Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
119 References AASHTO (2019). âAASHTOWare Catalog.â American Association of State Highway and Transportation Officials, Inc. AbouRizk, S. (2010). âRole of Simulation in Construction Engineering and Management.â Journal of Construction Engineering and Management, 136(10), 1140-1153. ACHP âRebuilding a Highway Reconnects a Divided Historic Community.â Advisory Council on Historic Preservation (ACHP). Adamowski, J., and Karapataki, C. (2010). âComparison of Multivariate Regression and Artificial Neural Networks for Peak Urban Water-Demand Forecasting: Evaluation of Different ANN Learning Algorithms.â Journal of Hydrologic Engineering, 15(10), 729- 743. ADOT (2007). âDesign-Build Procurement and Administration Guide.â Arizona Department of Transportation Construction Group, Phoenix, AZ. ADOT (2015). âChapter 8: Estimating Contract Time.â Arizona Department of Transportation. AGC (2011). Project Delivery Systems for Construction, Associated General Contractors of America (AGC), Washington D.C. Akatsuka, Y. (1994). âReview of Postconstruction Evaluation Procedures for Infrastructure Projects.â Journal of Management in Engineering, 10(1), 70-75. Alashwal, A. M., Abdul-Rahman, H., and Radzi, J. (2016). âKnowledge Utilization Process in Highway Construction Projects.â Journal of Management in Engineering, 32(4), 05016006. Allen, C., and Barnes, P. E. (2004). âSharing Experiences and Lessons Learned.â Public Roads, Federal Highway Administration. Anderson, S. D., Molenaar, K. R., and Schexnayder, C. J. (2007). NCHRP Report 574: Guidance for Cost Estimation and Management for highway Projects During Planning, Programming, and Preconstruction, Transportation Research Board. Antoine, A. L. C., Alleman, D., and Molenaar, K. R. (2019). âExamination of Project Duration, Project Intensity, and Timing of Cost Certainty in Highway Project Delivery Methods.â Journal of Management in Engineering, 35(1), 04018049. Apipattanavis, S., Sabol, K., Molenaar, K. R., Rajagopalan, B., Xi, Y., Blackard, B., and Patil, S. (2010). âIntegrated Framework for Quantifying and Predicting Weather-Related Highway Construction Delays.â Journal of Construction Engineering and Management, 136(11), 1160-1168. Arditi, D., Akan, G. T., and Gurdamar, S. (1985). âReasons for delays in public projects in Turkey.â Construction Management and Economics, 3(2), 171-181. Arditi, D., Tokdemir, O. B., and Suh, K. (2002). âChallenges in Line-of-Balance Scheduling.â Journal of Construction Engineering and Management, 128(6), 545-556.
120 Argyris, C. (1977). âOrganizational learning and management information systems.â Accounting, Organizations and Society, 2(2), 113-123. Ashley, D. B., Molenaar, K. R., and Diekmann, J. E. (2006). âGuide to risk assessment and allocation for highway construction management.â United States. Federal Highway Administration. Office of International Programs. Bae, J., Choi, K., and Oh, J. H. (2017). Multicontextual Machine-Learning Approach to Modeling Traffic Impact of Urban Highway Work Zones. Transportation Research Record, No. 2645, pp. 184â194. Bai, Y., and Burkett, W. R. (2006). âRapid Bridge Replacement: Processes, Techniques, and Needs for Improvements.â Journal of Construction Engineering and Management, 132(11), 1139-1147. Ballard, G., and Howell, G. (2003). âLean project management.â Building Research & Information, 31(2), 119-133. Barlow, J., and Jashapara, A. (1998). âOrganisational learning and interâfirm âpartneringâ in the UK construction industry.â The Learning Organization, 5(2), 86-98. Barraza, G. A. (2011). âProbabilistic Estimation and Allocation of Project Time Contingency.â Journal of Construction Engineering and Management, 137(4), 259-265. Basu, A. â4D Scheduling - A Case Study.â Proc., AACE International Annual Meeting, AACE International Transactions, PS121-PS126. Baweja, S., and Vidak, L. (2018). âCPM Scheduling and Pull Planning: Two Pillars of the Bridge to Innovation.â PM World Journal, 7(9), 1-20. Bayram, S. (2017). âDuration Prediction Models for Construction Projects: In Terms of Cost or Physical Characteristics?â KSCE Journal of Civil Engineering, 21(6), 2049-2060. Boholm, à ., Löfstedt, R., and Strandberg, U. (1998). âTunnelbygget genon Hallandasas: Lokalsamhallets dilemma [Construction of the tunnel through Hallandsas: the dilemma of the local community].â Gothenburg: CEFOS (Centre for Public Sector Research), Gothenburg University. Bordass, W., Leaman, A., and Eley, J. (2006). âA guide to feedback and post-occupancy evaluation.â Usable Buildings Trust. Boutilier, R. G., and Zdziarski, M. (2017). âManaging stakeholder networks for a social license to build.â Construction Management and Economics, 35(8-9), 498-513. Bromilow, F. âContract time performance expectations and the reality.â Proc., Building Forum, 70-80. Bruner, P. L., and O'Connor, P. J. (2002). Brunner and O'Connor on Construction Law, West Group, St. Paul, Minnesota. Bryden, J. E., and Mace, D. J. (2002). NCHRP Report 475: A Procedure for Assessing and Planning Nighttime Highway Construction and Maintenance. Transportation Research Board, Washington D.C.
