Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

1   Contingency Factors to Account for Risk in Early Construction Cost Estimates for Transportation Infrastructure Projects Construction cost certainty is vital for a department of transportation (DOT) to effectively fund and manage an overall construction program. However, early estimates during the scoping stage are usually inaccurate because of the incompleteness of the project’s definition and design details. These uncertainties and risks necessitate setting a contingency amount for a project or program to allow for possible cost increases. Without a rational method for computing an appropriate contingency, most DOTs rely on the fixed percentages at each stage of project development; these are established by policy rather than by a rigorous analysis of a specific project’s risk profile. A reliable and consistent process, equipped with sound methods and tools for estimating construction contingency, is needed in order to increase a DOT’s confidence in its funding allocation and management decisions during project development and delivery. The objective of this project is to develop a guide for state DOT staff (those responsible for scoping projects) to use in order to improve their early construction contingency estimates for common project types with differing levels of complexity. This study focuses on early construction contingency among cost components that can impede the accuracy of project cost estimating. The guide will identify the project-related risks that are associated with significant cost impacts and that affect the accuracy of early construction contingency estimates as compared to actual construction costs. This guide (a) addresses the generally accepted definition of construction contingency and its components, which are aligned with the FHWA’s recent guidelines on probabilistic risk-based estimating; (b) provides specific descriptions of the major methods available for construction contingency estimation—from simple, deterministic methods to sophisti- cated, probabilistic methods; (c) presents the process of identifying and prioritizing poten- tial construction risks associated with a project using available DOT risk checklists and risk registers of historical projects from FHWA; (d) details the systematic process of risk-driven construction contingency estimating based on project-specific risks; (e) provides general guidelines on performing a construction contingency estimation using historical cost data available from DOTs to validate risk-based construction contingency estimates; and (f) provides guidelines on how to successfully track and monitor construction contingency by adopting an iterative risk analysis method during the project delivery process. S U M M A R Y

Next: Chapter 1 - Introduction »
Contingency Factors to Account for Risk in Early Construction Cost Estimates for Transportation Infrastructure Projects Get This Book
×
 Contingency Factors to Account for Risk in Early Construction Cost Estimates for Transportation Infrastructure Projects
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

Accurate early construction cost estimates of projects are important in order for state departments of transportation (DOTs) to effectively fund and manage the overall construction program. When cost estimates at the scoping phase of a project closely match construction costs, available funding is properly allocated within the program.

The TRB National Cooperative Highway Research Program's NCHRP Research Report 1025: Contingency Factors to Account for Risk in Early Construction Cost Estimates for Transportation Infrastructure Projects describes a method for developing estimates of contingency factors for common project-related risks that affect construction costs.

Supplemental to the report are a downloadable spreadsheet-based tool that can be used to calculate contingency ranges based on project type and a presentation summarizing the project.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!