Skip to main content

Search results for "marginal private"

Viewing 1 - 20 of 53 results by relevance

Precast Concrete Pavement Technology  (2012)

Guidelines for the Preservation of High-Traffic-Volume Roadways  (2011)

Developing the "Guide for the Process of Managing Risk on Rapid Renewal Projects"  (2014)

Pilot Testing of SHRP 2 Reliability Data and Analytical Products: Washington  (2014)

Encouraging Innovation in Locating and Characterizing Underground Utilities  (2009)

Innovative Bridge Designs for Rapid Renewal  (2014)

Guide to Using Existing Pavement in Place and Achieving Long Life  (2014)

Tools for Communicating Railroad-DOT Mitigation Strategies  (2014)

Evaluating Applications of Field Spectroscopy Devices to Fingerprint Commonly Used Construction Materials (Phase IV–Implementation)  (2014)

Identification of Utility Conflicts and Solutions: Pilot Implementation of the SHRP 2 R15B Products at the Maryland State Highway Administration  (2014)

E-Learning for Training Traffic Incident Responders and Managers  (2014)

Identification of Utility Conflicts and Solutions  (2012)

Pre-Implementation of Infrared and Ground-Penetrating Radar Technologies for Improving Asphalt Mixture Quality  (2014)

Communicating Railroad–DOT Mitigation Strategies  (2014)

A Plan for Developing High-Speed, Nondestructive Testing Procedures for Both Design Evaluation and Construction Inspection  (2009)

Nondestructive Testing to Identify Delaminations Between HMA Layers: Phase III–Develop User Guidelines  (2014)

Development of the Geoconstruction Information and Technology Selection Guidance System  (2014)

Geotechnical Solutions for Soil Improvement, Rapid Embankment Construction, and Stabilization of the Pavement Working Platform  (2012)

Innovations to Locate Stacked or Deep Utilities  (2014)

Using Infrared and High-Speed Ground-Penetrating Radar for Uniformity Measurements on New HMA Layers  (2012)