121 Busby, J. S. (1999). âAn Assessment of Post-Project Reviews.â Project Management Journal, 30(3), 23-29. Caldas, C. H., Elkington, R. W. T., OâConnor, J. T., and Kim, J.-Y. (2015). âDevelopment of a Method to Retain Experiential Knowledge in Capital Projects Organizations.â Journal of Management in Engineering, 31(5), 04014083. Caldas, C. H., Gibson, G. E., Weerasooriya, R., and Yohe, A. M. (2009). âIdentification of Effective Management Practices and Technologies for Lessons Learned Programs in the Construction Industry.â Journal of Construction Engineering and Management, 135(6), 531-539. Caltrans (2001). âConstruction Contract Time.â Caltrans. Cantarelli, C. C., Flybjerg, B., Molin, E. J., and Van Wee, B. (2013). âCost overruns in large- scale transportation infrastructure projects: Explanations and their theoretical embeddedness.â arXiv preprint arXiv:1307.2176. Carrillo, P. (2005). âLessons learned practices in the engineering, procurement and construction sector.â Engineering, Construction and Architectural Management, 12(3), 236-250. Carrillo, P., Harding, J., and Choudhary, A. (2011). âKnowledge discovery from post-project reviews.â Construction Management and Economics, 29(7), 713-723. Carrillo, P., Ruikar, K., and Fuller, P. (2013). âWhen will we learn? Improving lessons learned practice in construction.â International Journal of Project Management, 31(4), 567-578. CDOT (2013). âDesign Bulletin: Construction Phasing.â Project Development Branch, Colorado Department of Transportation. CDOT (2014). âForm 859: Project Control Data - CDOT Construction Manual Appendix B.â Colorado Department of Transportation (CDOT). CDOT (2016). âDesign-Build Manual.â Colorado Department of Transportation (CDOT), Innovative Contracting Program, Denver, Colorado. CDOT (2018). âSection 108.8: Determination and Extension of Contract Time - CDOT Construction Manual.â Colorado Department of Transportation (CDOT). Cho, S., and Ballard, G. (2011). âLast Planner and Integrated Project Delivery.â Lean Construction Journal. Choi, K., Kwak Young, H., Pyeon, J.-H., and Son, K. (2012). âSchedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects.â Journal of Construction Engineering and Management, 138(3), 323-330. Choi, K., Lee, E. B., Ibbs, C. W., and Kim, Y. W. (2009). âMultifaceted public outreach and costâbenefit analysis for its effectiveness validation.â Construction Management and Economics, 27(8), 771-782. Choi, S., Kim, D. Y., Han, S. H., and Kwak, Y. H. (2014). âConceptual Cost-Prediction Model for Public Road Planning via Rough Set Theory and Case-Based Reasoning.â Journal of Construction Engineering and Management, 140(1), 04013026.
122 Chou, C.-C., Caldas, C. H., and O'Connor, J. T. (2007). Decision Support System for Combined Transportation and Utility Construction Strategy. Transportation Research Record, No. 1994, pp. 9â16. Collison, C., and Parcell, G. (2004). Learning to Fly, Capstone Publishing. Construction Industry Institute (CII) (2007). âEffective Management Practices and Technologies for Lessons Learned Programs âAustin, TX. Copas, T. L., and Pennock, H. A. (1978). NCHRP Synthesis 47: Effect of Weather on Highway Construction. Transportation Research Board, Washington, D.C. Czarnigowska, A., and Sobotka, A. (2014). âEstimating Construction Duration for Public Roads During the Preplanning Phase.â Journal of Engineering, Project, and Production Management, 4(1), 26-35. Dickerson III, C. L., Wang, J., Witherspoon, J., and Crumley, S. C. (2016). Work Zone Management in the District of Columbia: Deploying a Citywide Transportation Management Plan and Work Zone Project Management System. Transportation Research Record, No. 2554, pp. 37â45. Disterer, G. (2002). âManagement of project knowledge and experiences.â Journal of Knowledge Management, 6(5), 512-520. Dixit, V. â4D Modeling: Adding A New Dimension to CPM Scheduling.â Proc., AACE International Annual Meeting, AACE International Transactions, 10.11-10.18. Dodgson, M. (1993). âOrganizational learning: a review of some literatures.â Organization studies, 14(3), 375-394. Douglas, K., and Park, S.-B. (2003). âSelection criteria for using nighttime construction and maintenance operations: appendices.â Oregon. Dept. of Transportation. Research Unit. Du, J., and Bormann, J. (2014). âImproved Similarity Measure in Case-Based Reasoning with Global Sensitivity Analysis: An Example of Construction Quantity Estimating.â Journal of Computing in Civil Engineering, 28(6), 04014020. Duffy, G. A., Oberlender, G. D., and Jeong, D. H. S. (2011). âLinear Scheduling Model with Varying Production Rates.â Journal of Construction Engineering and Management, 137(8), 574-582. El-Gohary, K. M., Aziz, R. F., and Abdel-Khalek, H. A. (2017). âEngineering Approach Using ANN to Improve and Predict Construction Labor Productivity under Different Influences.â Journal of Construction Engineering and Management, 143(8). Ellis, R. D., and Thomas, H. R. (2003).The Root Causes of Delays in Highway Construction. Presented at 82nd Annual Meeting of the Transportation Research Board, Washington, D.C. Elrahman, O. (2008). âNight-time road construction operations synthesis of practice.â Ersahin, T., McCabe, B., and Doyle, M. (2003). âMonte Carlo Simulation Analysis at Lester B Pearson International Airport Development Project.â Construction Research Congress, 1- 8.
