving side- walks. 2. Provision of beautification of the avenue through landscaping, including the planting of a significant number of trees and the creation of a landscaped median. 3. Installation of bus pull-outs to improve traffic flow and create a better transit environment. Project Constraints Owing to the mature nature of the corridor and its heavy use, the project experienced several constraints on the final design. • Traffic flow and circulation constraints. Al- though the project was intended to narrow the right-of-way to accommodate sidewalk widen- ing and beautification, traffic flow and circu- lation remained an important consideration. • Public transit constraints. Proposed bus pull-outs along the avenue required careful consideration of sidewalk space. Often, certain transit stops along the avenue have significant numbers of riders waiting, affecting sidewalk space and pedestrian circulation. • Beautification constraints. Proposed project landscaping and planting of trees required care- ful consideration of the location of the trees that would balance pedestrian shade while mini- mizing the amount of sidewalk space required. Requested Variance To accommodate the competing demands of the project, the design team requested narrowing the travel lanes on Kuhio Avenue from 12 ft to 10 ft whenever possible in limited locations. This reduc- tion was necessary to widen the sidewalks in certain sections of the avenue and to implement bus pull- outs (see Figure 8). The narrowing was controver- sial because tour bus operators in Waikiki pointed out that tour buses from mirror to mirror are very close to 10 ft wide. Public transit vehicle drivers, large delivery truck drivers, and public and private refuse operators were also concerned about the travel lane width because of the width of their vehicles. 20

Lessons Learned Based on the “Pedestrian-First” policy, which was adopted by the WLCP project, the project recom- mended that high priority be placed on pedestrian ac- cess and safety for Kuhio Avenue. The recommended improvements were part of an extended community- based process that was undertaken by the WLCP to receive extensive public input on making Waikiki more “livable.” This included public meetings, an extensive two-day public workshop, and neighbor- hood meetings. Through the public process undertaken by the WLCP project, an administrative decision was made to implement improvements that would primarily benefit pedestrians and transit service. Although there were both internal and external debates on the trade- offs of narrower lanes versus wider sidewalks, it was ultimately believed that the improvements would benefit Waikiki as well as retail, hotel, and residen- tial land uses along Kuhio Avenue. Since the implementation of the Kuhio Avenue project, the department has had very few complaints about lane width and few accidents. Conversely, com- pliments have received from visitors, residents, and visitor industry executives on the “greening” of the avenue and making the public sidewalk space more pedestrian-friendly. Case 2: Route 734 Improvement Project This project is included here for two reasons. First, bridge replacements are a common project for several local agencies and dealing with existing right-of-way limitations is a common issue facing local agencies. Moreover, the need for bridge re- placement as it has been documented by AASHTO is a high-priority area and, therefore, means (such as design exceptions) to increase the number of such replacements with limited funds are considered appropriate. Second, the bridge lies within the ju- risdiction of the Pittsylvania County municipal au- thorities and there are several large cities (e.g., Los Angeles) that have such rural roadways within their responsibility. Project Purpose Route 734 is a two-lane local road in Pittsylvania County, Virginia. Route 734 has a 35 mph speed limit with an average daily traffic of 1,028. Traffic is pri- marily local and commuter traffic, with 12% truck traffic. Pedestrian or bicycle facilities are not pro- vided on Route 734. The purpose of this project was to reconstruct an existing bridge over Cane Creek as well as improve the bridge approaches to meet the improved structure. Total project length was 0.417 mile. The project was led by the Virginia DOT. Project Constraints The final design of the bridge reconstruction was constrained primarily by two factors. First, limited right-of-way existed for environmental and right-of- way impacts owing to the narrow width of the old bridge structure. Second, many environmental con- straints existed as a result of the creek crossing. Ex- isting shoulder widths on the roadway and bridge structure were less than current standards and widen- ing to meet current standards would significantly im- pact both constraints. 21 Figure 8 Before (left) and after (right) visualizations of Kuhio Avenue.

