National Academies Press: OpenBook
« Previous: Appendix E: Typical Draft Agenda for Agency Critique
Page 161
Suggested Citation:"Appendix F: Minnesota DOT Peer Exchange Agenda." National Academies of Sciences, Engineering, and Medicine. 2006. Final Report for NCHRP Report 574: Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction. Washington, DC: The National Academies Press. doi: 10.17226/22045.
×
Page 161
Page 162
Suggested Citation:"Appendix F: Minnesota DOT Peer Exchange Agenda." National Academies of Sciences, Engineering, and Medicine. 2006. Final Report for NCHRP Report 574: Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction. Washington, DC: The National Academies Press. doi: 10.17226/22045.
×
Page 162
Page 163
Suggested Citation:"Appendix F: Minnesota DOT Peer Exchange Agenda." National Academies of Sciences, Engineering, and Medicine. 2006. Final Report for NCHRP Report 574: Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction. Washington, DC: The National Academies Press. doi: 10.17226/22045.
×
Page 163

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

F-1 APPENDIX F MINNESOTA DOT PEER EXCHANGE AGENDA

F-2 Minnesota Cost Estimating Peer Exchange Best Western Maplewood Inn, Maplewood, Minnesota September 26 and 27, 2005 Noon Lunch provided, Best Western Dining Room 1:00 – 1:15 Introduction Mn/DOT & TTI 1:15 – 3:00 Presentations and Perspectives Cost Estimation and Cost Estimation Management Bob Winter, Division Director, District Operations Division Tom Sorel, FHWA Victor Barbour, P.E- Construction Unit North Carolina DOT Daryl Greer, P.E Transportation Engineering Branch Manager Kentucky DOT 3:00 – 3:15 Break 3:15 – 4:15 Presentations and Perspectives Cost Estimation and Cost Estimation Management Jack Young Structure Office Engineer/Division of Engineering Services CALTRANS Sio Ng, P.E, Cost Risk Estimating Engineer Washing State DOT 4:15 – 5:00 Wrap-Up/Prep for Day 2 Mn/DOT & TTI AGENDA – Day 1

F-3 AGENDA – DAY 2 8:00 – 9:50 National Cooperative Highway Research Program 8-49 Introduction and Agency Overview Stuart Anderson, TTI Strategies, Methods, and Tools Keith Molenaar, TTI 9:50 – 10:00 Break 10:00 – 11:30 Concurrent sessions: Planning - Keith Molenaar, University of Colorado, Section A Final Design--Cliff Schexnayder, Arizona State University Section B Programming and Preliminary Design, Stuart Anderson, TTI, Section C 11:30 – 12:15 Lunch 12:15 – 1:30 Concurrent sessions continued - return to sessions 1:30 – 1:45 Break 1:45 – 2:45 MnDOT response to presentations/small groups 2:45 – 3:00 Break (need to open room back up again) 3:00 - 3:30 General Session – small groups report back 3:30 – 4:15 NCHRP Researchers and DOT Panelists respond 4:15 – 4:30 Wrap Up Evaluation Mn/DOT & TTI

Final Report for NCHRP Report 574: Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction Get This Book
×
 Final Report for NCHRP Report 574: Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s National Cooperative Highway Research Program (NCHRP) Web-Only Document 98, Final Report for NCHRP Report 574: Guidance for Cost Estimation and Management for Highway Projects during Planning, Programming, and Preconstruction details the steps followed by the research team in the development of NCHRP Report 574: Guidance for Cost Estimation and Management for Highway Projects during Planning, Programming, and Preconstruction. NCHRP Report 574 examines highway cost estimation practice and cost estimation management with the goal of helping achieve greater consistency and accuracy between planning, programming and preliminary design, and final design. The Guidebook explores strategies, methods, and tools to develop, track, and document realistic cost estimates during each phase of the process.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!