123 Farshchian, M. M., and Heravi, G. (2018). âProbabilistic Assessment of Cost, Time, and Revenue in a Portfolio of Projects Using Stochastic Agent-Based Simulation.â Journal of Construction Engineering and Management, 144(5), 04018028. FDOT (2010). âGuideline for Establishing Construction Contract Duration.â Florida Department of Transportation (FDOT). FDOT (2018). âSection 1.2: Contract Duration and Alternative Contracting Techniques - Construction Project Administration Manual.â Florida Department of Transportation (FDOT). Fernandez-Solis, J. L., Porwal, V., Lavy, S., Shafaat, A., Rybkowski, Z. K., Son, K., and Lagoo, N. (2013). âSurvey of Motivations, Benefits, and Implementation Challenges of Last Planner System Users.â Journal of Construction Engineering and Management, 139(4), 354-360. FHWA (2002). âFHWA Guide for Construction Contract Time Determination Procedures.â Federal Highway Administration, Washington, D.C. FHWA (2006). âDesign-Build Effectiveness Study - As Required by TEA-21 Section 1307(f): Final Report.â Federal Highway Administration (FHWA), 215. FHWA (2014). âContract Administration Core Curriculum Manual.â Federal Highway Administration, Washington, DC. FHWA (2016). âGuide for Creating and Maintaining 4D Models.â Federal Highway Administration (FHWA). FLH (2009). âConstruction Manual.â Federal Lands Highway (FLH), Federal Highway Administration (FHWA). FLH (2018). âChater 12: Right of Way and Utilities - Project Development and Design Manual (PDDM).â Federal Lands Highway (FLH), Federal Highway Administration (FHWA). Fong, P. S. W. (2005). âAspects of Learning and Knowledge in Construction Projects.â Construction Research Congress 2005, ASCE, 1-10. Freas, R. M., and Tipnis, K. S. (2014). âIs CPM Scheduling a Problem - Have We Forgotten the Process?â, AACE International. Garon, S. (2006). âSpace project management lessons learned: A powerful tool for success.â Journal of Knowledge Management, 10(2), 103-112. Garsden, B. R. (1995). âPostconstruction Evaluation.â Journal of Construction Engineering and Management, 121(1), 37-42. Garvin, D. A. (2003). Learning in Action: A Guide to Putting the Learning Organization to Work, Harvard Business Review Press. GDOT (2018). âDesign-Build Manual.â Georgia Department of Transportation (GDOT), Atlanta, Georgia. Goodrum, P. M., and Haas, C. T. (2004). âLong-Term Impact of Equipment Technology on Labor Productivity in the U.S. Construction Industry at the Activity Level.â Journal of Construction Engineering and Management, 130(1), 124-133.
124 Gransberg, D. D., and Shane, J. S. (2015). âDefining Best Value for Construction Manager/General Contractor Projects: The CMGC Learning Curve.â Journal of Management in Engineering, 31(4), 04014060. Guevremont, M., and Germain, C. â4D Scheduling Using Delmia and Microsoft Project on Hydroelectric Construction Projects.â Proc., AACE International Annual Meeting, AACE Internatinal Transactions. Gündüz, M., Nielsen, Y., and Ãzdemir, M. (2013). âQuantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey.â Journal of Management in Engineering, 29(2), 133-139. Hall, N. G. (2012). âProject management: Recent developments and research opportunities.â Journal of Systems Science and Systems Engineering, 21(2), 129-143. Hanna, A. S., Chang, C.-K., Sullivan, K. T., and Lackney, J. A. (2008). âImpact of Shift Work on Labor Productivity for Labor Intensive Contractor.â Journal of Construction Engineering and Management, 134(3), 197-204. Hanna, A. S., and Iskandar, K. A. (2018). âFactors Affecting Construction Labor Productivity: Qualitative and Quantitative Assessment.â Construction Research Congress 2018, 597- 607. Hanna, A. S., Taylor, C. S., and Sullivan, K. T. (2005). âImpact of Extended Overtime on Construction Labor Productivity.â Journal of Construction Engineering and Management, 131(6), 734-739. Hannon, J. J. (2007). Emerging technologies for construction delivery, Transportation Research Board. Harmelink, D. J., and Rowings, J. E. (1998). âLinear Scheduling Model: Development of Controlling Activity Path.â Journal of Construction Engineering and Management, 124(4), 263-268. Harmelink, D. J., and Yamin, R. A. (2001). âDevelopment and application of linear scheduling techniques to highway construction projects.â Hegazy, T., and Ayed, A. (1998). âNeural Network Model for Parametric Cost Estimation of Highway Projects.â Journal of Construction Engineering and Management, 124(3), 210- 218. Henderson, J. R., Ruikar, K., and Dainty, A. R. (2010). âCreating a project-based learning-loop within the construction phase of healthcare infrastructure projects.â HaCIRIC10, 12. Henderson, J. R., Ruikar, K. D., and Dainty, A. R. J. (2013). âThe need to improve doubleâloop learning and designâconstruction feedback loops: A survey of industry practice.â Engineering, Construction and Architectural Management, 20(3), 290-306. Heravi, G., and Eslamdoost, E. (2015). âApplying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity.â Journal of Construction Engineering and Management, 141(10), 04015032. Herbsman, Z. J., and Ellis, R. (1995). NCHRP Synthesis 215: Determination of Contract Time for Highway Construction Projects. Transportation Research Board, Washington, D.C.