Requested Design Exception To minimize impacts and project costs, a design exception was requested to reduce shoulder widths to match existing conditions. Lessons Learned The project was successful in implementing the needed bridge improvements while minimizing right- of-way impacts and environmental impacts. The key to success was that driver expectations were not changed as the improvement was designed to meet existing conditions instead of being upgraded to meet standards. In the absence of an identified safety issue at the site, this solution provided an improved road- way and bridge with minimal impact and costs. Case 3: Dixie Highway Access Improvements Project Purpose Dixie Highway (US-25) in Park Hills, Kentucky, is classified as an arterial in northern Kentucky pro- viding north–south access to downtown Covington, Kentucky, and Cincinnati, Ohio. The highway paral- lels Interstate 75 and often serves as a diversion route during times of congestion and/or accidents. Through the project area, Dixie Highway is a four-lane undi- vided highway that serves as a transitional area into residential neighborhoods in the city (see Figure 9). This project sought to provide access from Dixie Highway to a 200-unit residential development situ- ated on the hillside overlooking the cities of Coving- ton and Cincinnati. At issue with the project was the local planning commission requirement that full- length auxiliary turn lanes be provided on all arterial streets. Although Dixie Highway was classified as an arterial street, traffic volumes were observed to be considerably less on this section of the roadway than in other more commercial districts to the south. This section of Dixie Highway was included in a 2006 multi-jurisdictional study, called The Dixie Fix, which examined improvements along the corri- dor (see Figure 10). The transitional area through the city of Park Hills was identified to be the subject of a “road diet,” which would reduce the northbound (downhill) lanes from two to one, provide two lanes coming up the hill (southbound), and provide a cen- ter two-way left-turn lane within the existing pave- ment limits. Project Constraints The primary constraint on the corridor was a lim- ited right-of-way and severe topographic constraints owing to steep grade and hillside stability issues on both sides of the roadway. Requested Variance To reduce development costs, the developer re- questing access also requested a variance of the local 22 Figure 9 Northbound (left) and southbound (right) views of Dixie Highway near the project.

regulations to waive the requirement for auxiliary left- and right-turn lanes into the development. Road- way widening to provide the required auxiliary turn lanes would have required considerable cost owing to the need for an expanded retaining wall on the west side of the highway. The initial waiver was de- nied and the project soon stalled. To retain the proposed development and provide reasonable and safe access to and from Dixie High- way, a plan was developed that would retain the ex- isting pavement width, but would begin to imple- ment the lane configuration changes proposed under the corridor study. This flexible design approach proved to be acceptable to local and state agencies, as well as provided a reasonable access alternative to the developer of the project. Lessons Learned The regulations initially upheld by the local agen- cies while striving for improvements in the opera- tions and safety of the local street system failed to provide the required flexibility for the situation. As such, the low traffic volumes of this section of Dixie Highway as well as the nature of the roadway con- text that served as a transition area to residential areas, were not taken into account and the roadway was treated the same as other sections where volumes were tripled and that served heavy industrial and commercial areas. If the regulations were to be fol- lowed it would have led to substantial cost as well as unneeded improvements and associated impacts. The presence of a comprehensive corridor plan that took into account the special needs and context of each area proved invaluable in directing future im- provements along the corridor. Providing the ability of detailed planning efforts and studies to be incor- porated into or override existing general regulations will allow for a much more tailored and appropriate design. Since this project, a memorandum of agreement has been signed by all local agencies, the Kentucky Transportation Cabinet, Ohio Kentucky Indiana Re- gional Council of Governments, and the Northern Kentucky Planning Commission that adopts all of the recommendations of The Dixie Fix to be used in directing future development. CONCLUSIONS Roadway designers are called on to balance sev- eral factors that require attention within the roadway environment and context. Mobility aspects, safety concerns, natural and human environment elements, cultural resources, and financial constraints often play an important role in determining the roadway context and in shaping the final design of the road- way. To address all of these issues, designers often have to provide a solution with design elements that may not conform to those typically used and there- fore there is a need for deviating from these values. The approach for achieving this balance is docu- mented through design exceptions or variances and this process has been used to address such departures from design standards and guidelines. The built urban environments may pose additional and more fre- quent constraints on roadway designs owing to the existing buildings and other structures where rights- of-way could be at a higher premium. Therefore, de- sign exceptions for roadways in built urban envi- ronments may pose an additional problem as a result of their potential higher frequency for consideration as well as possible implications from their application. 23 Figure 10 Proposed Dixie Highway cross section, The Dixie Fix, 2006.