125 Hinze, J., and Couey, J. (1989). âWeather in Construction Contracts.â Journal of Construction Engineering and Management, 115(2), 270-283. Hoffman, G. J., Thal, A. E., Webb, T. S., and Weir, J. D. (2007). âEstimating Performance Time for Construction Projects.â Journal of Management in Engineering, 23(4), 193-199. Hu, X., Xia, B., Skitmore, M., and Chen , Q. (2016). âThe application of case-based reasoning in construction management research: An overview.â Automation in Construction, 72(2), 65-74. Ibbs, W. (2005). âImpact of Change's Timing on Labor Productivity.â Journal of Construction Engineering and Management, 131(11), 1219-1223. Ibbs, W. (2012). âConstruction Change: Likelihood, Severity, and Impact on Productivity.â Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 4(3), 67-73. IDOT (2017). âChapter 66: Contract Processing - Bureau of Design and Environment Manual.â Illinois Department of Transportation (IDOT), Springfield, Illinois. Ioannou, P. G., and Yang, I.-T. (2016). âRepetitive Scheduling Method: Requirements, Modeling, and Implementation.â Journal of Construction Engineering and Management, 142(5), 04016002. Iowa DOT (2017). â11. Contract Periods/Innovative Contracting - Letting Guidelines.â Iowa Department of Transportation (Iowa DOT), Office of Contracts. Ipsilandis, P. G. (2007). âMultiobjective Linear Programming Model for Scheduling Linear Repetitive Projects.â Journal of Construction Engineering and Management, 133(6), 417-424. Irfan, M., Khurshid, M. B., Anastasopoulos, P., Labi, S., and Moavenzadeh, F. (2011). âPlanning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type.â International Journal of Project Management, 29(1), 78-92. ITD (2011). âContract Time Development in Project Development.â Idaho Transportation Department (ITD). Jafarzadeh, R., Ingham, J. M., Wilkinson, S., González, V., and Aghakouchak, A. A. (2014). âApplication of Artificial Neural Network Methodology for Predicting Seismic Retrofit Construction Costs.â Journal of Construction Engineering and Management, 140(2), 04013044. Jarkas, A. M. (2016). âPredicting Contract Duration for Building Construction: Is Bromilowâs Time-Cost Model a Panacea?â Journal of Management in Engineering, 32(1), 1-8. Jeong, H. D., Le, C., and Devaguptapu, V. (2019). âEffective Production Rate Estimation Using Construction Daily Work Report Data.â Montana. Dept. of Transportation. Research Programs. Jeong, H. S., Oberlender, G., Atreya, S., and Akella, V. (2008). âDevelopment of an Improved System for Contract Time Determination (Phase I & II).â
126 Ji, S.-H., Park, M., and Lee, H.-S. (2012). âCase Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea.â Journal of Construction Engineering and Management, 138(1), 43-52. Ji, S.-H., Park, M., Lee, H.-S., Ahn, J., Kim, N., and Son, B. (2011). âMilitary Facility Cost Estimation System Using Case-Based Reasoning in Korea.â Journal of Computing in Civil Engineering, 25(3), 218-231. Jiang, Y. âThe effects of traffic flow rates at freeway work zones on asphalt pavement construction productivity.â Proc., Journal of the Transportation Research Forum, Transportation Research Forum, 83-103. Jiang, Y., and Wu, H. (2007). âProduction Rates of Highway Construction Activities.â International Journal of Construction Education and Research, 3(2), 81-98. Jin, R., Han, S., Hyun, C., and Cha, Y. (2016). âApplication of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects.â Journal of Construction Engineering and Management, 142(2). Jin, R., Han, S., Hyun, C., and Kim, J. (2014). âImproving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model.â Journal of Construction Engineering and Management, 140(7), 04014025. Jonasson, S., Dunston, P. S., Ahmed, K., and Hamilton, J. (2002). âFactors in Productivity and Unit Cost for Advanced Machine Guidance.â Journal of Construction Engineering and Management, 128(5), 367-374. Jun, D. H., and El-Rayes, K. (2011). âFast and Accurate Risk Evaluation for Scheduling Large- Scale Construction Projects.â Journal of Computing in Civil Engineering, 25(5), 407-417. Kalugin, Y. B. (2016). âUniversal method for calculation of reliable completion times.â Magazine of Civil Engineering, 67(7). Kamara, J. M., Anumba, C. J., and Evbuomwan, N. F. O. (2002). Capturing Client Requirements in Construction Projects, Thomas Telford, London, UK. Kärnä, S., and Junnonen, J.-M. âProject feedback as a tool for learning.â Proc., Annual Conference of the International Group for Lean Construction, 47-55. Kartam, N., and Flood, I. (1997). âConstructability Feedback Systems: Issues and Illustrative Prototype.â Journal of Performance of Constructed Facilities, 11(4), 178-183. Kartam, N. A. (1996). âMaking Effective Use of Construction Lessons Learned in Project Life Cycle.â Journal of Construction Engineering and Management, 122(1), 14-21. Kerzner, H. (2017). Project Management: A Systems Approach to Planning, Scheduling, and Controlling, John Wiley & Sons. Khamooshi, H., and Cioffi, D. F. (2013). âUncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling.â Journal of Construction Engineering and Management, 139(5), 488-497. Kim, B.-s., and Hong, T. (2012). âRevised Case-Based Reasoning Model Development Based on Multiple Regression Analysis for Railroad Bridge Construction.â Journal of Construction Engineering and Management, 138(1), 154-162.
127 Kim, G.-H., An, S.-H., and Kang, K.-I. (2004). âComparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning.â Building and Environment, 39(10), 1235-1242. Kivrak, S., Arslan, G., Dikmen, I., and Birgonul, M. T. (2008). âCapturing Knowledge in Construction Projects: Knowledge Platform for Contractors.â Journal of Management in Engineering, 24(2), 87-95. Koo, C., Hong, T., Hyun, C., and Koo, K. (2010). âA CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects.â Canadian Journal of Civil Engineering, 37(5), 739-752. KYTC (2017). âHighway Design Guidance Manual.â Kentucky Transportation Cabinet (KYTC). Le, C., and Jeong, H. D. âA Daily Work Report Based Approach for Schedule Risk Analysis.â Springer Singapore, 1131-1136. Le, C., Jeong, H. D., Le, T., and Kang, Y. (2020). âEvaluating Contractorsâ Production Performance in Highway Projects Using Historical Daily Work Report Data.â Journal of Management in Engineering, 36(3), 04020015. Lee, D.-E. (2005). âProbability of Project Completion Using Stochastic Project Scheduling Simulation.â Journal of Construction Engineering and Management, 131(3), 310-318. Lee, D.-E., and Arditi, D. (2006). âAutomated Statistical Analysis in Stochastic Project Scheduling Simulation.â Journal of Construction Engineering and Management, 132(3), 268-277. Lee, D.-E., Arditi, D., and Son, C.-B. (2013). âThe probability distribution of project completion times in simulation-based scheduling.â KSCE Journal of Civil Engineering, 17(4), 638- 645. Lee, E.-B., and Ibbs, C. W. (2005). âComputer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies.â Journal of Construction Engineering and Management, 131(4), 449-458. Lee, E.-B., Ibbs, C. W., Harvey, J. T., and Roesler, J. R. (2000). Construction Productivity and Constraints for Concrete Pavement Rehabilitation in Urban Corridors. Transportation Research Record, No. 1712, pp. 13â22. Lhee, S. C., Issa, R. R. A., and Flood, I. (2012). âPrediction of Financial Contingency for Asphalt Resurfacing Projects using Artificial Neural Networks.â Journal of Construction Engineering and Management, 138(1), 22-30. Li, Y., Lu, K., and Lu, Y. (2017). âProject Schedule Forecasting for Skyscrapers.â Journal of Management in Engineering, 33(3). Liu, S.-S., and Wang, C.-J. (2012). âOptimizing linear project scheduling with multi-skilled crews.â Automation in Construction, 24, 16-23. Liu, T.-H., and Yoon, Y. (2019). âDevelopment of enhanced emission factor equations for paved and unpaved roads using artificial neural network.â Transportation Research Part D: Transport and Environment, 69, 196-208.