This report addressed these issues through a na- tionwide survey of both city and state DOTs and con- centrated on the following focus areas: • Processes followed by agencies in developing and completing design exceptions, including re- sponsibilities and documentation requirements; • Magnitude of the issues to be addressed, such as frequency of revisions, number of applica- tions, project delivery implications, and con- straints requiring design exceptions; • Level of required documentation dependent on contextual issues; • Efforts for improving the process followed; and • Documentation of successful and problematic design flexibility and variance requests. The survey conducted for this report aimed at defining issues relative to the proactive use of design exceptions and identifying collaborative practices that could enhance this process and reduce potential conflicts between transportation agencies. The sur- vey focused on examining how design exceptions are used by local transportation agencies in built urban environments, the documentation process followed, the time requirements for their completion, and the efforts undertaken to improve the practice. The find- ings of the survey are summarized here along with reported benefits, issues, and potential improvements to the process. Agency Responsibility Primary responsibility for local roads for large urban centers resides with local transportation agen- cies. These local agencies are often involved in all phases of the project development process. A smaller number of local agencies are involved with either state roads or roads in the National Highway System. These responses indicate that the role of these agen- cies is appropriate and within their purview. The de- lineation of such responsibilities and understanding of the boundaries of jurisdictions between local and state agencies is fundamental in defining the role and area of influence for each agency. For designing roads, most local agencies use de- sign standards, whereas a few use design guidelines. It should be noted here that there is a difference between standards (mandatory practice) and guide- lines (recommended practice, but not mandatory) as they are applied in design and probably reflect the level of flexibility that agencies are inherently allowed. The remaining agencies noted the use of a combination of other guidelines and standards with- out specifying the extent of each. The use of guide- lines appears to also provide a greater flexibility to local agencies when design exceptions are consid- ered as it was noted in the correlation of the fre- quency of design exception applications and design documents used. This may be a practice that local agencies need to review to improve their design exception process and allow for greater flexibility if needed. It should be also noted here that al- though the Green Book provides adequate flexibil- ity for design, this flexibility may be inadequate when urban designs are considered as documented by the responses of a few agencies. The responses indicated that agencies that have developed their own design guidance have considered the need for providing flexibility in design and therefore have addressed the issue, whereas those that use guid- ance based on other design documents believe that there is little flexibility built in these documents. It therefore could be recommended that agencies need to review their documents to determine their level of flexibility, and they may consider developing their own. Need for Variance There are a number of constraints for which design flexibility may be needed for a project and under- standing their influence is critical in determining the reasons for variance from the typical design. The survey respondents identified right-of-way restric- tions or limitations as the primary reason for consid- ering flexibility. The need to accommodate pedestri- ans and bicyclists also featured high in the reasons that may require design flexibility and thus under- scores the potential influence that non-motorized users have on the design of urban streets. The limited right-of-way and the need to accommodate all users of the facility in urban areas may be the most criti- cal aspects of roadway design and thus require sig- nificant flexibility and, often, innovative design. The reasons noted by the respondents as requiring flexi- bility included a mixture of design features, opera- tional efficiency, financial constraints, and safety considerations all of which have a significant impact in developing a project solution and may often re- quire balancing to reach this solution. The answers conform to a priori expectations, because all are fac- tors that have to be considered. 24

Lane width is the design element for which de- sign flexibility is sought most frequently. This was anticipated, because this is the primary element that could have a significant impact on right-of-way issues and the accommodations of bicyclists and pedestri- ans. Shoulder width was also among the top three elements, indicating its influence on right-of-way issues and accommodation of the other users. There- fore, agencies may need to revisit their design doc- uments dealing with lane and shoulder widths if they desire to reduce the number and frequency of design exceptions and provide greater flexibility. Design Exception Process The design exception practice is widely used by local transportation agencies of built urban environ- ments. Of interest was that one-half of the respon- dents indicated that they consider design exceptions for a select type of projects, whereas the others noted that they consider them for all project types. The agencies noting that they consider design exceptions for select types of projects have their own design guidelines. This finding could support the assump- tion that these agencies feel comfortable with the ex- isting flexibility in their design documents and do not see the need for design exception in any but a few project types. The 13 criteria provided by FHWA for use in de- sign exceptions are adequate for most agencies. A few agencies reported the use of operational capac- ity and clear zone as additional criteria incorporated in their documentation process. Therefore, it can be assumed that the existing criteria adequately cover the spectrum of needs for design exceptions; how- ever, the consideration of the other two (operational capacity and clear zone) may be added to the list to provide the flexibility needed to these agencies. The question regarding the level of flexibility of the cri- teria used as they compare with the values of the Green Book showed that all agencies but one believe that they are less strict or the same. This indicates that the processes that are in place adequately ad- dress flexibility. The questions regarding the data to be collected for use in the design exceptions included the antic- ipated types; that is, traffic volumes and cost esti- mates, both of which are integral to the project design and solution. Of interest here is the prominence in the scores of the use of prior examples, because it could be viewed as an indication for compiling past prac- tices and using them to support and justify future de- sign exceptions. From this perspective, documenta- tion and maintenance of past design exceptions is a positive aspect and a practice to be commended. Design exceptions for local transportation agen- cies in built urban environments are mostly within the agency’s staff supervision and responsibility even for agencies that rely on consultants to complete their design. Design exception applications are mostly submitted in the design phase of the project devel- opment process. This is probably a reasonable point in the project development process to address the need for flexibility and therefore there is no need for altering the practice. This approach will also provide a timely identification and resolution of possible problem areas and thus reduce any potential delays owing to the review of the application. The project type and size will probably have an impact on the time required for the completion of the documenta- tion and approval of the design exception. Most of the respondents noted that the time required for the preparation of the documentation is short (less than two months), indicating that this is not a time- consuming process. The issue to be emphasized here is that there is timeliness for considering and submit- ting design exceptions and that this should be identi- fied as early in the process as possible. The appro- priate time for considering design exceptions will vary for each project and the project team needs to identify when design exception documentation should be sub- mitted to avoid any potential delays and cost increases. The review of design exceptions is completed by most local agencies in-house by the agency’s de- sign team or group even if it was prepared by the agency’s staff. In this case, agencies noted that they have a separate design exception committee or that the documents are reviewed by the agency’s legal office. A few agencies have a review conducted by their DOT (some using the state DOT’s design ex- ception committee and others the DOT’s design team or group). A significant aspect of the review process is its timely completion for reducing any potential time delays for the project. For one-half of the local agencies the review time is relatively short (under three months), whereas for another one-third the re- view is between three to six months. It is reasonable to assume that an in-house process could result in short review times and longer if the review is con- ducted by other external agencies, such as the state DOT. The review time could also be related to the number of design exceptions that an agency typically 25

completes within a year; however, there appears to be no correlation between the number of design ex- ceptions and review time. Efforts to Improve One can assume that efforts to improve a process start with a review of current practices and the identi- fication of areas that need to be addressed. However, most agencies responded that they have not con- ducted a review of their design exception process. This could be either an indication of the lack of staff to complete this effort or the low number of design exception applications. The latter assumption was verified by two agencies that have not conducted a review because they have fewer than five design exceptions per year and short review time (three to six months). The responses provided did not allow for the identification of a pattern regarding when an agency needs to conduct a review of their prac- tices and what may be the indications that could initiate the process. The effect that design exceptions have on vari- ous aspects of the project delivery was also evalu- ated; however, the data provided did not allow for developing a pattern regarding their effect on proj- ect delivery time, costs, or potential exposure to lia- bility. The liability issue was one that was noted in a few comments and it may be an area of concern for transportation agencies. Of interest here is that even though most agencies noted that the delivery time of the project was increased, they also noted that proj- ect costs were decreased. The survey results indi- cated that design exceptions may delay a project but have no increase on project costs. Another aspect of design exceptions that was evaluated was the per- ception of their effect on the resulting safety level, operational performance, and modal choices. The responses indicated that design exceptions have, in general, a positive effect on the project performance regarding the aspects examined here. Implications on safety are always a concern and most agencies noted that there was no deterioration of safety as a result of the application of the design exception. Several of the agencies noted that they are in- volved in a variety of efforts to improve their design process for timely resolution of potential issues. These efforts include the development of improved guid- ance, clarification of the controlling criteria, and training of personnel. All of these efforts could pos- itively affect both timely preparation and review of design exception applications. Moreover, this vari- ety of approaches indicates that each agency should determine what may be the most appropriate ap- proach to undertake to improve their design excep- tion process. Among the comments received regard- ing lessons learned and efforts to improve, the most common theme was development of checklists and clarification of the ranges for the criteria to be used. The concept of establishing problem-solving ses- sions among the agencies involved was not specifi- cally mentioned as an effort to improve. However, such meetings have the potential to resolve problem cases as they appear without creating time delays and cost increases. A feedback loop that allows for the determina- tion of lessons learned and identification of efforts to improve the process is important in every improve- ment effort. Several agencies indicated that they con- duct a review of the project performance with respect to safety and operational performance to determine the effect of the design exception applied. This is a positive approach to determining the impact of de- sign exceptions. Such evaluations could allow for the development of possible areas of success and create precedence for future applications. A variety of lessons learned were noted by the respondents with a common theme: the need for dialogue and com- munication among the various agencies responsible for the project and the timely submission of com- plete documentation. Respondents noted the limited involvement of other agencies that could have an impact on the project delivery or influence the final solution. The timeliness of the submission of the de- sign exception documents is also an important as- pect and could have significant implications on the on-time delivery of the project. Early identification of elements that may require flexibility is required to avoid any time delays as well as a clear understand- ing of the process and required documentation will reduce potential delays. Future Study Needs This report provided a review of the design ex- ception practices for local transportation agencies in built urban environments. Even though a reasonable understanding of the state of practice as it exists could be gleaned from the findings of this study, there are additional topics of interest relative to this issue that 26