128 Love, P. E. D., Li, H., Irani, Z., and Faniran, O. (2000). âTotal quality management and the learning organization: a dialogue for change in construction.â Construction Management and Economics, 18(3), 321-331. Lu, M., and Li, H. (2003). âResource-Activity Critical-Path Method for Construction Planning.â Journal of Construction Engineering and Management, 129(4), 412-420. Lucko, G. (2009). âProductivity Scheduling Method: Linear Schedule Analysis with Singularity Functions.â Journal of Construction Engineering and Management, 135(4), 246-253. Mackova, M., Kozlovska, M., Baskova, R., Spisakova, M., and Krajnikova, K. (2017). âConstruction-duration prediction model for residential buildings in Slovak Republic based on computer simulation.â International Journal of Applied Engineering Research, 12(13), 3590-3599. Majid, M. Z. A., and McCaffer, R. (1998). âFactors of Non-Excusable Delays That Influence Contractors' Performance.â Journal of Management in Engineering, 14(3), 42-49. MassDOT (2014). âConstruction Contract Time Determination Guidelines for Designers/Planners.â Massachusetts Department of Transportation, Massachusetts. Mattila, K. G., and Park, A. (2003). âComparison of Linear Scheduling Model and Repetitive Scheduling Method.â Journal of Construction Engineering and Management, 129(1), 56- 64. MDOT (2019). âMichigan Department of Transportation Road Design Manual.â Michigan Department of Transportation. MDT (2008). âContract time determination procedures.â Montana Department of Transportation, Montana. Mensah, I., Adjei-Kumi, T., and Nani, G. (2016). âDuration determination for rural roads using the principal component analysis and artificial neural network.â Engineering, Construction and Architectural Management, 23(5), 638-656. Mete, F., Chen, Y., Stathopoulos, A., and Corr, D. J. (2019). Comparative Study of Predictive Analysis Methods to Estimate Bridge Response. Transportation Research Record, No. 2673, pp. 365â376. MnDOT (2005). âDetermination of Contract Time.â Minnesota Department of Transportation. MoDOT (2004). âContract Time Determination.â Missouri Department of Transportation (MoDOT). Molenaar, K., Loulakis, M., and Ferragut, T. (2014). Guide for the Process of Managing Risk on Rapid Renewal Projects. Molenaar, K. R. (2006). Guide to risk assessment and allocation for highway construction management, Federal Highway Administration. Mostafavi, A., Valentin, V., Abraham, D. M., and Louis, J. (2012). âAssessment of the Productivity of Nighttime Asphalt Paving Operations.â Journal of Construction Engineering and Management, 138(12), 1421-1432. Mubarak, S. A. (2015). Construction Project Scheduling and Control, Wiley, Hoboken, New Jersey.
129 Mullen, R. L., Huynh, N., Ahmed, F., and Padmanabhan, B. (2018). âBetter Construction Project Management through Better Scheduling.â University of South Carolina and South Carolina Department of Transportation. Mustafa, M. R., Rezaur, R. B., Saiedi, S., Rahardjo, H., and Isa, M. H. (2013). âEvaluation of MLP-ANN Training Algorithms for Modeling Soil Pore-Water Pressure Responses to Rainfall.â Journal of Hydrologic Engineering, 18(1), 50-57. Naik, M. G., and Kumar, D. T. (2015). âConstruction Project Cost and Duration Optimization Using Artificial Neural Network.â AEI 2015, 433-444. NASA (2018). âNASA Engineering Network Communities of Practice.â <https://www.nasa.gov/content/nasa-engineering-network-communities-of- practice/index.html>. Nasir, D., McCabe, B., and Hartono, L. (2003). âEvaluating Risk in Construction-Schedule Model (ERIC-S): Construction Schedule Risk Model.â Journal of Construction Engineering and Management, 129(5), 518-527. Newitt, J. S. (2009). Construction Scheduling : Principles and Practices, Prentice Hall, Columbus, Ohio. Ng, S. T., Xie, J., Cheung, Y. K., and Jefferies, M. (2007). âA simulation model for optimizing the concession period of publicâprivate partnerships schemes.â International Journal of Project Management, 25(8), 791-798. Nguyen, L. D., Nguyen, T. K. N., Tran, D. Q., and Villiers, C. (2014). âProductivity in Daytime and Nighttime Construction of Urban Sewer Systems.â Journal of Construction Engineering and Management, 140(7), 04014021. Nguyen, L. D., Phan, D. H., and Tang, L. C. M. (2013). âSimulating Construction Duration for Multistory Buildings with Controlling Activities.â Journal of Construction Engineering and Management, 139(8), 951-959. NJDOT (2008). âConstruction Scheduling Guidelines.â New Jersey Department of Transportation (NJDOT). NJDOT (2013). âConstruction Scheduling Manual.â New Jersey Department of Transportation (NJDOT). Noori, R., Deng, Z., Kiaghadi, A., and Kachoosangi, F. T. (2016). âHow Reliable Are ANN, ANFIS, and SVM Techniques for Predicting Longitudinal Dispersion Coefficient in Natural Rivers?â Journal of Hydraulic Engineering, 142(1), 04015039. NYSDOT (2017). âHighway Design Manual â Chapter 16: Maintenance and Protection of Traffic in Highway Work Zones.â Office of Design, New York State Department of Transportation. Ãkmen, Ã., and ÃztaÅ, A. (2008). âConstruction Project Network Evaluation with Correlated Schedule Risk Analysis Model.â Journal of Construction Engineering and Management, 134(1), 49-63. Olander, S., and Landin, A. (2005). âEvaluation of stakeholder influence in the implementation of construction projects.â International Journal of Project Management, 23(4), 321-328.