can only be addressed by additional research. The size, type, context, and number of projects that an agency deals with may partially explain the great variability noted in the responses of the agencies. However, the comments received could also indicate that the vari- ability may be the result of knowledge gaps or docu- ments used. Therefore, the following topics are rec- ommended for future studies. The survey noted that very few agencies have an understanding or have completed a study that docu- ments the benefits of design exceptions. The respon- dents were divided on whether they will improve, de- teriorate, or leave the same various aspects of the project. Therefore, a study that will develop a process for evaluating the benefits of preparing design ex- ceptions by establishing performance measures and metrics is needed. Another area of concern is the documents used for design and the lack of clarification of the impacts of the various elements used in design exception applications. The anticipated Highway Safety Man- ual (32) will provide some needed guidance on the safety implications of various design element choices and may facilitate clarification of the im- pacts of design choices. However, this manual will not address all aspects of roads in built urban envi- ronments that large city transportation agencies deal with such as “share the road” and “transit first” poli- cies. Therefore, a critical review of these needs should be conducted to identify areas of potential needs. Training was a consistent theme noted among the efforts to improve. Several agencies are currently in- volved in such efforts and identifying a model that is successful may be of interest to other agencies. Therefore, a study could be undertaken to identify these efforts and synthesize successful elements of various programs to develop a tool that could be used by other agencies. An element that has not been explored adequately is the level of interaction between the state metro- politan planning organization and transportation agen- cies for large cities. Each agency has a specific role to fulfill; however, there is the potential for signifi- cant overlap when the transportation system for the cities is within the influence realm of the state met- ropolitan planning organization. Therefore, a study identifying these relationships might be undertaken to determine the means to improve them, if there is found to be such a need. The issue of liability and exposure to it owing to the use of design exceptions is another aspect that respondents identified as an area of concern. There is no study that correlates tort claims to projects where design exceptions were applied. Therefore, a study could be initiated that will determine whether this is a true or perceived issue and then associate the agency’s potential exposure to risk and tort liability to various aspects of tort claims. That several agencies have developed their own design documents could be an indication of the need for a document, new or to supplement to the Green Book, for addressing urban roadway designs. It may therefore be the time to critically evaluate the pro- posed roadway and street guidance provided in the Green Book. Such a study can determine whether it actually addresses the design of such roadways and streets and identify areas where additional research is needed. This report attempted to identify the state of prac- tice for local transportation agencies of built urban environments regarding their approach and issues with design exceptions. In general, the findings show a varied approach and no significant issues with the current practice. Agencies need to conduct an inter- nal review to determine whether there are issues with the timely completion and review of such applica- tions and reconsider the documents they use in their roadway design. The proposed studies noted previ- ously will also assist in developing a more robust and streamlined process and help agencies determine when and how design exceptions should be com- pleted. However, because urban areas have differ- ent requirements than rural environments and each project has a unique context may require varied ap- proaches in design exception practices and efforts to streamline it could be unique to each agency. REFERENCES 1. A Policy on Geometric Design of Highways and Streets, American Association of State Highway and Transportation Officials, Washington, D.C., 2001. 2. Mason, J. and K. Mahoney, NCHRP Synthesis of Highway Practice 316: Design Exception Practices, Transportation Research Board, National Research Council, Washington, D.C., 2003, 82 pp. 3. Urban Sites BMP Manual, Metropolitan Council, St. Paul, Minn., 2001. 4. Street Design Manual 2002, San Diego, Calif., 2002. 5. Street Design Guidelines, Stockton, Calif., 2003. 27