130 Osman, H. (2016). âCoordination of urban infrastructure reconstruction projects.â Structure and Infrastructure Engineering, 12(1), 108-121. PeÅ¡ko, I., MuÄenski, V., Å eÅ¡lija, M., RadoviÄ, N., Vujkov, A., BibiÄ, D., and KrkljeÅ¡, M. (2017). âEstimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM.â Complexity, 2017, 1-13. Petroutsatou, K., Georgopoulos, E., Lambropoulos, S., and Pantouvakis, J. P. (2012). âEarly Cost Estimating of Road Tunnel Construction Using Neural Networks.â Journal of Construction Engineering and Management, 138(6), 679-687. Pierce, D. R. (2014). Project scheduling and management for construction, John Wiley & Sons. Reilly, J., McBride, M., Sangrey, D., MacDonald, D., and Brown, J. (2004). âThe development of a new cost-risk estimating process for transportation infrastructure projects.â Civil engineering practice, 19(1), 53-75. RH & Associates Inc. (2012). âADOT Process Improvement Review Report - Construction Manager at Risk (CMAR).â Arizona Department of Transportation. Richert, T. (2017). âWhat is the Last Planner System?â Lean Construction Blog, <https://leanconstructionblog.com/What-is-the-Last-Planner-System.html>. Rowings, J. E., and Rahbar, F. (1992). Use of Linear Scheduling In Transportation Projects. Transportation Research Record, No. 1351, pp. 21â31. Rubin, D. K. (2005). âExecs Believe Managing Risk is their Biggest Challenge.â Engineering News Record November, 28, 16. Ryu, H.-G., Lee, H.-S., and Park, M. (2007). âConstruction Planning Method Using Case-Based Reasoning (CONPLA-CBR).â Journal of Computing in Civil Engineering, 21(6), 410- 422. Salem, O., Basu, B., Miller, R., Randall, J., Swanson, J., and Engel, R. (2006). âAccelerating the Construction of a Highway Bridge in Ohio.â Practice Periodical on Structural Design and Construction, 11(2), 98-104. Santoso, D. S., and Soeng, S. (2016). âAnalyzing Delays of Road Construction Projects in Cambodia: Causes and Effects.â Journal of Management in Engineering, 32(6), 05016020. SC Department of Archives and History âMitigation.â <https://scdah.sc.gov/historic- preservation/programs/review-compliance/mitigation>. Schumacher, H. E., and Nardella, D. J. âLean Construction Planning Implementation.â Proc., AACE International Annual Meeting, AACE International Transactions, PS 1604-PS 1616. Shah, J. S. âBuilding Information Modeling for Infrastructure Projects - Emphasis on 4D, 5D and 6D.â Proc., AACE International Annual Meeting, AACE International Transactions. Sharma, H., McIntyre, C., Gao, Z., and Nguyen, T.-H. (2009). âDeveloping a Traffic Closure Integrated Linear Schedule for Highway Rehabilitation Projects.â Journal of Construction Engineering and Management, 135(3), 146-155.
131 Sharma, S., and Bansal, V. K. (2018). âLocation-based planning and scheduling of highway construction projects in hilly terrain using GIS.â Canadian Journal of Civil Engineering, 45(7), 570-582. SHC Section 84.5 âDivision 1, Chapter 1, Article 2 California Transportation Commission.â Shehata, M. M., Khalek, H. A., and Hakam, M. A. (2012). âSimulation Analysis for Productivity and Unit Cost by Implementing GPS Machine Guidance in Road Construction Operation in Egypt.â ICSDEC 2012, 642-653. Shrestha, K. J., Le, C., Jeong, H. D., and Le, T. âMining Daily Work Report Data for Detecting Patterns of Construction Sequences.â Proc., Creative Construction Conference 2019, 578-583. Siemieniuch, C. E., and Sinclair, M. A. (1999). âOrganizational aspects of knowledge lifecycle management in manufacturing.â International Journal of Human-Computer Studies, 51(3), 517-547. Sillars, D. N., Hallowell, M., and Armijos, J. P. (2009). âDevelopment of a Decision Model for Selection of Appropriate Timely Delivery Techniques for Highway Projects.â Oregon Department of Transportation and Federal Highway Administration. Simonsson, P., Björnfot, A., Erikshammar, J., and Olofsson, T. (2012). ââLearning to seeâthe effects of improved workflow in civil engineering projects.â Song, L., and AbouRizk, S. M. (2008). âMeasuring and Modeling Labor Productivity Using Historical Data.â Journal of Construction Engineering and Management, 134(10), 786- 794. Sukumaran, P., Bayraktar, M. E., Hong, T., and Hastak, M. (2006). âModel for Analysis of Factors Affecting Construction Schedule in Highway Work Zones.â Journal of Transportation Engineering, 132(6), 508-517. Tan, H. C., Carrillo, P., Anumba, C., Kamara, J. M., Bouchlaghem, D., and Udeaja, C. (2006). âLive capture and reuse of project knowledge in construction organisations.â Knowledge Management Research & Practice, 4(2), 149-161. Tang, Y., Liu, R., and Sun, Q. (2014). âTwo-Stage Scheduling Model for Resource Leveling of Linear Projects.â Journal of Construction Engineering and Management, 140(7), 04014022. Tapia, R. M., Gransberg, D. D., and Touran, A. (2017). âManaging Scheduling Risk Due to Geotechnical Uncertainty Using Linear Scheduling.â Taylor, T. R., Brockman, M., Zhai, D., Goodrum, P. M., and Sturgill, R. âAccuracy analysis of selected tools for estimating contract time on highway construction projects.â Proc., Construction Research Congress 2012 American Society of Civil Engineers. Taylor, T. R., Goodrum, P. M., Brockman, M., Bishop, B., Shan, Y., Sturgill, R. E., and Hout, K. (2013). âUpdating the Kentucky Contract Time Determination System.â Taylor, T. R. B., Sturgill, R. E., and Li, Y. (2017). Practices for Establishing Contract Completion Dates for Highway Projects.