6. When Main Street Is a State Highway, Maryland De- partment of Transportation, Baltimore, 2003. 7. Main Street: When a Highway Runs Through it: A Handbook for Oregon Communities, Oregon Depart- ment of Transportation, Salem, 1999. 8. Context Sensitive Solutions in Designing Major Urban Thoroughfares for Walkable Communities, Institute of Transportation Engineers, Washington, D.C., 2006. 9. Morrish, W., C. Swenson, and F. Dock, Design and Development Principles for Livable Suburban Arte- rials, Research Project 99025, Center for Trans- portation Studies, University of Minnesota, Min- neapolis, 2004. 10. Fitzpatrick, K. and M. Wooldridge, NCHRP Synthe- sis of Highway Practice 299: Recent Geometric De- sign Research for Improved Safety and Operations, Transportation Research Board, National Research Council, Washington, D.C., 2001, 134 pp. 11. Stamatiadis, N., K. Agent, and J. Pigman, Safety Im- plications from Design Exceptions, Paper 03-2185, presented at the 82nd Annual Meeting of the Trans- portation Research Board, Washington, D.C., Jan. 12–16, 2003. 12. Flexibility in Highway Design, Report FHWA-PD-97- 062, Federal Highway Administration, Washington, D.C., 1997. 13. A Guide for Achieving Flexibility in Highway Design, American Association of State Highway and Trans- portation Officials, Washington, D.C., 2004. 14. Hauer, E., “Safety in Geometric Design Standards I and II,” in Conference Proceedings of 2nd Interna- tional Symposium on Highway Geometric Design, Mainz, Germany, 2000. 15. Design Standards for Highways, Federal-Aid Policy Guide, 23 CFR 625.1, Federal Highway Administra- tion, Washington, D.C., Oct. 1997. 16. Neuman, T., C. Zegeer, and K. Slack, Design Risk Analysis, Volume I, Final Report, Report FHWA- FLP-91-010/3A4A1092, Federal Highway Adminis- tration, Washington, D.C., 1991, 128 pp. 17. Martin, S., “Design Exceptions: Legal Aspects,” Transportation Research Record 1445, Transporta- tion Research Board, National Research Council, Washington, D.C., 1994, pp. 156–160. 18. Krammes, R., “Design Speed and Operating Speed in Rural Highway Alignment Design,” Transporta- tion Research Record: Journal of the Transportation Research Board, No. 1701, Transportation Research Board, National Research Council, Washington, D.C., 2000, pp. 68–75. 19. Fitzpatrick, K., P. Carlson, M. Brewer, M. Wooldridge, and S. Miaou, NCHRP Report 504: De- sign Speed, Operating Speed, and Posted Speed Prac- tices, Transportation Research Board, National Re- search Council, Washington, D.C., 2003. 20. Krammes, R.A., et al., Horizontal Alignment Design Consistency for Rural Two-Lane Highways, Report FHWA-RD-94-034, Federal Highway Administration, Washington, D.C., 1994, 137 pp. 21. Designing Safer Roads; Practices for Resurfacing, Restoration, and Rehabilitation, Special Report 214, Transportation Research Board, National Research Council, Washington, D.C., 1987, 319 pp. 22. Poe, C.M., J.M. Tarris, and J.M. Mason, Relation- ship of Operating Speeds to Roadway Geometric Design Speeds, PTI Report 9606, Pennsylvania Transportation Institute, State College, Pa., 1996, 268 pp. 23. Stamatiadis, N., et al., International Scanning Tour on Highway Geometric Design, FHWA-PL-01-026, Federal Highway Administration, Washington, D.C., 2000, 46 pp. 24. Roundabouts: An Informational Guide, FHWA-RD- 00-067, Federal Highway Administration, Washing- ton, D.C., 2000. 25. Elvik, R., “Effects on Road Safety of Converting In- tersections to Roundabouts,” Transportation Research Record: Journal of the Transportation Research Board, No. 1847, Transportation Research Board of the National Academies, Washington, D.C., 2003, pp. 1–10. 26. Harwood, D., NCHRP Report 330: Effective Utiliza- tion of Street Width, Transportation Research Board, National Research Council, Washington, D.C., 1990, 55 pp. 27. Neuman, T., M. Schwartz, L. Clark, and J. Bednar, NCHRP Report 480: A Guide to Best Practices for Achieving Context Sensitive Solutions, Transportation Research Board, National Research Council, Wash- ington, D.C., 2002, 138 pp. 28. Fambro, D., K. Fitzpatrick, and R. Koppa, NCHRP Re- port 400: Determination of Stopping Sight Distances, Transportation Research Board, National Research Council, Washington, D.C., 1997, 107 pp. 29. Gladwell, M., The Tipping Point: How Little Things Can Make a Big Difference, Little, Brown and Com- pany, 2000, 304 pp. 30. Stamatiadis, N., J. Pigman, and D. Hartman, Safety Consequences from Flexibility in Highway Design, Final Draft Report, NCHRP Project 15-22, Trans- portation Research Board, National Research Council, Washington, D.C., 2004. 31. Stein, W. and T. Neuman, Mitigation Strategies for Design Exceptions, FHWA-SA-07-011, Federal Highway Administration, Washington, D.C., 2007. 32. Hughes, W., K. Eccles, D. Harwood, I. Potts, and E. Hauer, Highway Safety Manual, NCHRP Web Document 62, Transportation Research Board, Na- tional Research Council, Washington, D.C., 2004, 303 pp. 28