132 Thompson, R. C. J., Lucko, G., and Su, Y. (2016). âReconsidering an Appropriate Probability Distribution Function for Construction Simulations.â Construction Research Congress 2016, 2522-2531. Tokdemir, O. B., Erol, H., and Dikmen, I. (2019). âDelay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation.â Journal of Construction Engineering and Management, 145(2), 04018132. TxDOT (2018a). âAccelerated Construction Guidelines.â Texas Department of Transportation (TxDOT). TxDOT (2018b). âContract Time Determination Guidance.â Texas Department of Transportation (TxDOT). TxDOT (2020). âConstruction Production Rates.â Texas Department of Transportation. Uher, T. E. (2003). Programming and Scheduling Techniques, UNSW Press. US Army (1997). âCenter for Army Lessons Learned Handbook.â US Army, Fort Leavenworth. US Army (2011). âEstablishing a Lessons Learned Program.â US Army Center for Army Lessons Learned. VDOT (2007). âContract Time Determination Guidelines.â Virginia Department of Transportation (VDOT). VDOT (2019). âAppendix A: Design Guidelines - Road Design Manual.â Virginia Department of Transportation (VDOT). Volk, M. J., Jeong, R. S., and Shane, J. S. (2018). âEffective Post-Construction Evaluation Practices for Work Zone Management Strategies.â Transportation Research Record, No. 2672(26), pp. 106â113. Wang, Y.-R., and Gibson, G. E. (2010). âA study of preproject planning and project success using ANNs and regression models.â Automation in Construction, 19(3), 341-346. Waziri, B. S., Jibrin, A. T., and Kadai, B. (2014). âFunctional Duration Models For Highway Construction Projects In Nigeria.â Arid Zone Journal of Engineering, Technology and Environment, 10, 13-23. White, D. J., Jahren, C. T., Vennapusa, P., Westort, C., Alhasan, A. A., Turkan, Y., Guo, F., Hannon, J., Dubree, A., and Sulbaran, T. (2018). âUse of automated machine guidance within the transportation industry.â WisDOT (2015). âChapter 19: Plans, Specifications and Estimates - Facilities Development Manual.â Wisconsin Department of Transportation (WisDOT). Woldesenbet, A., Jeong, D. H. S., and Oberlender, G. D. (2012). âDaily Work Reports-Based Production Rate Estimation for Highway Projects.â Journal of Construction Engineering and Management, 138(4), 481-490. Woo, J.-H., Clayton, M. J., Johnson, R. E., Flores, B. E., and Ellis, C. (2004). âDynamic Knowledge Map: reusing experts' tacit knowledge in the AEC industry.â Automation in Construction, 13(2), 203-207.
133 World Bank Group (2006). âe-Development - From Strategy to Implementation: Lessons Learned in Wolrd Bank - Funded âICT for Developmentâ Projects.â WSDOT (2013a). âAppendix 6 : Determination of Contract Time - Plans Preparation Manual.â Washington State Department of Transportation (WSDOT). WSDOT (2013b). âChapter 610: Investigation of Soils, Rock, and Surfacing Materials - Design Manual.â Washington State Department of Transportation (WSDOT). WSDOT (2018). âDesign-Build Manual.â Washington State Department of Transportation (WSDOT). WSDOT (2019). âChapter 6: Project Delivery and Utility Relocation - Utilities Manual.â Washington State Department of Transportation. WVDOT (2013). âDesign Directive 803: Determination of Contract Completion Date.â West Virginia Department of Transportation (WVDOT). YamÃn, R. A., and Harmelink, D. J. (2001). âComparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM).â Journal of Construction Engineering and Management, 127(5), 374-381. Yang, I.-T. (2004). âScheduling Pipeline Projects: To Remedy Deficiencies of CPM and LOB.â Pipeline Engineering and Construction, 1-10. Yu, A. T. W., Shen, Q., Kelly, J., and Hunter, K. (2006). âInvestigation of Critical Success Factors in Construction Project Briefing by Way of Content Analysis.â Journal of Construction Engineering and Management, 132(11), 1178-1186. Yu, C. Y., and Lam, K. C. (2013). âA Decision Support System for the determination of concession period length in transportation project under BOT contract.â Automation in Construction, 31, 114-127. Yuksel, I. T., and O'Connor, J. T. (2000). Schedule compression of an urban highway project using the linear scheduling method, Citeseer. Zhai, D., Shan, Y., Sturgill, R. E., Taylor, T. R. B., and Goodrum, P. M. (2016). Using Parametric Modeling to Estimate Highway Construction Contract Time. Transportation Research Record, No. 2573, pp. 1â9. Zou, X., Zhang, Q., and Zhang, L. (2018). âModeling and Solving the Deadline Satisfaction Problem in Line-of-Balance Scheduling.â Journal of Management in Engineering, 34(1), 04017044.