APPENDICES A THROUGH D Appendices A through D as submitted by the con- sultant are not published herein. These appendices are available as part of web version of this document at: http://trb.org/news/blurb_detail.asp?id=10263. The titles of the appendices are as follows: Appendix A Agency Survey Appendix B Survey Results Appendix C Respondents Appendix D Standards/Guideline Excerpts 29

Transportation Research Board 500 Fifth Street, NW Washington, DC 20001 These digests are issued in order to increase awareness of research results emanating from projects in the Cooperative Research Programs (CRP). Persons wanting to pursue the project subject matter in greater depth should contact the CRP Staff, Transportation Research Board of the National Academies, 500 Fifth Street, NW, Washington, DC 20001. COPYRIGHT PERMISSION Authors herein are responsible for the authenticity of their materials and for obtaining written permissions from publishers or persons who own the copyright to any previously published or copyrighted material used herein. Cooperative Research Programs (CRP) grants permission to reproduce material in this publication for classroom and not-for-profit purposes. Permission is given with the understanding that none of the material will be used to imply TRB, AASHTO, FAA, FHWA, FMCSA, FTA, or Transit Development Corporation endorsement of a particular product, method, or practice. It is expected that those reproducing the material in this document for educational and not-for-profit uses will give appropriate acknowledgment of the source of any reprinted or reproduced material. For other uses of the material, request permission from CRP.

Design Flexibility Considerations for Built Urban Environments Get This Book
×
 Design Flexibility Considerations for Built Urban Environments
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s National Cooperative Highway Research Program (NCHRP) Research Results Digest 337: Design Flexibility Considerations for Built Urban Environments explores issues related to the use of roadway design exceptions or variances. The report also examines processes designed to help manage the use of exceptions or variances, and highlights potential means to provide a timely procedure for addressing design exceptions or variances.

Appendices A through D to NCHRP RRD 337 were not published as part of the report. They are linked to below.

Appendix A Agency Survey

Appendix B Survey Results

Appendix C Respondents

Appendix D Standards/Guideline Excerpts

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!